Final Mitigation Monitoring and Reporting Program (MMRP)
Final Mitigation Monitoring and Reporting Program (MMRP)
Final Mitigation Monitoring and Reporting Program (MMRP)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Los Angeles Harbor Department Section 2 <strong>Mitigation</strong> <strong>Monitoring</strong> <strong>and</strong> <strong>Reporting</strong> <strong>Program</strong><br />
Table 2-1. <strong>Mitigation</strong> <strong>and</strong> Lease Measures <strong>Monitoring</strong> <strong>and</strong> <strong>Reporting</strong> <strong>Program</strong> Summary for the SCIG Project<br />
<strong>Mitigation</strong> Measure <strong>and</strong> Lease Measure Timing <strong>and</strong> Methods Responsible Parties<br />
Aesthetics<br />
For mitigation measures that address significant impacts under<br />
Impact AES-1, see <strong>Mitigation</strong> Measures MM CR-2 <strong>and</strong> MM<br />
CR-3, below, under Cultural Resources.<br />
Air Quality<br />
MM AQ-1. Fleet Modernization for Off-Road Equipment. Timing: Prior to <strong>and</strong> during construction.<br />
1. Construction equipment shall incorporate, where<br />
feasible, emissions savings technology such as hybrid drives<br />
<strong>and</strong> specific fuel economy st<strong>and</strong>ards.<br />
2. Idling shall be restricted to a maximum of 5 minutes<br />
when not in use.<br />
3. Tier Specifications:<br />
a. From January 1, 2012, to December 31, 2014: All offroad<br />
diesel-powered construction equipment greater than 50<br />
hp, except marine vessels <strong>and</strong> harbor craft, will meet Tier-3<br />
off-road emission st<strong>and</strong>ards at a minimum. In addition, all<br />
construction equipment greater than 50 hp will be retrofitted<br />
with a CARB-verified Level 3 DECS. Per Port’s<br />
Construction Guidelines, for CEQA Project, in 2012 to 2014,<br />
construction equipment shall meet 50% Tier 3 Level 3, 20%<br />
Tier 2 Level 3, 10% Tier 1 Level 3, 10% Tier 2 Level 2, <strong>and</strong><br />
10% Tier 1 Level 2.<br />
b. Post-January 1, 2015 on: All off-road diesel-powered<br />
construction equipment greater than 50 hp, except marine<br />
vessels <strong>and</strong> harbor craft, will meet Tier-4 off-road emission<br />
st<strong>and</strong>ards at a minimum. Per Port’s Construction Guidelines,<br />
for CEQA Project, in 2015 <strong>and</strong> going forward, construction<br />
equipment shall meet 50% Tier 4, Tier 3 Level 3, 20% Tier 3<br />
Level 3, 10% Tier 1 Level 3, 10% Tier 2 Level 2, <strong>and</strong> 10%<br />
Tier 1 Level 2.<br />
Methods: This measure shall be incorporated into<br />
BNSF’s <strong>and</strong> Alternate Business Location Tenants’ bid<br />
<strong>and</strong> contract specifications approved by LAHD for all<br />
construction work to reduce the impacts of construction<br />
diesel emissions. The contractor(s) shall submit an<br />
Environmental Compliance Plan for review <strong>and</strong><br />
approval by BNSF <strong>and</strong> Tenants prior to beginning any<br />
construction activity. The contractor(s) shall adhere to<br />
these specifications throughout construction phases.<br />
Enforcement shall include oversight by BNSF’s <strong>and</strong><br />
Tenants’ project/construction managers or designated<br />
building inspectors to ensure compliance with contract<br />
specifications.<br />
The construction equipment measures shall be met,<br />
unless one of the following circumstances exist <strong>and</strong> the<br />
contractor is able to provide proof that any of these<br />
circumstances exists:<br />
• A piece of specialized equipment is unavailable in a<br />
controlled form within the state of California,<br />
including through a leasing agreement.<br />
• A contractor has applied for necessary incentive<br />
funds to put controls on a piece of uncontrolled<br />
equipment planned for use on the project, but the<br />
application process is not yet approved, or the<br />
application has been approved, but funds are not yet<br />
available.<br />
Implementation: BNSF <strong>and</strong> Alternate Business<br />
Location Tenants through Construction Contractors<br />
<strong>Monitoring</strong> <strong>and</strong> <strong>Reporting</strong>:<br />
LAHD, Environmental Management Division,<br />
Construction Management Division<br />
SCIG <strong>Final</strong> EIR 2-4