FUTURE CHALLENGES<br />

Maintaining the road network<br />

Continue to provide an<br />

appropriate level of <strong>main</strong>tenance<br />

with reduced AusLink <strong>main</strong>tenance<br />

funding.<br />

Continue to strengthen<br />

older <strong>RTA</strong> bridges.<br />

Continue to work with local<br />

government, internal providers<br />

and industry to improve<br />

productivity in the delivery<br />

of <strong>main</strong>tenance works.<br />

Implement the recommendations<br />

from the Auditor-General’s<br />

performance audit ‘Condition<br />

of Our Roads’ to be released in<br />

<strong>2006</strong>–07, including any necessary<br />

changes to the annual report.<br />

Apply the unique road safety<br />

and incident management<br />

required in the Alpine region.<br />

Promote value engineering<br />

workshops, to solve problems<br />

and reduce <strong>main</strong>tenance costs.<br />

Road development<br />

Complete the Sydney Orbital<br />

road network by completing<br />

construction of the Lane Cove<br />

Tunnel, planning of the M4 eastern<br />

extension and the F3 Freeway<br />

to M2 Motorway link.<br />

Progress the Pacific Highway<br />

upgrade, including Bonville Bypass,<br />

Bundacree Creek to Possum<br />

Brush, Brunswick Heads to<br />

Yelgun and Karuah to Bulahdelah<br />

sections and the acceleration<br />

of the Moorland to Herons<br />

Creek upgrade.<br />

Progress the Princes Highway<br />

upgrade, including the Oak Flats<br />

to Dunmore dual carriageway<br />

and the Wollongong Northern<br />

Distributor Extension.<br />

Progress the Great Western Highway<br />

upgrades in the Blue Mountains.<br />

Complete the Windsor Road upgrade.<br />

Continue the construction of the<br />

North-West T-way.<br />

Complete the extension of<br />

Narellan Road from Camden Valley<br />

Way to The Northern Road.<br />

Commence the widening of<br />

the F3 Freeway to six lanes<br />

between Mt Colah and Cowan.<br />

Implement the Central Coast<br />

Transport Action Plan.<br />

Duplicate the Alfords Point Bridge.<br />

Continue planning and commence<br />

construction of the new Hume<br />

Highway accelerated duplication<br />

program.<br />

Complete the road changes associated<br />

with the Cross City Tunnel.<br />

Continue to implement urban design<br />

corridor strategies to ensure a whole<br />

of government approach to land use<br />

and transport planning.<br />

Complete planning for a sustainable<br />

road network within Sydney<br />

(including strategic bus corridors,<br />

T-ways and other bus facilities)<br />

for integration with north-west<br />

and south-west sector structure<br />

planning.<br />

Participate with other <strong>NSW</strong><br />

<strong>Government</strong> agencies in the<br />

implementation of the<br />

Metropolitan Strategy.<br />

Managing traffic<br />

Maintain consistent travel times<br />

through network operations and<br />

provide effective management<br />

of incidents and special events.<br />

Implement Intelligent Transport<br />

Systems, using electronic tolling<br />

and other innovative equipment<br />

to improve traffic flow and<br />

traveller information.<br />

Improve the efficiency of traffic<br />

facilities <strong>main</strong>tenance in particular<br />

replacement of high-consumption<br />

incandescent traffic signal lamps<br />

with more energy-efficient LED<br />

lanterns.<br />

Ensure that <strong>NSW</strong> road users<br />

are provided with information<br />

about changes to road rules<br />

and traffic facilities.<br />

Implement new network<br />

developments that integrate<br />

into the road transport system.<br />

Use technology to provide more<br />

efficient communication links to<br />

the SCATS network.<br />

Freight<br />

Continue implementation of<br />

the Intelligent Access Program<br />

to facilitate network utilisation.<br />

Implement an expanded Higher<br />

Mass Limit network in <strong>NSW</strong>.<br />

Establish a framework for the<br />

introduction to <strong>NSW</strong> of higher<br />

productivity vehicles, in line with<br />

the Council of Australian<br />

<strong>Government</strong>s (COAG)<br />

commitment.<br />

Plan and manage increased<br />

heavy vehicle movements as<br />

a result of the planned expansion<br />

of Port Kembla.<br />

30 POSITIVE ECONOMIC OUTCOMES