of the need to stabilise the embankments on<br />

the soft soil section of Richmond River<br />

floodplain.This project is jointly funded by the<br />

<strong>NSW</strong> and Australian <strong>Government</strong>s.<br />

Brunswick Heads to Yelgun<br />

Construction began in July 2005 on this<br />

$256 million, 8.6 kilometre project. It<br />

involves construction of a new dual<br />

carriageway generally adjacent to the<br />

current highway north of Brunswick<br />

Heads and a second carriageway on the<br />

Brunswick Heads Bypass. The project is<br />

jointly funded by the <strong>NSW</strong> and Australian<br />

<strong>Government</strong>s.<br />

Tugun Bypass<br />

Construction has commenced on the Tugun<br />

Bypass. Early essential construction works<br />

began in April <strong>2006</strong>.The bypass will connect<br />

the Pacific Motorway between Stewart Road<br />

interchange at Currumbin and the Tweed<br />

Heads Bypass north of Kennedy Drive. The<br />

project is being funded by the Australian and<br />

Queensland <strong>Government</strong>s with technical<br />

assistance provided by the <strong>RTA</strong> to facilitate<br />

construction of the project. Planning approval<br />

has been received for the seven kilometre<br />

<strong>NSW</strong> section of the Tugun Bypass.<br />

Other highlights<br />

Preferred routes have been selected for the<br />

following projects and planning continues.<br />

Macksville to Urunga (40 km,<br />

including the Warrell Creek project).<br />

Woodburn to Ballina (32 km).<br />

Iluka Road to Woodburn (35 km,<br />

concept design along existing alignment).<br />

Failford Road to Tritton Road<br />

(3.3 km, concept design along<br />

existing alignment).<br />

Herons Creek to Stills Road (3.3 km,<br />

concept design along existing alignment).<br />

Route options displays have been released<br />

for:<br />

F3 to Raymond Terrace (12.2 km).<br />

Oxley Highway to Kempsey (38.8 km).<br />

Woolgoolga to Wells Crossing (27.8 km).<br />

Wells Crossing to Iluka Road (78 km).<br />

Tintenbar to Ewingsdale (17 km).<br />

Planning is also continuing for:<br />

Bulahdelah Upgrade (9 km).<br />

Karuah to Bulahdelah Sections 2<br />

and 3 (23 km).<br />

Coopernook to Moorland (10 km).<br />

Moorland to Herons Creek (22 km).<br />

Kempsey to Eungai (39 km).<br />

Coffs Harbour Highway Planning<br />

Strategy (12 km).<br />

Sapphire to Woolgoolga (24 km).<br />

Ballina Bypass (Main contract – 12.4 km).<br />

Banora Point (2.5 km).<br />

SYDNEY PROJECTS<br />

Windsor Road upgrade<br />

The program to upgrade Windsor Road<br />

and Old Windsor Road to a minimum of<br />

four lanes is progressing with substantial<br />

construction on:<br />

Roxborough Park Road to Norwest<br />

Boulevarde, Baulkham Hills.<br />

Acres Road to Old Windsor Road,<br />

Kellyville.<br />

Mile End Road, Rouse Hill<br />

to Boundary Road, Box Hill.<br />

Boundary Road, Box Hill to<br />

Level Crossing Road,Vineyard.<br />

These sections are due to open to traffic<br />

progressively from July <strong>2006</strong>, at which time<br />

Windsor and Old Windsor roads will have<br />

been upgraded to four lanes between<br />

Parramatta and McGraths Hill.<br />

The contract for construction of the final<br />

project in the program, the $120 million<br />

Windsor flood evacuation route across<br />

South Creek, was awarded in September<br />

2005 and work is in progress on the major<br />

bridge and approaches.<br />

The Windsor Road upgrade is improving<br />

the accessibility, safety and reliability of travel<br />

in the north-west sector of Sydney. The<br />

upgrade will significantly contribute to<br />

economic development in Western Sydney,<br />

As part of the Windsor Road upgrade program this<br />

section at Baulkham Hills is upgraded to four lanes.<br />

and is the largest urban arterial road project<br />

undertaken by any State government.<br />

Work is well advanced on the grade<br />

separation of Norwest Boulevarde over Old<br />

Windsor Road at Glenwood. The upgraded<br />

intersection is expected to open in late <strong>2006</strong><br />

and will provide improved access for traffic to<br />

the Norwest Business Park and to the M7.<br />

Bangor Bypass<br />

The Bangor Bypass is a four-lane divided<br />

road consisting of two sections – a 2.8<br />

kilometre north-south link between New<br />

Illawarra Road and Alfords Point Road to<br />

the west of and parallel to Old Illawarra<br />

Road and a 3.4 kilometre east-west link<br />

between the Woronora Bridge and the<br />

north-south link.<br />

The east-west link was completed early in<br />

2005 and planning is now in progress for the<br />

north-south link.Work is also progressing on<br />

planning for the duplication of Alfords Point<br />

Bridge over the Georges River.<br />

Hoxton Park Road upgrade<br />

Hoxton Park Road is being progressively<br />

upgraded to provide a divided road at<br />

least four lanes wide and an off-road<br />

cycleway. It carries the Liverpool to<br />

Parramatta Bus T-way on two separate,<br />

central lanes between Banks Road and<br />

Brickmakers Creek.<br />

Planning for the final section between<br />

POSITIVE ECONOMIC OUTCOMES 23