Los Angeles Harbor Department Section 2 <strong>Mitigation</strong> <strong>Monitoring</strong> <strong>and</strong> <strong>Reporting</strong> <strong>Program</strong><br />

below) demonstrates that temporary barriers are not<br />

necessary.<br />

d) Construction Equipment. Properly muffle <strong>and</strong> maintain all<br />

construction equipment powered by internal combustion<br />

engines.<br />

e) Idling Prohibitions. Prohibit unnecessary idling of internal<br />

combustion engines near noise sensitive areas.<br />

f) Equipment Location. Locate all stationary noise-generating<br />

construction equipment, such as air compressors <strong>and</strong> portable<br />

power generators, as far as is practical from existing noise<br />

sensitive l<strong>and</strong> uses.<br />

g) Quiet Equipment Selection. Select quiet construction<br />

equipment whenever possible.<br />

h) Notification. Notify residents near the proposed Project<br />

site <strong>and</strong> within at least a one mile radius of the Project site of<br />

the construction schedule in writing (in both English <strong>and</strong><br />

Spanish <strong>and</strong> other languages if necessary) via brochures,<br />

mailings, community meetings, <strong>and</strong> a project website.<br />

i) Portable Generators. Avoid the use of portable generators if<br />

electricity can be obtained from the local power grid.<br />

j) Noise Complaints. Assign a construction liaison to respond<br />

to noise complaints. Post contact information at the<br />

construction site, in public notices, <strong>and</strong> on a project website.<br />

k) Pile Driving Hours. Restrict pile driving to the hours<br />

between 9 AM <strong>and</strong> 5 PM, Monday through Friday, <strong>and</strong> from<br />

10 AM to 4 PM on Saturdays.<br />

l) A Construction Noise <strong>Monitoring</strong> <strong>and</strong> Management Plan for<br />

the SCIG facility will be required prior to the commencement.<br />

The plan should evaluate each piece of construction<br />

equipment <strong>and</strong> the need for administrative <strong>and</strong> engineering<br />

noise control for each type of construction equipment. A noise<br />

monitoring plan should be prepared to document construction<br />

noise levels during the process.<br />

SCIG <strong>Final</strong> EIR 2-26