Turnkey Cluster<br />
<strong>PRiMELiNE</strong> CdTe Back-End Cluster (80 MW)<br />
Project duration<br />
Cluster content<br />
13 months<br />
– 2 Buffer Stations<br />
– Bus bar application<br />
– All necessary substrate transport<br />
(14 conveyor SEL, 6 conveyor EX SEL, rotary table)<br />
– Edge sealing (butyl)<br />
– 2 FILO buffer 30 subs<br />
– Back glass washer plus closed loop wastewater treatment<br />
– Back glass loading station<br />
– Back glass inspections<br />
– Corner transfer<br />
– Buffer station incl. 3 storage boxes<br />
– Marriage station + foil loader + slicing<br />
– Lamination loading<br />
(10 corner transfers, 7 conveyor LEL, 2 rotary tables)<br />
– Laminators (including cooling press)<br />
– Lamination unloading (portal crane)<br />
– FILO buffer 50 subs<br />
– Automated lamination quality inspection<br />
– Manual junction box mounting station<br />
– High potential test<br />
– Flash tester<br />
– Labeling<br />
– Unloading station for finished modules<br />
– EHS equipment