PRiMELiNE - Roth & Rau AG
PRiMELiNE - Roth & Rau AG
PRiMELiNE - Roth & Rau AG
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>PRiMELiNE</strong><br />
Turnkey Solutions by <strong>Roth</strong> & <strong>Rau</strong><br />
Key features:<br />
Short substrate edge leading<br />
Chemical layer facing upwards<br />
Cycle times < 60 s<br />
Integrated recycling of used rinsing DI water<br />
No chemical additives needed<br />
Integrated dryer<br />
Safety housing<br />
Turnkey Cluster<br />
<strong>PRiMELiNE</strong> CdTe Coating Cluster plus<br />
<strong>PRiMELiNE</strong> CdTe Activation Cluster (80 MW)<br />
Project duration<br />
14 months<br />
Cluster content<br />
Coating Cluster<br />
– CdS/CdTe Coating (CSS)<br />
– Substrate Cooling Section<br />
– Vacuum System<br />
– Closed Loop Water cooling System<br />
– Safety Housings<br />
Activation Cluster<br />
– Conveyor<br />
– Conveyor EX, Conveyor EX SEL, Conveyor EX SEL Inspection,<br />
Conveyor EX LEL, Conveyor LEL, Conveyor SEL,<br />
Conveyor SEL Inspection<br />
– Activation Coating Unit<br />
– Rotary Table EX<br />
– Corner Transfer EX<br />
– Activation Furnace<br />
– Corner Transfer<br />
– Rotary Table<br />
– Cascade Rinsing + Closed Loop DI Water Regeneration<br />
– Safety Housings<br />
– Relevant EHS provisions<br />
– EHS Equipment