Los Angeles Harbor Department Section 2 <strong>Mitigation</strong> <strong>Monitoring</strong> <strong>and</strong> <strong>Reporting</strong> <strong>Program</strong><br />

MM GHG-6: Energy Efficient Light Bulbs.<br />

In addition to the SCIG facility main administration building,<br />

which would be LEED certified, all other interior buildings<br />

shall exclusively use energy efficient light bulbs (compact<br />

florescent, LED, or other equally efficient) for ambient<br />

lighting. The Tenants on their alternate locations on Portowned<br />

property shall also maintain <strong>and</strong> replace any Portsupplied<br />

energy efficient light bulbs. CFL <strong>and</strong> LED bulbs<br />

produce less waste heat <strong>and</strong> use substantially less electricity<br />

than inc<strong>and</strong>escent light bulbs.<br />

MM GHG-7: Energy Audit.<br />

The Tenant shall conduct a third party energy audit every 5<br />

years <strong>and</strong> install innovative power saving technology where<br />

feasible, such as power factor correction systems <strong>and</strong> lighting<br />

power regulators. Such systems help to maximize usable<br />

electric current <strong>and</strong> eliminate wasted electricity, thereby<br />

lowering overall electricity use.<br />

Timing: Prior to <strong>and</strong> during Project construction <strong>and</strong><br />

throughout Project operation.<br />

Methods: For newly constructed buildings, this measure<br />

shall be incorporated into BNSF’s <strong>and</strong> Tenants’ design<br />

<strong>and</strong> bid <strong>and</strong> contract specifications. The contractor(s)<br />

shall adhere to these specifications throughout<br />

construction phases. Enforcement shall include<br />

oversight by BNSF’s <strong>and</strong> Tenants’ project/construction<br />

managers or designated building inspectors to ensure<br />

compliance with contract specifications.<br />

For all buildings: This measure shall be incorporated<br />

into the lease agreements <strong>and</strong> shall be implemented<br />

initially by LAHD, <strong>and</strong> thereafter by the tenant. Biannual<br />

tenant compliance reports shall be supplied to the<br />

LAHD Environmental Management Division.<br />

Enforcement shall include oversight by the Real Estate<br />

Division.<br />

Timing: Prior to <strong>and</strong> during Project construction <strong>and</strong><br />

throughout Project operation (every five years).<br />

Methods: This measure shall be incorporated into<br />

BNSF’s <strong>and</strong> Tenants’ design <strong>and</strong> bid <strong>and</strong> contract<br />

specifications approved by LAHD. The contractor shall<br />

adhere to these specifications throughout construction<br />

phases. Enforcement shall include oversight by BNSF’s<br />

<strong>and</strong> Tenants’ project/construction manager or designated<br />

building inspectors to ensure compliance with contract<br />

specifications.<br />

This measure shall also be incorporated into the lease<br />

agreements. A compliance report shall be supplied to<br />

the LAHD Environmental Management Division within<br />

six months of every energy audit. Enforcement shall<br />

include oversight by the Real Estate Division.<br />

Implementation: BNSF <strong>and</strong> Tenants through<br />

Construction Contractor, <strong>and</strong> BNSF <strong>and</strong> Tenants<br />

<strong>Monitoring</strong> <strong>and</strong> <strong>Reporting</strong>:<br />

LAHD, Environmental Management, Construction<br />

Management <strong>and</strong> Real Estate Divisions<br />

Implementation: BNSF <strong>and</strong> Tenants through<br />

Construction Contractor, <strong>and</strong> BNSF<br />

<strong>Monitoring</strong> <strong>and</strong> <strong>Reporting</strong>:<br />

LAHD, Environmental Management, <strong>and</strong> Real Estate<br />

Divisions<br />

SCIG <strong>Final</strong> EIR 2-20