Turnkey Cluster<br />

<strong>PRiMELiNE</strong> CdTe Back-End Cluster (80 MW)<br />

Project duration<br />

Cluster content<br />

13 months<br />

– 2 Buffer Stations<br />

– Bus bar application<br />

– All necessary substrate transport<br />

(14 conveyor SEL, 6 conveyor EX SEL, rotary table)<br />

– Edge sealing (butyl)<br />

– 2 FILO buffer 30 subs<br />

– Back glass washer plus closed loop wastewater treatment<br />

– Back glass loading station<br />

– Back glass inspections<br />

– Corner transfer<br />

– Buffer station incl. 3 storage boxes<br />

– Marriage station + foil loader + slicing<br />

– Lamination loading<br />

(10 corner transfers, 7 conveyor LEL, 2 rotary tables)<br />

– Laminators (including cooling press)<br />

– Lamination unloading (portal crane)<br />

– FILO buffer 50 subs<br />

– Automated lamination quality inspection<br />

– Manual junction box mounting station<br />

– High potential test<br />

– Flash tester<br />

– Labeling<br />

– Unloading station for finished modules<br />

– EHS equipment