A. TITLE PAGE<br />

Name of Respondent’s Agency/Firm: <strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>.<br />

Name of Contact Person:<br />

Kenneth L. Caban, PE<br />

Address: 150 West Flagler Street, Suite 1625<br />

Miami, FL 33130<br />

Telephone Number: 786-507-3898<br />

Subject:<br />

Submission Date: June 22, 2012<br />

RFQ No. 2012-10 Continuing Contract for Professional Services<br />

Page 1


B. TABLE OF CONTENTS<br />

A. Title Page 1<br />

B. Table of Contents 2<br />

C. Cover Letter and Executive Summary 3<br />

D. Form SF 330<br />

D.1 SF330 Part I<br />

1. Part I – A-D Contract Specific Qualifications 10<br />

2. Part I – E Resumes 12<br />

3. Part I – F Project Experience 33<br />

4. Part I – G Key Personnel Matrix 44<br />

5. Part I –H Additional Information 45<br />

6. Part I – I Signature Page 45<br />

D.1 SF330 Part II<br />

7. Part II – General Qualifications 68<br />

D.2 Statement and Licenses 69<br />

D.3 Supplemental Material 73<br />

E. Acknowledgements<br />

E.1 Addenda and Forms 81<br />

1. Addenda 82<br />

2. Forms (all forms from section 6)<br />

6.1 Acknowledgement Form 92<br />

6.2 Statement of NO BID/RFQ 94<br />

6.3 Reference Questionnaire 95<br />

6.4 RFQ Signature Page for Corporation 102<br />

6.5 RFQ Signature Page for Sole Proprietor of Partnership 103<br />

6.6 Drug-Free Workplace Program 104<br />

6.7 Solicitation, Giving, and Acceptance of Gifts Policy 105<br />

6.8 Vendor Registration, Certification, and Licenses 106<br />

6.9 Non-Collusion Affidavit 107<br />

6.10 Source of Information 108<br />

7.3 Respondent Certification 109<br />

7.4 Sworn Statement on Public Entity Crimes 110<br />

E.2 Subcontractor Plan/Good Faith Effort 112<br />

Exceptions to Proposal 113<br />

Page 2


Page 3


Authorized Title Address Telephone Email Address<br />

Representative<br />

Number<br />

Jon Fox, PE Vice President, 201 E. Pine St. 407.480.3915 Jon.Fox@<strong>Tetra</strong>tech.com<br />

Florida Operations Suite 1000,<br />

Manager<br />

Orlando, Florida<br />

32801<br />

James E. Christopher, Vice President 201 E. Pine St. 407.480.3904 James.Christopher@<strong>Tetra</strong>te<br />

PE, BCEE Suite 1000, ch.com<br />

Orlando, Florida<br />

32801<br />

Kenneth L. Caban, Southeast Florida 150 W. Flagler St. 786.507.3898 Ken.Caban@<strong>Tetra</strong>tech.com<br />

PE, BCEE, LEED®Ap Regional Manager Suite 1625, Miami,<br />

Florida 33130<br />

Lastly, as required by the RFQ, I have signed this letter as a person in our firm who is authorized to negotiate<br />

terms, render binding decisions and commit the firm’s resources.<br />

We submit this statement of qualifications for the City’s consideration to select <strong>Tetra</strong> <strong>Tech</strong> as one of your<br />

continuing consultants. Our entire team is committed to serving as an extension of the City’s staff and we<br />

look forward to continuing our long-standing relationship with the City. Thank you in advance for your review<br />

and consideration of our submittal.<br />

Sincerely,<br />

<strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>.<br />

4 ~<br />

Fox, PE<br />

Vice President/Operations Manager<br />

Cover Letter<br />

Page 4


Executive Summary<br />

INTRODUCTION AND BACKGROUND<br />

The City of North Miami Beach is located in northeastern Miami-Dade County and has approximately 42,000 city<br />

residents. The Public Utilities Division provides service to more than 180,000 water customers and is dedicated<br />

to managing its natural resources, protecting and preserving the environment for future generations, and<br />

providing reliable high quality water and related services to its customers. Public Works ensures that essential<br />

services are provided to its residents.<br />

In an effort to continue to provide services and various infrastructure, the City of North Miami Beach intends to<br />

retain firms, pursuant to continuing contracts, to be available to perform services, which may include engineering,<br />

architecture, electrical engineering, right-of-way and traffic engineering, construction engineering, civil<br />

engineering, environmental permitting and engineering, preparation of plans and specifications, construction<br />

management, planning, design and/or construction supervision and administration, etc., for one or any of the<br />

projects identified in the RFQ.<br />

The City has requested Form SF330, various licenses, permits, certifications, forms, and client questionnaires.<br />

As such, this Executive Summary follows the general order of information provided in our submittal.<br />

KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

The key personnel <strong>Tetra</strong> <strong>Tech</strong> is proposing for this<br />

contract has a detailed and unique understanding of<br />

the work to be performed. Key staff has been involved<br />

in the design and construction of many City utilities<br />

infrastructure and facilities, including the Norwood-<br />

Oeffler Water Treatment Plant. As the designer of this<br />

plant upgrade, as well as portions of its pumping,<br />

storage, and transmission systems, the knowledge our<br />

key personnel have of these complex systems is<br />

unparalleled. Key personnel are identified in the<br />

following paragraphs.<br />

Project Manager<br />

<strong>Tetra</strong> <strong>Tech</strong>’s point of contact will be Kenneth Caban, P.E., BCEE, LEED® AP, our Southeast Florida Regional<br />

Manager and Project Manager for this contract. His contact information is provided in the table at the end of the<br />

cover letter.<br />

Mr. Caban will be responsible for client service and successful project delivery, as he has on many previous<br />

projects. He has more than 15 years of experience in multiple disciplines of civil engineering. As a former<br />

employee of the City of North Miami Beach, he has a great understanding of the various City water, wastewater,<br />

and other utility infrastructure. In addition, he has extensive experience with every phase of various engineering<br />

Page 5


Executive Summary<br />

projects including the following:<br />

• Project Development<br />

• Master Planning<br />

• Preliminary Design<br />

• Detailed Design and Construction<br />

Documents Preparation<br />

Other Key Personnel<br />

Mr. Caban will lead our team of esteemed professionals,<br />

most of which have worked on numerous City of North Miami<br />

Beach utilities infrastructure and facilities. Our key team<br />

members are identified below and their detailed resumes are<br />

provided Part II of SF330.<br />

• Gary Revoir<br />

• James Christopher<br />

• Jon Fox<br />

• Jill Hudkins<br />

• Jarrett Kinslow<br />

• Charles Drake<br />

• Bill Musser<br />

• Cost Estimating<br />

• Construction Engineering, Administration,<br />

and Inspection<br />

• Operation and Maintenance<br />

EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS<br />

CONTRACT<br />

Example Projects<br />

Our professionals have served the South Florida community and North Miami Beach for many years on a wide<br />

range of engineering projects, including those identified within the RFQ. Our ability to provide local service is<br />

highlighted by our local offices. We have provided services from project inception and planning to design,<br />

permitting and construction management for the City of North Miami Beach and numerous other municipalities.<br />

The ten projects included in the SF330 are listed below. Project descriptions are provided in the SF330.<br />

1) Continuing Engineering Services, North Miami Beach, Florida<br />

2) Continuing Engineering Services, Hollywood, Florida<br />

3) Continuing Engineering Consulting Services, Key Biscayne, Florida<br />

4) Continuing Engineering Services, Alexander Orr Water Treatment Plant and South Miami-Dade Water<br />

Supply Systems, Miami, Florida<br />

Page 6


Executive Summary<br />

5) Continuing Water and Wastewater Consultant, Naples, Florida<br />

6) Continuing Consultant, Deltona, Florida<br />

7) Continuing Miscellaneous Engineering Consultant, Cape Coral, Florida<br />

8) Continuing Engineering Services, James E. Anderson 22.5 MGD Reverse Osmosis Water Treatment Plant,<br />

Port St. Lucie, Florida<br />

9) Toho Water Authority Pump Station Nos. 60 and 97 Improvements, Kissimmee, Florida<br />

10) Continuing Engineering Services, City of Miami Beach Normandy Isles Streetscape and Infrastructure<br />

Improvements, Miami Beach, Florida<br />

Key Personnel Participation in Example Projects<br />

Part G of Form SF330 provides a matrix depicting the participation of<br />

our key personnel in the example projects. As can be seen from the<br />

matrix, many of our staff has worked as a team on numerous<br />

occasions. This consistent teamwork has resulted in the successful<br />

completion of many projects, including projects for the City of North<br />

Miami Beach.<br />

Additional Information<br />

To further demonstrate our experience in the water, wastewater,<br />

hydrogeology, and civil disciplines, additional project descriptions have<br />

been provided. Projects for each of the following disciplines are listed<br />

below and can be found in Part H of Form SF330.<br />

Water<br />

• City of North Miami Beach, Norwood-Oeffler Water Treatment Plant Expansion<br />

• City of Hollywood, Water Main Replacement Program<br />

• Miami-Dade Water and Sewer Department, Alexander Orr Water Treatment Plant Task Authorization<br />

No. 11 – Process Optimization Study<br />

• City of Bartow, Water System Master Planning, Mapping, and Modeling<br />

Wastewater<br />

• City of Hollywood, Wastewater Pump Stations Conversions<br />

• Toho Water Authority, Pump Station Nos. 60 and 97 Improvements<br />

• City of Cape Coral, Lift Stations 104, 306, and 420 Improvements<br />

• Kissimmee, Westside Reclaimed Water and Wastewater Transmission Mains<br />

Page 7


Executive Summary<br />

Hydrogeology<br />

• City of North Miami Beach Disposal Test/Injection Well and Monitoring Wells<br />

• City of Naples, Communication Tower Design & Permitting<br />

• City of Deltona, Continuing Consultant<br />

• City of Lakeland, Northwest Wellfield Wetlands Monitoring<br />

Civil<br />

• Village of Key Biscayne Stormwater Master Plan Update<br />

• City of Miami Beach Normandy Isles Streetscape and Infrastructure Improvements<br />

• City of Naples Stormwater Master Plan Update<br />

• Village of Key Biscayne Drainage Improvements for Buttonwood Drive, Glenridge Road, and<br />

Woodcrest Road<br />

• City of Cape Coral, Continuing Miscellaneous Engineering Consultant<br />

ARCHITECT - ENGINEER QUALIFICATIONS<br />

<strong>Tetra</strong> <strong>Tech</strong> is a publicly-traded corporation with revenues in excess of $2.6<br />

billion (FY 2011) and more than 13,000 employees worldwide. We are a full<br />

service engineering consulting firm established in 1966, with a strong Florida<br />

presence, with multiple offices in addition to our Miami office. Our firm is<br />

committed to quality service and cost-effective solutions for our clients. <strong>Tetra</strong><br />

<strong>Tech</strong> is one of the largest engineering firms in the nation, and is currently<br />

ranked No. 1 in water supply, water treatment, and environmental<br />

management, and No. 7 in design firms by Engineering News-Record. Local<br />

office philosophy allows our clients to benefit from the best of both worlds; local, personalized service with<br />

nationally recognized resources. Our proposed team of professionals is extremely qualified to deliver the City’s<br />

proposed projects.<br />

LICENSES, PERMITS, AND CERTIFICATIONS<br />

<strong>Tetra</strong> <strong>Tech</strong> is licensed and permitted to perform the necessary work. Our team is positioned to dedicate<br />

resources to the City to immediately implement City projects. We have more than 400 professionals located<br />

throughout Florida. We are ready to deliver any size project to meet the City's needs. Copies of relevant licenses<br />

are provided in this submittal.<br />

SUPPLEMENTAL INFORMATION ON TETRA TECH’S CAPABILITIES AND EXPERIENCE<br />

<strong>Tetra</strong> <strong>Tech</strong>’s Quality Program is based on a corporate philosophy of clearly understanding client goals and<br />

expectations and providing deliverables and services that fully meet these goals and expectations in a costeffective<br />

manner. <strong>Tetra</strong> <strong>Tech</strong>’s Quality Program consists of:<br />

Page 8


Executive Summary<br />

• Quality Assurance (QA),<br />

• Quality Control (QC), and<br />

• Quality Improvement (QI).<br />

Part D.3 – Supplemental Material, details our Quality Assurance and Quality Control Program.<br />

ACKNOWLEDGEMENTS<br />

Addenda and Forms<br />

The various signed addenda and forms are provided, as required. These forms include the acknowledgement<br />

form, a signature page for the corporation, Drug-free workplace program form, and others.<br />

Reference Questionnaires<br />

We have provided seven (7) governmental agency references, all<br />

indicating excellent performance, and exceeding the number required by<br />

the RFQ. Reference forms indicating excellent performance are provided<br />

from the following governmental agencies:<br />

• City of Hollywood<br />

• Village of Key Biscayne<br />

• Miami-Dade Aviation Department<br />

• Miami-Dade Water and Sewer Department<br />

• Toho Water Authority (2 projects)<br />

• Utilities Commission of New Smyrna Beach<br />

SBE/MBE Involvement<br />

<strong>Tetra</strong> <strong>Tech</strong> is committed to supporting SBE and M/WBE programs. At this<br />

time, we have not identified any subconsultants, however we intend on<br />

making a good faith effort to include SBE or MBE companies in this<br />

contract.<br />

Page 9


Part I – Contract-Specific Qualifications<br />

A. CONTRACT INFORMATION<br />

1. Title and Location (City and State)<br />

Continuing Contract for Professional Services, North Miami Beach, Florida<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

2. Public Notice Date 3. Solicitation or Project Number<br />

June 22, 2012 2012-10<br />

B. ARCHITECT-ENGINEER POINT OF CONTACT<br />

4. Name and Title<br />

Kenneth L. Caban, PE, BCEE, Southeast Florida Regional Manager<br />

5. Name of Firm<br />

<strong>Tetra</strong> <strong>Tech</strong><br />

6. Telephone Number 7. Fax Number 8. E-Mail Address<br />

786.507.3898 786.439.0400. ken.caban@tetratech.com<br />

C. PROPOSED TEAM<br />

(Complete this section for the prime contractor and all key subcontractors)<br />

(Check)<br />

Prime<br />

Teaming<br />

Partner<br />

Subcontractor<br />

9. Firm Name 10. Address 11. Role in This Contract<br />

a. <br />

<strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>.<br />

Check if Branch Office<br />

150 West Flager Street<br />

Suite 1625<br />

Miami, FL 33130<br />

Project Management, QA/QC, Project Engineering<br />

(Water, Wastewater, Civil), Hydrogeology,<br />

Survey/GIS, Electrical Instrumentation,<br />

Finance/Capital Planning<br />

b. Check if Branch Office<br />

c. Check if Branch Office<br />

d.<br />

Check if Branch Office<br />

e.<br />

Check if Branch Office<br />

f.<br />

Check if Branch Office<br />

D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Provided as attachment after Section C)<br />

ABCD-1<br />

Form SF330 Part I<br />

Page 10


PART I - A-D CONTRACT SPECIFIC QUALIFICATIONS<br />

ORGANIZATIONAL CHART<br />

City of North Miami Beach<br />

Project Manager<br />

Kenneth L. Caban, PE, LEED AP<br />

QA/QC<br />

Gary J. Revoir, PE<br />

Water Wastewater<br />

Hydrogeology Civil<br />

James E. Christopher, PE,<br />

Jarrett K. Kinslow, PE<br />

Jill M. Hudkins, PE<br />

Jon Fox, PE<br />

John P. Toomey, PE<br />

Matthew A. Doan, PE<br />

Charles W. Drake, PG<br />

Miguel A. Garcia, PG<br />

W. Bruce Lafrenz, PG<br />

William D. Musser, PE, LEED AP<br />

Roderick K. Cashe, PE, LEED AP<br />

James R. Warner, PE<br />

Survey / GIS Electrical / Instrumentation Finance / Capital Planning<br />

Lawrence E. Jenkins, PSM<br />

Betty A. Morris<br />

Felix W. Yao, PE<br />

William A. Paison, PE, LEED AP<br />

Andrew T. Woodcock, PE, MBA<br />

Jennifer L. Woodall, PE, MBA<br />

Page 11


E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

Kenneth L. Caban, P.E., LEED AP<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Miami, FL<br />

Project Manager<br />

a. Total<br />

15<br />

b. With Current Firm<br />

2<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

M.S., Environmental Engineering, Florida International<br />

University, 2007<br />

Professional Engineer, Florida, No. 59276<br />

B.S., Civil Engineering, Florida International University,<br />

1997<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

Honors/Awards; Board Certified Environmental Engineer (BCEE); American Academy of Environmental Engineers; National Environmental<br />

Engineering Honorary; Florida International University Alumnus, February 2008.<br />

19. Relevant Projects<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, North Miami Beach, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Project Manager – Water Treatment Plant Operation and Maintenance Manual – Actively managing the preparation of a Operation and<br />

Maintenance Manual for the Norwood-Oeffler Water Treatment Plant (WTP), which includes approximately 15.0 million gallons per day (MGD)<br />

of lime softening water treatment facilities, 9.0 MGD of nanofiltration, 6.0 MGD from new low pressure reverse osmosis facilities, 2.0 MGD of<br />

micron filtered raw water blend, and other facilities.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, Hollywood, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Project Manager and engineer of record for the design of approximately 25,000 linear feet of PVC water mains to replace existing aged water<br />

mains. The project includes surveying, geotechnical, preparation of design and construction documents, permitting, bidding review and<br />

assistance, construction administration and inspection, and project closeout and certification.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, Key Biscayne, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Project Manager for continuing services providing professional engineering services to the Village of Key Biscayne for numerous years.<br />

Professional services provided include master planning, preliminary design, preparation of final design and construction documents, permitting,<br />

bidding, and engineering services during construction, including construction inspection and administration. Projects delivered include multiple<br />

disciplines of engineering including water resources, environmental permitting, transportation and others. Some recently completed key projects<br />

include the Stormwater Master Plan Update and various drainage improvements.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Professional Services Construction (if applicable)<br />

On-going<br />

Continuing Engineering Services, Alexander Orr Water Treatment Plant and South Miami-<br />

Dade Water Supply Systems, Miami, Florida<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Project Manager for the Alexander Orr, Jr. Water Treatment Plant Continuing Services. This project provides engineering services to evaluate<br />

and rehabilitate or replace process equipment. Other key projects include the lime kiln mechanical and electrical upgrades study, a process<br />

optimization study and a secondary settlement basin bypass study.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Professional Services Construction (if applicable)<br />

2007-Current<br />

Continuing Engineering Services, City of Miami Beach Normandy Isles Streetscape and<br />

Infrastructure Improvements, Miami Beach, Florida<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for this major neighborhood improvement project. This project included coordinated designs, permitting, and construction<br />

services for sidewalk replacement, street-end design, textured pavement improvements, roadway resurfacing, landscaping, irrigation, water<br />

main replacement, rear easement water service relocation, and lighting enhancements.<br />

SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />

Page 12


E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

James E. Christopher, P.E<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />

Project Engineer (Water)<br />

a. Total<br />

30<br />

b. With Current Firm<br />

20<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

B.S., Chemistry, Duke University, 1976<br />

M.S., Environmental Engineering and Science, Professional Engineer, Florida, No. 34204<br />

University of Central Florida, 1980<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

Professional Affiliations: American Water Works Association. Florida Pollution Control Association, Water Environment <strong>Tech</strong>nology, Florida<br />

Engineering Society, Southeast Desalting Association, American Membrane <strong>Tech</strong>nology Association, Water Reuse Association.<br />

19. Relevant Projects<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

f.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, North Miami Beach, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for continuing services for a variety of design, permitting, and construction services tasks for integrating a 9 MGD membrane<br />

softening facility and a 6 MGD low pressure reverse osmosis facility with an existing 15 MGD lime softening water treatment plant for a total<br />

expanded capacity of 32.0 MGD, along with other potable water supply facilities.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, Alexander Orr Water Treatment Plant and South Miami-<br />

Dade Water Supply Systems, Miami, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for the Alexander Orr, Jr. Water Treatment Plant Continuing Services. This project provides engineering services to<br />

evaluate and rehabilitate or replace process equipment. Other key projects include the lime kiln mechanical and electrical upgrades study, a<br />

process optimization study and a secondary settlement basin bypass study.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Water and Wastewater Consultant, Naples, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Services provided to the City have included, Permitting, Water and wastewater system evaluations, Miscellaneous water<br />

main and wastewater collection system extensions, water and wastewater system operations, Master planning, Hydrogeological and water<br />

resources, and Financial management as it relates to the water and wastewater facilities.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Consultant, Deltona, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member as part of the Continuing Consultant contract for the City of Deltona. Services have included support to several departments<br />

including Public Works, Public Utilities, Development Services, Parks and Recreation and the Building and Fire Department.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Miscellaneous Engineering, Cape Coral, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Projects included lift station refurbishment design, water and wastewater treatment plant modifications, utility infrastructure<br />

improvements and other miscellaneous engineering services as needed.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, James E. Anderson 22.5 MGD Reverse Osmosis Water<br />

Treatment Plant, Port St. Lucie, Florida<br />

Professional Services<br />

2008<br />

Construction (if applicable)<br />

2008<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Project included the construction of 7 Floridan aquifer supply wells, one blend well and the addition of seven 2.0 MGD<br />

reverse osmosis skids, addition of feed and blend micron filters, expansion of the chemical feed system and expansion of the degasification and<br />

odor control facilities to increase the capacity in three construction milestones from 6.0 to 22.0 MGD.<br />

SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />

Page 13


E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

Jarrett K. Kinslow, P.E.<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />

Project Engineer (Water)<br />

a. Total<br />

10<br />

b. With Current Firm<br />

10<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

B.S., Environmental Engineering, University of Central Professional Engineer, Florida, No. 63900<br />

Florida, 2000<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

Professional Affiliations: Southeast Desalting Association; American Membrane <strong>Tech</strong>nology Association; American Water Works Association;<br />

Water Environment Federation.<br />

19. Relevant Projects<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, North Miami Beach, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for continuing services for a variety of design, permitting, and construction services tasks for integrating a 9 MGD membrane<br />

softening facility and a 6 MGD low pressure reverse osmosis facility with an existing 15 MGD lime softening water treatment plant for a total<br />

expanded capacity of 32.0 MGD, along with other potable water supply facilities.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, Alexander Orr Water Treatment Plant and South Miami-<br />

Dade Water Supply Systems, Miami, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for the Alexander Orr, Jr. Water Treatment Plant Continuing Services. This project provides engineering services to<br />

evaluate and rehabilitate or replace process equipment. Other key projects include the lime kiln mechanical and electrical upgrades study, a<br />

process optimization study and a secondary settlement basin bypass study.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Water and Wastewater Consultant, Naples, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Water and Wastewater Engineering Consulting, as well as continuing financial management services have been provided to<br />

the City of Naples since the 1990s. Projects have included upgrades to the Solana Road Booster Station, SCADD Plant Network emergency<br />

upgrades, SCADA and security upgrades, and potable water system communication improvements.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, James E. Anderson 22.5 MGD Reverse Osmosis Water<br />

Treatment Plant, Port St. Lucie, Florida<br />

Professional Services<br />

2008<br />

Construction (if applicable)<br />

2008<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member in the expansion of an existing 6 MGD reverse osmosis water treatment facility to a build-out capacity of 22.5 MGD. Work<br />

completed on project to date includes the fast track design of the expanded facilities including the raw water supply, membrane treatment, post<br />

treatment, finished water, and auxiliary power facilities. The project was designed to be constructed in 3 phases of increasing capacity to meet<br />

increasing water demands from high rates of population growth.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

South Regional WTP, City of Palm Bay, Florida<br />

Professional Services Construction (if applicable)<br />

On-going<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Served as a Project Engineer in the final design and the startup and testing of a reverse osmosis water treatment facility with an initial capacity<br />

of 4 MGD and an expandable capacity of 10 MGD. Areas of responsibility for design included the post treatment degasification and odor control<br />

processes as well as the chlorine contact basin and post treatment chemical injection, and transfer pumping systems. Design comprised of<br />

associated mechanical drawings and project specifications. Other tasks include coordination of the process design with electrical,<br />

instrumentation, and structural sub-consultants and assistance in the general QC review of the membrane process facilities. Startup and testing<br />

role included functional demonstration testing of the instrumentation & control system and water treatment processes.<br />

SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />

Page 14


E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

Jill M. Hudkins, P.E<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />

Project Engineer (Water)<br />

a. Total<br />

19<br />

b. With Current Firm<br />

14<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

B.S., Civil Engineering, Duke University, 1993<br />

M. Eng., Civil Engineering, Massachusetts Institute of Professional Engineer, Florida, No. 52701<br />

<strong>Tech</strong>nology, 1997<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

Professional Affiliations: American Water Works Association; Water Environment Federation; Southeast Desalting Association, Past President<br />

American Membrane <strong>Tech</strong>nology Association; Florida Water; Environment Association. Certified Training Programs: FWPCOA Region 10:<br />

Annual Regional Short School, Membrane Treatment and Operations, Polk County, Florida; March 1999 and 2000; City of North Miami Beach:<br />

Membrane Training Program, Certified by the FWPCOA, April and May 2001.<br />

19. Relevant Projects<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, North Miami Beach, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for continuing services for a variety of design, permitting, and construction services tasks for integrating a 9 MGD membrane<br />

softening facility and a 6 MGD low pressure reverse osmosis facility with an existing 15 MGD lime softening water treatment plant for a total<br />

expanded capacity of 32.0 MGD, along with other potable water supply facilities.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Water and Wastewater Consultant, Naples, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member as part of the Continuing Water and Wastewater Engineering Consulting Services for the City of Naples. Services provided<br />

to the City have included, Permitting, Water and wastewater system evaluations, Miscellaneous water main and wastewater collection system<br />

extensions, water and wastewater system operations, Master planning, Hydrogeological and water resources, and Financial management as it<br />

relates to the water and wastewater facilities.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Consultant, Deltona, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member as part of the Continuing Consultant contract for the City of Deltona. Services have included support to several departments<br />

including Public Works, Public Utilities, Development Services, Parks and Recreation and the Building and Fire Department.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Miscellaneous Engineering, Cape Coral, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member providing continuing miscellaneous professional engineering services to the City of Cape Coral. Projects have included lift<br />

tation refurbishment design, water and wastewater treatment plant modifications, utility infrastructure improvements and other miscellaneous<br />

engineering services as needed<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, James E. Anderson 22.5 MGD Reverse Osmosis Water<br />

Treatment Plant, Port St. Lucie, Florida<br />

Professional Services<br />

2008<br />

Construction (if applicable)<br />

2008<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member responsible for project management and design and construction services for the expansion of the James E. Anderson<br />

(JEA) ROWTP from 6 MGD to 22.5 MGD.<br />

SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />

Page 15


E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

Jon Fox, P.E.<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />

Project Engineer (Wastewater)<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

B.S., University of Central Florida, 1990 Professional Engineer, Florida, No. 49487<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

Professional Affiliations: American Society of Civil Engineers, American Water Works Association, Water Environment Federation.<br />

19. Relevant Projects<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

f.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, North Miami Beach, Florida<br />

SOLICITATION NO. 2012-10 E-1 Page 16 SF330 Part I<br />

a. Total<br />

19<br />

Professional Services<br />

On-going<br />

b. With Current Firm<br />

19<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for continuing services for a variety of design, permitting, and construction services tasks for integrating a 9 MGD membrane<br />

softening facility and a 6 MGD low pressure reverse osmosis facility with an existing 15 MGD lime softening water treatment plant for a total<br />

expanded capacity of 32.0 MGD, along with other potable water supply facilities.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, Hollywood, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member providing professional engineering services to the City of Hollywood for numerous years. Professional services provided<br />

include preliminary design, preparation of final design and construction documents, permitting, bidding, and engineering services during<br />

construction, including construction inspection and administration. Projects delivered include multiple disciplines of engineering including water<br />

and wastewater engineering. Services include surveying, geotechnical engineering, design and preparation of contract documents, permitting,<br />

bidding, and construction phase services.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, Key Biscayne, Florida<br />

Professional Services Construction (if applicable)<br />

On-going<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member - Professional services provided include master planning, preliminary design, preparation of final design and construction,<br />

documents, permitting, bidding, and engineering services during construction, including construction inspection and administration. Projects<br />

delivered include multiple disciplines of engineering including water resources, environmental permitting, transportation and others.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Professional Services Construction (if applicable)<br />

On-going<br />

Continuing Engineering Services, Alexander Orr Water Treatment Plant and South Miami-<br />

Dade Water Supply Systems, Miami, Florida<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for the Alexander Orr, Jr. Water Treatment Plant Continuing Services. This project provides engineering services to<br />

evaluate and rehabilitate or replace process equipment. Other key projects include the lime kiln mechanical and electrical upgrades study, a<br />

process optimization study and a secondary settlement basin bypass study.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Water and Wastewater Consultant, Naples, Florida<br />

Professional Services Construction (if applicable)<br />

On-going<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member - Performing a variety of day-to-day tasks ranging associated with the City’s water, wastewater and reclaimed water systems<br />

including but not limited to: wellfield design for raw water supply, assistance with permitting (Collier County, FDEP, SFWMD), booster pump<br />

station improvements and improved storage, security improvements, hydraulic modeling, reclaimed water system improvements, and assisted<br />

with stormwater issues.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Consultant Deltona, Florida<br />

Professional Services Construction (if applicable)<br />

On-going<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member – <strong>Tetra</strong> <strong>Tech</strong> has served as a Continuing Consultant for the City of Deltona since April of 2002. Our services have included<br />

support to several departments including Public Works, Public Water and Wastewater, Utilities, Development Services, Parks and Recreation<br />

and the Building and Fire Department. Our public works services included: CIP planning and budgeting; stormwater utility study and rate<br />

adjustment; Stormwater Retrofit Projects; flood plain modeling and mapping; grant support; stormwater master plan update; survey/mapping of


g.<br />

h.<br />

i.<br />

j.<br />

various infrastructure; CEI services; and emergency management support during flooding.<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Miscellaneous Engineering, Cape Coral, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for multiple water, wastewater and reclaimed water projects including plant upgrades, construction of new buildings, lift<br />

station upgrades, construction of new lift stations, construction of new water, wastewater and reclaimed water piping, security improvements,<br />

lighting improvements, booster station improvements, generator improvements and related miscellaneous tasks.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, James E. Anderson 22.5 MGD Reverse Osmosis Water<br />

Treatment Plant, Port St. Lucie, Florida<br />

Professional Services<br />

2008<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member - The project included the construction of 7 Floridan aquifer supply wells, one blend well and the addition of seven 2.0 MGD<br />

reverse osmosis skids, addition of feed and blend micron filters, expansion of the chemical feed system and expansion of the degasification and<br />

odor control facilities to increase the capacity in three construction milestones from 6.0 to 22.0 MGD.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Toho Water Authority Pump Station No. 60 and 97 improvements, Kissimmee, Florida<br />

Professional Services<br />

2010<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member - Providing professional engineering services to the Toho Water Authority. Projects have included numerous lift station<br />

upgrades and refurbishments, pipelines and other engineering services.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, City of Miami Beach Normandy Isles Streetscape and<br />

Infrastructure Improvements, Miami Beach, Florida<br />

Professional Services<br />

2007-Current<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member - Professional services include coordinating designs and permitting efforts, sidewalk replacement, street-end, textured<br />

pavement improvements, roadway resurfacing, landscaping, irrigation, water main replacement, rear easement water service relocation, and<br />

lighting enhancements.<br />

SOLICITATION NO. 2012-10 E-1 Page 17 SF330 Part I


SOLICITATION NO. 2012-10 E-1<br />

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

John P. Toomey, P.E.<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />

Project Engineer (Wastewater)<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

BSE, University of Central Florida, Environmental<br />

Engineering, Magna cum Laude<br />

Professional Engineer, Florida, No. 40264<br />

AET, Vermont <strong>Tech</strong>nical College, High Honors<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

Professional Affiliations: American Society of Civil Engineers, Metro Orlando Economic Development Commission of Mid-Florida.<br />

19. Relevant Projects<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

f.<br />

g.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, North Miami Beach, Florida<br />

a. Total<br />

31<br />

Professional Services<br />

On-going<br />

b. With Current Firm<br />

11<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for continuing services for a variety of design, permitting, and construction services tasks for integrating a 9 MGD membrane<br />

softening facility and a 6 MGD low pressure reverse osmosis facility with an existing 15 MGD lime softening water treatment plant for a total<br />

expanded capacity of 32.0 MGD, along with other potable water supply facilities.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, Hollywood, Florida<br />

Professional Services<br />

On-going<br />

Construction<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Engineering services including preliminary design, preparation of final design and construction documents, permitting, and<br />

bidding during construction, including inspection and administration. Deliverables include multiple disciplines: water and wastewater<br />

engineering, surveying, geotechnical, design and preparation of contract documents, permitting, bidding, and construction phase services.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Water and Wastewater Consultant, Naples, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Water/Wastewater engineering consulting, as well as continuing financial management services n provided to the City since the 1990s. Projects<br />

include upgrades to the Solana Road Booster Station, SCADA Plant Network emergency upgrades, SCADA and security upgrades, and potable<br />

water system communication improvements.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Consultant, Deltona, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Services included support to several departments including Public Works, Public Utilities, Development Services, Parks and<br />

Recreation and the Building and Fire Department.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Miscellaneous Engineering, Cape Coral, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Projects included lift station refurbishment design, water and wastewater treatment plant modifications, utility infrastructure<br />

improvements, and miscellaneous engineering services.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, James E. Anderson 22.5 MGD Reverse Osmosis Water<br />

Treatment Plant, Port St. Lucie, Florida<br />

Professional Services<br />

2008<br />

Construction (if applicable)<br />

2008<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Construction of 7 aquifer supply wells, one blend well, and 7 additional 2.0-MGD RO skids, feed and blend micron filters,<br />

expansion of the chemical feed system and of the degasification/odor control facilities to increase capacity from 6.0 to 22.0 MGD.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Toho Water Authority Pump Station No. 60 and 97 improvements, Kissimmee, Florida<br />

Professional Services<br />

2010<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Providing continuing misc. professional engineering services. Projects included lift station upgrades and refurbishments and pipelines.<br />

Page 18


E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

Matthew A. Doan, P.E.<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />

Project Engineer (Wastewater)<br />

a. Total<br />

11<br />

b. With Current Firm<br />

7<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

B.S., Environmental Engineering, University of Central<br />

Florida, 1999 – Magna cum Laude<br />

Professional Engineer, Florida, No. 63963<br />

M.S., Environmental Engineering, University of Central<br />

Florida, 2006<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

Professional Affiliations: American Water Works Association – FSAWWA Region Vice Chair; Florida Water Environment Association/Water<br />

Environment Federation.<br />

19. Relevant Projects<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

f.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, North Miami Beach, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for continuing services for a variety of design, permitting, and construction services tasks for integrating a 9 MGD membrane<br />

softening facility and a 6 MGD low pressure reverse osmosis facility with an existing 15 MGD lime softening water treatment plant for a total<br />

expanded capacity of 32.0 MGD, along with other potable water supply facilities.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, Hollywood, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member providing professional engineering services to the City of Hollywood for numerous years. Professional services provided<br />

include preliminary design, preparation of final design and construction documents, permitting, bidding, and engineering services during<br />

construction, including construction inspection and administration. Projects delivered include multiple disciplines of engineering including water<br />

and wastewater engineering. Services include surveying, geotechnical engineering, design and preparation of contract documents, permitting,<br />

bidding, and construction phase services.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Consultant, Deltona, Florida<br />

Professional Services Construction (if applicable)<br />

On-going<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: A comprehensive evaluation of potable water supply treatment, and distribution facilities, along with a detailed assessment<br />

of the City wastewater system. The analysis addressed existing conditions as well as projected future conditions to develop a phased capital<br />

improvements plan.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Professional Services Construction (if applicable)<br />

2008<br />

Continuing Engineering Services, James E. Anderson 22.5 MGD Reverse Osmosis Water<br />

Treatment Plant, Port St. Lucie, Florida<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member providing continuing miscellaneous professional engineering services to the City of Port St. Lucie. Our broad ranges of<br />

services have encompassed planning, design, financing and construction administration.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Toho Water Authority Pump Station No. 60 and 97 improvements, Kissimmee, Florida<br />

Professional Services Construction (if applicable)<br />

2010<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Projects have included numerous lift station upgrades and refurbishments, pipelines and other engineering services.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Professional Services Construction (if applicable)<br />

2007-Current<br />

Continuing Engineering Services, City of Miami Beach Normandy Isles Streetscape and<br />

Infrastructure Improvements, Miami Beach, Florida<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member on the construction management for the potable water improvements associated with the roadway improvements of<br />

Normandy Boulevard. The project included 8,500 linear feet of 16-inch water main to replace and upgrade existing water mains.<br />

SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />

Page 19


E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

Charles W. Drake, P.G.<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />

Hydrogeologist<br />

a. Total<br />

29<br />

b. With Current Firm<br />

22<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

Professional Geologist, Florida, No. 37; Professional Geologist, Alabama, No. 440;<br />

B.S., University of Florida, 1982<br />

Professional Geologist, North Carolina, No. 1618; AIPG, Certified Professional Geologist,<br />

No. 11179<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

Professional Affiliations: Association of Groundwater Scientists and Engineers; Florida Association of Professional Geologists President – FAPG;<br />

American Water Resources Association; American Institute of Professional Geologists Executive committee<br />

19. Relevant Projects<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, North Miami Beach, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Scope included preliminary design, final design, permitting, and construction services to expand plant capacity to treat a<br />

total of 32.0 MGD with nanofiltration and low pressure reverse osmosis technologies. The expanded facility consists of 15.0 MGD from existing<br />

lime softening facilities, 9.0 MGD for new nanofiltration facilities, 6.0 MGD from new low pressure reverse osmosis facilities, and 2.0 MGD of<br />

micron filtered raw water blend. The existing facilities were also expanded and improved<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Water and Wastewater Consultant, Naples, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for the Continuing Water and Wastewater Engineering Consulting Services for the City of Naples. Services to the City have<br />

included, Permitting, Water and wastewater system evaluations, Miscellaneous water main and wastewater collection system extensions, water<br />

and wastewater system operations, Master planning, Hydrogeological and water resources, and Financial management as it relates to the water<br />

and wastewater facilities.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Consultant, Deltona, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member providing services for the Continuing Consultant contract for the City of Deltona. Services to the city have included support<br />

to several departments including Public Works, Public Utilities, Development Services, Parks and Recreation and the Building and Fire<br />

Department.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Miscellaneous Engineering, Cape Coral, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for the Continuing Miscellaneous Professional Engineering Services to the City of Cape Coral. Projects have included lift<br />

station refurbishment design, water and wastewater treatment plant modifications, utility infrastructure improvements and other miscellaneous<br />

engineering services as needed<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, James E. Anderson 22.5 MGD Reverse Osmosis Water<br />

Treatment Plant, Port St. Lucie, Florida<br />

Professional Services<br />

2008<br />

Construction (if applicable)<br />

2008<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Performed as Hydro Discipline Leader for the ROWTP Expansion from 6.0 MGD ROWTP to 22.5 MGD including, design,<br />

permitting, and construction administration. <strong>Tetra</strong> <strong>Tech</strong> was the engineer of record for the original 6.0 MGD ROWTP and the subsequent<br />

expansion to 22.5 MGD. The project included raw water supply, pipelines, membrane treatment, pre- and post-treatment, high service pumping,<br />

four 4 MG ground storage tanks, and concentrate disposal. This project was the second RO facility that <strong>Tetra</strong> <strong>Tech</strong> provided for the City treating<br />

the brackish Floridan Aquifer with reverse osmosis.<br />

SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />

Page 20


E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

Miguel A. Garcia, PG<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />

Hydrogeologist<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

B.S., University of Florida, 1998 Professional Geologist, Florida, No. 2355<br />

a. Total<br />

14<br />

b. With Current Firm<br />

9<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

Professional Affiliations: FAPG (Florida Association of Professional Geologists); AIPG (American Institute of Professional Geologist); AWWRA<br />

(American Water Resources Association); NGW (National Groundwater Association). Training: 40-hour OSHA Health and Safety Training, 2006;<br />

8-hour Refresher OSHA Health and Safety Training, 2012; Standard First Aid Training, 2010.<br />

19. Relevant Projects<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

f.<br />

g.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Water and Wastewater Consultant, Naples, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member responsible for the design, bidding, and summary report for an Aquifer Storage and Recovery (ASR) exploratory test well for<br />

wetland recharge.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Consultant Deltona, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member responsible for the permitting, design, and installation of 10 wetland monitoring stations for the logging of water levels across<br />

the City’s water service area.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, James E. Anderson 22.5 MGD Reverse Osmosis Water<br />

Treatment Plant, Port St. Lucie, Florida<br />

Professional Services<br />

2008<br />

Construction (if applicable)<br />

2008<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member providing continuing miscellaneous professional engineering services to the City of Port St. Lucie. Our broad ranges of<br />

services have encompassed planning, design, financing and construction administration.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Toho Water Authority Pump Station No. 60 and 97 improvements, Kissimmee, Florida<br />

Professional Services<br />

2010<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member responsible for the design, bidding, and summary report for five (5) public supply and exploratory test wells using the Lower<br />

Floridian aquifer as an alternative water source<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Astatula Refueling Facility, Lake County, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Staff geologist during identification and delineation of a free product plume beneath the Refueling Facility USTs, and preparation of a report<br />

summarizing the most viable and cost effective remediation strategies to clean up the free product contamination beneath the Refueling Facility.<br />

Project Manager and Principal geologist responsible for preparation of Template Site Assessment Report (TSAR) for a FDEP Facility.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

City of Lake City, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Principal geologist responsible for design and construction oversight of monitor wells installations, as well as oversight during site remediation<br />

activities and project reporting.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Lake County Judicial Center, Lake County, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Project geologist responsible for preparation of contamination assessment and pilot test remediation reports for a petroleum contaminated site.<br />

SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />

Page 21


E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

W. Bruce Lafrenz, P.G. Hydrogeologist<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />

a. Total<br />

26<br />

b. With Current Firm<br />

15<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

B.S., University of Florida, 1981<br />

Professional Geologist, Florida, No. 1228<br />

M.S., University of Florida, 1986<br />

Professional Geologist, Georgia, No. 1411<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

Professional Affiliations: American Geophysical Union, American Institute of Professional Geologists/FAPG, American Water Resources<br />

Association, Geological Society of America, NGWA-Association of Groundwater Scientists and Engineers.<br />

19. Relevant Projects<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, North Miami Beach, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Scope included preliminary design, final design, permitting, and construction services to expand plant capacity to treat a<br />

total of 32.0 MGD with nanofiltration and low pressure reverse osmosis technologies. The expanded facility consists of 15.0 MGD from existing<br />

lime softening facilities, 9.0 MGD for new nanofiltration facilities, 6.0 MGD from new low-pressure reverse osmosis facilities, and 2.0 MGD of<br />

micron filtered raw water blend. The existing facilities were also expanded and improved. Primary roles include groundwater modeling and<br />

water well design QA/QC review.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Water and Wastewater Consultant, Naples, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for the Continuing Water and Wastewater Engineering Consulting Services for the City of Naples. Services to the City have<br />

included, permitting, water and wastewater system evaluations, Miscellaneous water main and wastewater collection system extensions, water<br />

and wastewater system operations, master planning, hydrogeological and water resources investigations, and financial management as it<br />

relates to the water and wastewater facilities. Primary roles include aquifer testing design and analysis, groundwater modeling, water use<br />

permitting, well design, and QA/QC review.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Consultant, Deltona, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member providing services for the Continuing Consultant contract for the City of Deltona. Services to the city have included support<br />

to several departments including Public Works, Public Utilities, Development Services, Parks and Recreation and the Building and Fire<br />

Department. Primary roles include aquifer testing and analysis, groundwater modeling, water use permitting, water well design, water resource<br />

exploration, and QA/QC review.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, James E. Anderson 22.5 MGD Reverse Osmosis Water<br />

Treatment Plant, Port St. Lucie, Florida<br />

Professional Services<br />

2008<br />

Construction (if applicable)<br />

2008<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member providing services for the ROWTP Expansion from 6.0 MGD ROWTP to 22.5 MGD including, design, permitting, and<br />

construction administration. <strong>Tetra</strong> <strong>Tech</strong> was the engineer of record for the original 6.0 MGD ROWTP and the subsequent expansion to 22.5<br />

MGD. The project included raw water supply, pipelines, membrane treatment, pre- and post-treatment, high service pumping, four 4 MG ground<br />

storage tanks, and concentrate disposal. Primary roles included groundwater modeling, water use permitting, and QA/QC review of well<br />

construction and testing data.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Toho Water Authority Pump Station No. 60 and 97 improvements, Kissimmee, Florida<br />

Professional Services Construction (if applicable)<br />

On-going<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member responsible for groundwater modeling, aquifer test analyses, and water use permitting. Participated in design, bidding, and<br />

summary report for five (5) public supply and exploratory test wells using the Lower Floridian aquifer as an alternative water source. Significant<br />

responsibility for QA/QC review of hydrogeological design, analysis, and reporting.<br />

SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />

Page 22


E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

William D. Musser, PE, LEED AP<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />

Project Engineer (Civil)<br />

a. Total<br />

28<br />

b. With Current Firm<br />

20<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

B.S., Environmental Engineering, University of Florida, Professional Engineer, Florida, No. 4118; North Carolina, No. 21316; Virginia, No. 0402;<br />

1984<br />

Maine, No. 11152<br />

M.S., Biological Sciences, University of Central Florida, Professional Hydrologist, AIH No. 1486; FDEP Qualified Stormwater Mgt. Inspector No.<br />

1995<br />

4752; LEED TM Accredited Professional; Certified Floodplain Manager<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

Professional Affiliations: ASCE; NAEP; FAEP; AIH; AWRA; SWS.<br />

19. Relevant Projects<br />

a.<br />

b.<br />

c.<br />

d..<br />

e.<br />

f.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, Key Biscayne, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member professional engineering services to the Village of Key Biscayne. Professional services provided include master planning,<br />

preliminary design, preparation of final design and construction documents, permitting, bidding, and engineering services during construction,<br />

including construction inspection and administration. Projects delivered include multiple disciplines of engineering including water resources,<br />

environmental permitting, transportation and others.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Water and Wastewater Consultant, Naples, Florida<br />

Professional Services Construction (if applicable)<br />

On-going<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Continuing water and wastewater engineering consulting services for the City. Services provided included permitting, water<br />

and wastewater system evaluations, miscellaneous water main and wastewater collection system extensions, water and wastewater system<br />

operations, master planning, hydrogeological and water resources, and financial management as it relates to the water and wastewater facilities.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Consultant, Deltona, Florida<br />

Professional Services Construction (if applicable)<br />

On-going<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Continuing Consultant contract for the City of Deltona. Services have included support to several departments including<br />

Public Works, Public Utilities, Development Services, Parks and Recreation and the Building and Fire Department.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Miscellaneous Engineering, Cape Coral, Florida<br />

Professional Services Construction (if applicable)<br />

On-going<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Continuing miscellaneous professional engineering services to the City. Projects included lift station refurbishment design,<br />

water and wastewater treatment plant modifications, utility infrastructure improvements and miscellaneous engineering services as needed.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, James E. Anderson 22.5 MGD Reverse Osmosis Water<br />

Treatment Plant, Port St. Lucie, Florida<br />

Professional Services<br />

2008<br />

Construction (if applicable)<br />

2008<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member providing continuing miscellaneous professional engineering services to the City of Port St. Lucie. Our broad ranges of<br />

services have encompassed planning, design, financing and construction administration.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Professional Services Construction (if applicable)<br />

2007-Current<br />

Continuing Engineering Services, City of Miami Beach Normandy Isles Streetscape and<br />

Infrastructure Improvements, Miami Beach, Florida<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for continuing engineering services. Professional services include coordinating designs and permitting efforts, sidewalk<br />

replacement, street-end, textured pavement improvements, roadway resurfacing, landscaping, irrigation, water main replacement, rear<br />

easement water service relocation, and lighting enhancements.<br />

SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />

Page 23


E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

Roderick K. Cashe, PE, LEED AP<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />

Project Engineer (Civil)<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

B.S.C.E., University of Florida, 1987<br />

Graduate Courses at the University of Central Florida<br />

a. Total<br />

23<br />

Professional Engineer, Florida, No. 45169<br />

National Construction Documents <strong>Tech</strong>nologist (CDT)<br />

FDEP Qualified Stormwater Management Inspector, No. 5366<br />

LEED® Accredited Professional<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

Professional Affiliations: American Society of Civil Engineers, Metro Orlando Economic Development Commission of Mid-Florida<br />

19. Relevant Projects<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

f.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, Key Biscayne, Florida<br />

Professional Services<br />

On-going<br />

b. With Current Firm<br />

18<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Provided include master planning, preliminary design, preparation of final design and construction documents, permitting,<br />

bidding, and engineering services during construction, including construction inspection and administration. Projects delivered include multiple<br />

disciplines of engineering including water resources, environmental permitting, transportation and others.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Water and Wastewater Consultant, Naples, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member as part of the continuing water and wastewater engineering consulting services for the City of Naples. Services provided to<br />

the City have included, Permitting, Water and wastewater system evaluations, Miscellaneous water main and wastewater collection system<br />

extensions, water and wastewater system operations, Master planning, Hydrogeological and water resources, and Financial management as it<br />

relates to the water and wastewater facilities.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Consultant, Deltona, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Managed the completion of engineering design, permitting and construction administration for several stormwater retrofit<br />

projects in the City of Deltona. Also served as project manager for over five (5) emergency pumping authorizations from the St. Johns River<br />

Water Management District (SJRWMD) to alleviate flooding as a result of 92-inches of rain in the year of 2002.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Miscellaneous Engineering, Cape Coral, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Continuing miscellaneous professional engineering services to the City. Projects included lift station refurbishment design,<br />

water and wastewater treatment plant modifications, utility infrastructure improvements and other miscellaneous engineering services as needed<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, James E. Anderson 22.5 MGD Reverse Osmosis Water<br />

Treatment Plant, Port St. Lucie, Florida<br />

Professional Services<br />

2008<br />

Construction (if applicable)<br />

2008<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member providing continuing miscellaneous professional engineering services to the City of Port St. Lucie. Our broad ranges of<br />

services have encompassed planning, design, financing and construction administration.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

City of Miami Beach Normandy Isles Streetscape and Infrastructure Improvements, Miami<br />

Beach, Florida<br />

Professional Services<br />

2007-Current<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Professional services include coordinating designs and permitting efforts, sidewalk replacement, street-end, textured<br />

pavement improvements, roadway resurfacing, landscaping, irrigation, water main replacement, rear easement water service relocation, and<br />

lighting enhancements.<br />

SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />

Page 24


E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

James R. Warner, PE<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />

Project Engineer (Civil)<br />

a. Total<br />

21<br />

b. With Current Firm<br />

18<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

B.S., Chemistry, Duke University, 1976<br />

M.S., Environmental Engineering and Science, Professional Engineer, Florida, No. 34204<br />

University of Central Florida, 1980<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

Professional Affiliations: American Water Works Association. Florida Pollution Control Association, Water Environment <strong>Tech</strong>nology, Florida<br />

Engineering Society, Southeast Desalting Association, American Membrane <strong>Tech</strong>nology Association, Water Reuse Association.<br />

19. Relevant Projects<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, North Miami Beach, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for continuing services for a variety of design, permitting, and construction services tasks for integrating a 9 MGD membrane<br />

softening facility and a 6 MGD low pressure reverse osmosis facility with an existing 15 MGD lime softening water treatment plant for a total<br />

expanded capacity of 32.0 MGD, along with other potable water supply facilities.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, Key Biscayne, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Professional services provided include master planning, preliminary design, preparation of final design and construction<br />

documents, permitting, bidding, and engineering services during construction, including construction inspection and administration. Projects<br />

delivered include multiple disciplines of engineering including water resources, environmental permitting, transportation and others.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Consultant, Deltona, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member. <strong>Tetra</strong> <strong>Tech</strong> has served as a Continuing Consultant for the City of Deltona since April of 2002. Our services have included<br />

support to several departments including Public Works, Public Water and Wastewater, Utilities, Development Services, Parks and Recreation<br />

and the Building and Fire Department. Our public works services included: CIP planning and budgeting; stormwater utility study and rate<br />

adjustment; Stormwater Retrofit Projects; flood plain modeling and mapping; grant support; stormwater master plan update; survey/mapping of<br />

various infrastructure; CEI services; and emergency management support during flooding.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Toho Water Authority Pump Station No. 60 and 97 improvements, Kissimmee, Florida<br />

Professional Services Construction (if applicable)<br />

2010<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: providing continuing miscellaneous professional engineering services to the Toho Water Authority. Projects have included<br />

numerous lift station upgrades and refurbishments, pipelines and other engineering services.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Professional Services Construction (if applicable)<br />

2007-Current<br />

Continuing Engineering Services, City of Miami Beach Normandy Isles Streetscape and<br />

Infrastructure Improvements, Miami Beach, Florida<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Professional services include coordinating designs and permitting efforts, sidewalk replacement, street-end, textured<br />

pavement improvements, roadway resurfacing, landscaping, irrigation, water main replacement, rear easement water service relocation, and<br />

lighting enhancements.<br />

SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />

Page 25


E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

Lawrence E. Jenkins, PSM<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />

Survey/GIS<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

Valencia Community College, Orlando<br />

Mid-Florida <strong>Tech</strong>nical Institute, Orlando B.S., University<br />

of Florida, 1998<br />

Professional Surveyor and Mapper, Florida, No. 5364<br />

Professional Surveyor and Mapper, Alabama, No. 29414-S<br />

a. Total<br />

28<br />

b. With Current Firm<br />

19<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

Professional Affiliations: FAPG (Florida Association of Professional Geologists); AIPG (American Institute of Professional Geologist); AWWRA<br />

(American Water Resources Association); NGW (National Groundwater Association). Training: 40-hour OSHA Health and Safety Training, 2006;<br />

8-hour Refresher OSHA Health and Safety Training, 2012; Standard First Aid Training, 2010.<br />

19. Relevant Projects<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

f.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Water and Wastewater Consultant, Naples, Florida<br />

Professional Services Construction (if applicable)<br />

On-going<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member responsible for performing multiple surveying tasks for City of Naples Utility projects, including surveying at the East Naples<br />

and Solana Road Booster Stations and the City’s Golden Gate wellfield, amongst other tasks.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Consultant, Deltona, Florida<br />

Professional Services Construction (if applicable)<br />

On-going<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member as part of the Continuing Consultant contract for the City of Deltona. Services have included support to several departments<br />

including Public Works, Public Utilities, Development Services, Parks and Recreation and the Building and Fire Department.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, James E. Anderson 22.5 MGD Reverse Osmosis Water<br />

Treatment Plant, Port St. Lucie, Florida<br />

Professional Services<br />

2008<br />

Construction (if applicable)<br />

2008<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member providing continuing miscellaneous professional engineering services to the City of Port St. Lucie. Our broad ranges of<br />

services have encompassed planning, design, financing and construction administration.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Toho Water Authority Pump Station No. 60 and 97 improvements, Kissimmee, Florida<br />

Professional Services Construction (if applicable)<br />

2010<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member providing continuing miscellaneous professional engineering services to the Toho Water Authority. Projects have included<br />

numerous lift station upgrades and refurbishments, pipelines and other engineering services.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Professional Engineering Services, City of Minneola, Florida<br />

Professional Services Construction (if applicable)<br />

On-going<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Survey Project Manager providing continuing miscellaneous professional engineering services to the City of Minneola. Our broad range of<br />

services has included planning, engineering, permitting and construction administration for numerous projects.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Professional Engineering Services, City of Clermont, Florida:<br />

Professional Services Construction (if applicable)<br />

On-going<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Survey Project Manager providing continuing miscellaneous professional engineering services to the City of Clermont. Our broad scope of<br />

services has included design, permitting and construction administration.<br />

SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />

Page 26


E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

Betty A. Morris<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />

Survey/GIS<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

AA, Valencia College<br />

N/A<br />

a. Total<br />

19<br />

b. With Current Firm<br />

14<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

Professional Affiliations: Urban and Regional Information Systems Associations (URISA), URISA Florida Chapter, ESRI Florida Users Group,<br />

Central Florida GIS Users Group Workshops & Certifications: Haestad Methods/Autodesk Modeling Seminar, March 2004; ESRI<br />

Water/Wastewater Database Design Conference 2004, February 2004; ESRI Intro to ArcGIS II, August 2003; ESRI Intro to ArcGIS I, August 2003<br />

URISA Cartography and Map Design, August 2000; College courses taken in C Programming, C++ Programming, Visual Basic Programming,<br />

Systems Analyst, and Database Management. Awards: National Association of Development Organizations (NADO) 2010 Innovation Award for<br />

Avon Park Air Force Range Joint Land Use Study; Florida Planning & Zoning Association (FPZA) 2005 Award of Innovation Planning Study & Florida<br />

Association of Property Appraisers (FAPA) 2004 Award of Excellence, both for recognition of <strong>Tetra</strong> <strong>Tech</strong>’s Joint Land Use Study prepared for the<br />

Santa Rosa County Board of County Commissioner in 2003<br />

19. Relevant Projects<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Water and Wastewater Consultant, Naples, Florida<br />

Professional Services Construction (if applicable)<br />

On-going<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member performing a variety of day-to-day tasks ranging associated with the City’s water, wastewater and reclaimed water systems<br />

including but not limited to: wellfield design for raw water supply, assistance with permitting (Collier County, FDEP, SFWMD), booster pump<br />

station improvements and improved storage, security improvements, hydraulic modeling, reclaimed water system improvements, and assisted<br />

with stormwater issues.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Consultant, Deltona, Florida<br />

Professional Services Construction (if applicable)<br />

On-going<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member as part of the Continuing Consultant contract for the City of Deltona since April of 2002. Our services have included support<br />

to several departments including Public Works, Public Water and Wastewater, Utilities, Development Services, Parks and Recreation and the<br />

Building and Fire Department. Our public works services included: CIP planning and budgeting; stormwater utility study and rate adjustment;<br />

Stormwater Retrofit Projects; flood plain modeling and mapping; grant support; stormwater master plan update; survey/mapping of various<br />

infrastructure; CEI services; and emergency management support during flooding.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

City of Punta Gorda, Florida<br />

Professional Services Construction (if applicable)<br />

On-going<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Water and Wastewater system GIS mapping. Mapping the City’s complete water and wastewater system from as-builts into CAD with all<br />

feature types. Designed GIS symbology database for porting to client’s GIS.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

City of Winter Garden, Florida<br />

Professional Services Construction (if applicable)<br />

On-going<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Collaborated with the Director of Planning, Zoning Development, in creating and maintaining the Existing and Future Land Use Maps. Analyzed<br />

land use and hydric soil types for illustrating future potentially developable land.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

City of Orange City, Florida<br />

Professional Services Construction (if applicable)<br />

On-going<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Assisted in the creation of a GIS database from AutoCAD drawings of the City’s utilities and the production of an Atlas to aid City field<br />

technicians. Worked with City Planner, in creating and managing land use and zoning GIS databases. Produced high quality maps from the GIS<br />

database for use by the City, as well as their distribution to outside firms/clients.<br />

SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />

Page 27


E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

Felix W. Yao, P.E.<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />

Electrical Engineer (Electrical Instrumentation<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

B.S., Electrical Engineering, Kettering University, 2003 Professional Engineer, Florida, No. 6963<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

a. Total<br />

7<br />

b. With Current Firm<br />

5<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

f.<br />

19. Relevant Projects<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, Alexander Orr Water Treatment Plant and South Miami-<br />

Dade Water Supply Systems, Miami, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for the Alexander Orr, Jr. Water Treatment Plant Continuing Services. This project provides engineering services to<br />

evaluate and rehabilitate or replace process equipment. Other key projects include the lime kiln mechanical and electrical upgrades study, a<br />

process optimization study and a secondary settlement basin bypass study.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Toho Water Authority Pump Station No. 60 and 97 improvements, Kissimmee, Florida<br />

Professional Services<br />

2010<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member providing professional engineering services to the Toho Water Authority. Projects have included numerous lift station<br />

upgrades and refurbishments, pipelines and other engineering services.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Eustis Wastewater Treatment Plant, Lake County, Florida<br />

Professional Services<br />

2010<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Project Engineer for the design of the power distribution system and interior and exterior lighting. Also replaced the existing control system<br />

which was based on a combination of CompactLogix PLCs and MicroLogix PLCs.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

South Florida Water Management District G-370 & G-372 Pump Stations, Clewiston, Florida<br />

Professional Services<br />

2010<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Electrical Engineer. Designed the control system upgrades to be capable of manually operating the pump station if all the local and remote<br />

automation failed to avoid catastrophic flooding in the area.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

OUC Eastern Water Treatment Facility Orlando, Florida<br />

Professional Services<br />

2010<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Designed the 4160V parallel emergency standby generators, neutral grounding resistors, 4160V power distribution system, and control system,<br />

for the expansion of the plant from 50MGD to 62.5MGD. Coordinated power feed with utility provider.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Poinciana Wastewater Treatment Plant #2, Toho Water Authority, Kissimmee, Florida<br />

Professional Services<br />

2007<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Project Engineer for electrical and instrumentation for the upgrade and expansion of the Poinciana WRF #2. The WRF treatment capacity will<br />

be increased from 3.0 to 6.0 MGD. Project also includes abandoning the SBR process in favor of the Modified Ludzing Ettinger (MLE) process,<br />

new filtration facilities, modifications to the influent screens, a new grit removal system, odor control for the screening and grit removal<br />

operations, a new chlorine contact basin with transfer pumps, new effluent storage and pumping, new residuals handling, and associated<br />

electrical and instrumentation.<br />

SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />

Page 28


E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

William A. Paison, PE, LEED AP<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Ann Arbor, Michigan<br />

Electrical Engineer<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

B.S., Electrical Engineering, University of Michigan,<br />

1994<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

a. Total<br />

18<br />

b. With Current Firm<br />

15<br />

Professional Engineer in the states of: Michigan, No. 50403; Colorado, No 41332;<br />

Kentucky, No. 26701; Arizona, No 48738<br />

Construction Documents <strong>Tech</strong>nologist, Construction Specifications Institute<br />

MHSA Certified<br />

LEED Accredited Professional<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

19. Relevant Projects<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Professional Services Construction (if applicable)<br />

On-going<br />

Continuing Engineering Services, Alexander Orr Water Treatment Plant and South Miami-<br />

Dade Water Supply Systems, Miami, Florida<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for the Alexander Orr, Jr. Water Treatment Plant Continuing Services. This project provides engineering services to<br />

evaluate and rehabilitate or replace process equipment. Other key projects include the lime kiln mechanical and electrical upgrades study, a<br />

process optimization study and a secondary settlement basin bypass study.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Toho Water Authority Pump Station No. 60 and 97 improvements, Kissimmee, Florida<br />

Professional Services Construction (if applicable)<br />

2010<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member providing professional engineering services to the Toho Water Authority. Projects have included numerous lift station<br />

upgrades and refurbishments, pipelines and other engineering services.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Kerr Lake Campsite Water and Electrical Improvements, Mecklenburg County, Virginia<br />

Professional Services Construction (if applicable)<br />

2011<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Electrical ITR Lead for the conceptual and detailed design of water and electrical service provision to 47 additional campsites within the Site C<br />

and D camping areas of North Bend Park at Kerr Lake. Procured and managed subconsultants to include utility and land survey. This was an<br />

ARRA funded project.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

St. Croix Falls Wastewater Treatment Plants, Wisconsin<br />

Professional Services Construction (if applicable)<br />

2010<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Designed the power distribution system, and control system replacement associated with the doubling of the plant capacity. Power distribution<br />

was converted from 120/208 volt, 3 phase to 480/277 volt, 3 phase. A fiber optic network was installed to provide a robust SCADA network<br />

between the three buildings on site. Coordinated power feed upgrades with City utility provider, along with temporary feeds during construction.<br />

Project was designed to meet the stringent requirements of the United States of America Corp of Engineers.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Five Base Wastewater Treatment Plants, Afghanistan<br />

Professional Services Construction (if applicable)<br />

2010<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Designed the power distribution system, and control system, for five (5) separate treatment plants. Two (2) plants were lagoon processes and<br />

the remaining three (3) were extended aeration plants. Provided redundant generator power for the plants in lieu of utility power. Project was<br />

designed to meet the stringent requirements of the United States Department of Defense.<br />

SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />

Page 29


E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

Andrew T. Woodcock, PE, MBA<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />

Finance/Capital Planning<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

B.S.E., University of Central Florida, 1988<br />

Professional Engineer, Florida, No. 47118<br />

M.S.E., University of Central Florida, 1989<br />

Professional Engineer, Louisiana, No. 34145<br />

M.B.A., Rollins College,2001<br />

Professional Engineer, Alabama, No. 30585<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

Professional Affiliations: Water Environment Federation, American Water Works Association, Florida Stormwater Association.<br />

19. Relevant Projects<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

f.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Water and Wastewater Consultant, Naples, Florida<br />

a. Total<br />

21<br />

Professional Services<br />

On-going<br />

b. With Current Firm<br />

20<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member as part of the continuing water and wastewater engineering consulting services for the City of Naples. Services provided to<br />

the City have included, Permitting, Water and wastewater system evaluations, Miscellaneous water main and wastewater collection system<br />

extensions, water and wastewater system operations, Master planning, Hydrogeological and water resources, and Financial management as it<br />

relates to the water and wastewater facilities.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Consultant, Deltona, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member as part of the Continuing Consultant contract for the City of Deltona. Services have included support to several departments<br />

including Public Works, Public Utilities, Development Services, Parks and Recreation and the Building and Fire Department.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Miscellaneous Engineering, Cape Coral, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member providing continuing miscellaneous professional engineering services to the City of Cape Coral. Projects have included lift<br />

station refurbishment design, water and wastewater treatment plant modifications, utility infrastructure improvements and other miscellaneous<br />

engineering services as needed.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, James E. Anderson 22.5 MGD Reverse Osmosis Water<br />

Treatment Plant, Port St. Lucie, Florida<br />

Professional Services<br />

2008<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member providing continuing miscellaneous professional engineering services to the City of Port St. Lucie. Our broad ranges of<br />

services have encompassed planning, design, financing and construction administration.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Professional Engineering Services, City of Minneola, Florida:<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Project Engineer providing continuing miscellaneous professional engineering services to the City of Minneola. Our broad range of services<br />

has included planning, engineering, permitting and construction administration for numerous projects.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Professional Engineering Services, Daytona Beach, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Project Engineer providing continuing miscellaneous professional engineering services to the City of Daytona Beach. Projects have ranged from<br />

planning, to design and construction administration.<br />

SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />

Page 30


E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

Jennifer L. Woodall, P.E., MBA<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />

Finance/Capital Planning<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

B.S., Georgia Institute of <strong>Tech</strong>nology, 1994<br />

Professional Engineer, Florida, No. 55515<br />

M.B.A., University of Florida, 2001<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

American Water Works Association<br />

Water Environmental Federation<br />

19. Relevant Projects<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, North Miami Beach, Florida<br />

a. Total<br />

15<br />

Professional Services<br />

On-going<br />

b. With Current Firm<br />

15<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for continuing services for a variety of design, permitting, and construction services tasks for integrating a 9 MGD membrane<br />

softening facility and a 6 MGD low pressure reverse osmosis facility with an existing 15 MGD lime softening water treatment plant for a total<br />

expanded capacity of 32.0 MGD, along with other potable water supply facilities.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, Hollywood, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member providing professional engineering services to the City of Hollywood for numerous years. . Professional services provided<br />

include preliminary design, preparation of final design and construction documents, permitting, bidding, and engineering services during<br />

construction, including construction inspection and administration. Projects delivered include multiple disciplines of engineering including water<br />

and wastewater engineering. Services include surveying, geotechnical engineering, design and preparation of contract documents, permitting,<br />

bidding, and construction phase services.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, Key Biscayne, Florida<br />

Professional Services Construction (if applicable)<br />

On-going<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for continuing services providing professional engineering services to the Village of Key Biscayne for numerous years.<br />

Professional services provided include master planning, preliminary design, preparation of final design and construction documents, permitting,<br />

bidding, and engineering services during construction, including construction inspection and administration. Projects delivered include multiple<br />

disciplines of engineering including water resources, environmental permitting, transportation and others. Some recently completed key projects<br />

include the Stormwater Master Plan Update and various drainage improvements.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Professional Services Construction (if applicable)<br />

On-going<br />

Continuing Engineering Services, Alexander Orr Water Treatment Plant and South Miami-<br />

Dade Water Supply Systems, Miami, Florida<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for the Alexander Orr, Jr. Water Treatment Plant Continuing Services. This project provides engineering services to<br />

evaluate and rehabilitate or replace process equipment. Other key projects include the lime kiln mechanical and electrical upgrades study, a<br />

process optimization study and a secondary settlement basin bypass study.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Professional Services Construction (if applicable)<br />

2007-Current<br />

Continuing Engineering Services, City of Miami Beach Normandy Isles Streetscape and<br />

Infrastructure Improvements, Miami Beach, Florida<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for this major neighborhood improvement project. This project included coordinated designs, permitting, and construction<br />

services for sidewalk replacement, street-end design, textured pavement improvements, roadway resurfacing, landscaping, irrigation, water<br />

main replacement, rear easement water service relocation, and lighting enhancements.<br />

SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />

Page 31


E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

Gary Revoir, PE<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />

QA/QC<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

BSE, Environmental Engineering., University of Florida,<br />

1988<br />

Professional Engineer, Florida, No. 46684<br />

MSE, Environmental Engineering, University of Central<br />

Florida, 1995<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

a. Total<br />

23<br />

b. With Current Firm<br />

1<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Iron Bridge Regional Water Reclamation Facility, Orlando, Florida<br />

Professional Services<br />

2001<br />

Construction (if applicable)<br />

2008<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Project Manager. The scope of services for this project included the planning, permitting and final design services to convert, with rerating and<br />

expansion, a 24.0 MGD-AADF AWT process to a 40.0 MGD-AADF AWT process. The treatment facility included a full 5-stage modified<br />

Bardenpho advanced biological nutrient removal treatment system with tertiary filtration and high-level disinfection facilities for reclaimed water<br />

production.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Wetlands Pumping Station Expansion, Orlando, Florida<br />

Professional Services<br />

2003<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Project Manager. The scope of services for this project included the capacity evaluation of an existing 20.0 MGD effluent pumping station and<br />

48-inch effluent transmission main for the City of Orlando’s IBRWRF. The project included hydraulic modeling and surge analysis of the 15-mile<br />

effluent transmission main, alternative pump station expansion evaluations and preliminary design for expansion of the station and options for<br />

increasing flow to the City’s Wetlands.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Alternative Analysis for Treatment and Effluent Disposal for the City’s Regional Water<br />

Reclamation Facility, Altamonte Springs, Florida<br />

Professional Services<br />

2011<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Project Manager. The scope of services for this assignment consisted of performing a technical evaluation of various advanced treatment<br />

process improvements, operational strategies and effluent disposal management practices as a means to reduce nitrogen and phosphorus<br />

levels in the treated effluent as an overall strategy for potential elimination of the river discharge in order to meet the requirements of a recently<br />

enacted TMDL issued by the State of Florida as well as compliance with the recently enacted NNC.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Infiltration/Inflow Study and Repair Program, Ft. Pierce, Florida<br />

Professional Services<br />

1998<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Project Manager responsible for the technical management and project coordination of a city-wide program to identify and remove inflow and<br />

infiltration from the Authority’s wastewater collection system. The program was initiated due to large quantity of extraneous contributions to the<br />

collection system during wet weather conditions exceeding system capacity. The Phase I field services consisted of smoke-testing 273,000<br />

linear feet of gravity sewer mains, inspection of over 1,000 manholes, CCTV and cleaning of 80,000 linear feet of 8-inch sewer mains and over<br />

40,000 linear feet of 18-, 24-, 30-, and 36-inch gravity sewer mains.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Wetlands Elimination and Effluent Disposal Plan, Seminole County, Florida<br />

Professional Services Construction (if applicable)<br />

2006<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Project Engineer for the preparation of a wetlands elimination and effluent disposal plan as part of their overall wastewater master plan. The<br />

scope of services included coordination with engineering and operations staff, technical input, and preparation of a draft and final report<br />

summarizing the findings of the study. The evaluation consisted of assessing use of reclaimed water under several scenarios, including<br />

wetlands elimination, provided guidance to County staff on current capacities, future disposal needs, and recommended overall strategy for<br />

wetlands utilization and potential elimination.<br />

SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />

Page 32


F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S<br />

QUALIFICATIONS FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

20. Example Project Key Number<br />

(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)<br />

21. Title and Location (City and State) 22. Year Complete<br />

Professional Services Construction (if applicable)<br />

Continuing Engineering Services, North Miami Beach, Florida<br />

On-going<br />

23. Project Owner’s Information<br />

a. Project Owner b. Point of Contact Name c. Point of Contact Telephone Number<br />

City of North Miami Beach Dr. Jeff An 305.948.2967<br />

24. Brief Description of Project and Relevance to this Contract (include scope, size, and cost)<br />

1<br />

P<br />

General Engineering Services: The City<br />

of North Miami Beach's existing water treatment facilities include approximately 15.0 million gallons per day (MGD) of lime<br />

softening water treatment facilities located at the Norwood-Oeffler Water Treatment Plant (WTP). In June 2001 <strong>Tetra</strong> <strong>Tech</strong> was<br />

contracted to perform preliminary design, final design, permitting, and construction services to expand plant capacity to treat a<br />

total of 32.0 MGD with nanofiltration and low pressure reverse osmosis technologies. The expanded facility consists of 15.0<br />

MGD from existing lime softening facilities, 9.0 MGD for new nanofiltration facilities, 6.0 MGD from new low pressure reverse<br />

osmosis facilities, and 2.0 MGD of micron filtered raw water blend. The existing facilities were also expanded and improved.<br />

Improvements to the WTP included:<br />

• 8-new Biscayne aquifer wells and 3-new Floridian aquifer wells<br />

• 1-deep injection well for concentrate disposal<br />

• Bulk chemical facilities<br />

• High-pressure feed pumps with variable frequency drives<br />

• 9.0 MGD of nanofiltration and 6.0 MGD of LPRO membrane<br />

treatment facilities<br />

• Degasification and odor control facilities<br />

• New operations and process buildings<br />

• Associated yard piping, site work, paving, drainage and grading<br />

• Electrical and instrumentation facilities<br />

• 2-new ground storage tanks and new high service pumping facilities<br />

• Gravity sludge thickening facilities<br />

• Security System<br />

Project Highlights<br />

• Integration of membrane treatment<br />

technology at an existing facility to provide<br />

better finished water quality and an<br />

additional 15 MGD of capacity.<br />

• Project included alternative water supply<br />

funding form the SFWMD<br />

• Project Value: $ 65,000,000.<br />

• The following disciplines are covered<br />

under this project:<br />

- Water<br />

- Wastewater<br />

- Hydrogeology<br />

- Civil<br />

- Finance/Capital Planning Design<br />

Construction administration services were also provided for this project,<br />

including bidding services and construction management. Upon completion of the project, <strong>Tetra</strong> <strong>Tech</strong> prepared record drawings<br />

and certified the project complete to the Florida Department of Health and Miami-Dade DERM.<br />

25. Firms from Section C Involved with this Project<br />

(1) Firm Name (2) Firm Location (City and State) (3) Role<br />

a <strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>. Miami, FL Prime<br />

Page 33<br />

F-1 FORM SF330 PART I


F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S<br />

QUALIFICATIONS FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

20. Example Project Key Number<br />

(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)<br />

21. Title and Location (City and State) 22. Year Complete<br />

Professional Services Construction (if applicable)<br />

Continuing Engineering Services, Hollywood, Florida<br />

2005-2012<br />

23. Project Owner’s Information<br />

a. Project Owner b. Point of Contact Name c. Point of Contact Telephone Number<br />

City of Hollywood Francois A. Domond, PE 954.921.3930<br />

24. Brief Description of Project and Relevance to this Contract (include scope, size, and cost)<br />

General Engineering Services: <strong>Tetra</strong> <strong>Tech</strong> has provided professional<br />

engineering services to the City of Hollywood for over seven years. .<br />

Professional services provided include preliminary design, preparation of final<br />

design and construction documents, permitting, bidding, and engineering<br />

services during construction, including construction inspection and<br />

administration. Projects delivered include multiple disciplines of engineering<br />

including water and wastewater engineering. Services include surveying,<br />

geotechnical engineering, design and preparation of contract documents,<br />

permitting, bidding, and construction phase services.<br />

Project Highlights<br />

• Conversion of five wet pit/dry pit pump<br />

stations to submersible type pump station<br />

• Project Value – 1,665,000<br />

• The following disciplines are covered<br />

under this project:<br />

- Wastewater<br />

- Finance/Capital Planning Design<br />

The conversion of pump stations A4, N1, N7, and W20 provided design,<br />

permitting and construction administration services for the conversion of five<br />

wet pit / dry pit pump stations in the City of Hollywood to submersible pump stations ranging in size from 0.5 MGD to 2.5<br />

MGD. Construction permits were obtained for the improvements to each pump station from the Broward County Department of<br />

Planning and Environmental Protection. Upgrades were completed at stations A-4 on N 64th Avenue, N-1 on 4080 N. Hills<br />

Drive, N-5 on N. 34th Avenue, N-7 on Green Street and W-20 on N 50th Avenue. At each location, upgrades included new<br />

submersible pumps, electric services, control panels and level sensors. Special project considerations included limitations on<br />

noise levels within residential areas and lift station by-pass procedures to ensure continuous operation at each existing pump<br />

station. <strong>Tetra</strong> <strong>Tech</strong> performed weekly project site visits during the 15 month construction period to verify that the work was<br />

proceeding in accordance with the design documents<br />

The water main replacement project from Hollywood Boulevard to Johnson Street between N. 46 Avenue and N. 52 Avenue<br />

consists of the replacement of approximately 26,000 feet of 4-inch, 6-inch, 8-inch, and 12-inch existing water mains along local<br />

City streets and paved alleys sharing the right-of-way with other existing utilities such as power, telephone, cable, gas and force<br />

main. These improvements involve upgrading 2-inch, 4-inch, and 6-inch water mains one nominal size and replacing 8-inch and<br />

12-inch water mains with the same nominal size. The existing water mains will be replaced new with PVC water mains, isolation<br />

valves, fire hydrants, and water services.<br />

2<br />

P<br />

25. Firms from Section C Involved with this Project<br />

(1) Firm Name (2) Firm Location (City and State) (3) Role<br />

a <strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>. Miami, FL Prime<br />

Page 34<br />

F-1 FORM SF330 PART I


F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S<br />

QUALIFICATIONS FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

20. Example Project Key Number<br />

(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)<br />

21. Title and Location (City and State) 22. Year Complete<br />

Professional Services Construction (if applicable)<br />

Continuing Engineering Services, Key Biscayne, Florida<br />

Ongoing<br />

23. Project Owner’s Information<br />

a. Project Owner b. Point of Contact Name c. Point of Contact Telephone Number<br />

Village of Key Biscayne John C. Gilbert, Village Manager (305) 365-5514<br />

24. Brief Description of Project and Relevance to this Contract (include scope, size, and cost)<br />

General Engineering Services: <strong>Tetra</strong> <strong>Tech</strong> has provided professional engineering<br />

services to the Village of Key Biscayne for over 15 years. Professional services<br />

provided include master planning, preliminary design, preparation of final design<br />

and construction documents, permitting, bidding, and engineering services during<br />

construction, including construction inspection and administration. Projects<br />

delivered include multiple disciplines of engineering including water resources,<br />

environmental permitting, transportation and others. Some recently completed key<br />

projects include the Stormwater Master Plan Update and various drainage<br />

improvements.<br />

Other services provided to the Village include bid advertising, public involvement,<br />

ordinance reviews, GIS implementation, and surveying.<br />

The continuing services include the following projects:<br />

Ongoing:<br />

• CRS 5-year Recertification<br />

• FEMA Community Assisted Visit comments response<br />

• NPDES Standard Operating Procedures<br />

• Flood damage prevention revision implementation<br />

• Elevation Certificates review<br />

Completed:<br />

• Stormwater Master Plan Update – December 2011<br />

• West Wood Drive Traffic Calming Improvements – November 2011<br />

• Repetitive Loss Area Analysis – 2010.<br />

• Drainage Improvements for Buttonwood Drive, Glenridge Road and Woodcrest<br />

Road – 2007<br />

• Harbor Drive Drainage Improvements –2005<br />

• Grapetree Drive Traffic Calming Improvements project - 2003<br />

• NPDES Reports 2003, 2004, 2005, 2006, 2007, 2008, 2009, 2010<br />

• East Enid Traffic Calming and Roadway Improvements – Completed in 2000.<br />

• West Wood Drive and West Heather Drive Traffic Calming and Sidewalk<br />

Improvements –1999.<br />

• Harbor Drive Traffic Calming –1998.<br />

• Fernwood Road Improvements –1997<br />

3<br />

Project Highlights<br />

• Service provided for 15 years<br />

• The following disciples are covered<br />

under this project:<br />

- Wastewater<br />

- Civil<br />

- Finance/Capital Planning Design<br />

• Project Value: $ 200,000+<br />

25. Firms from Section C Involved with this Project<br />

(1) Firm Name (2) Firm Location (City and State) (3) Role<br />

a <strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>. Miami, FL Prime<br />

Page 35<br />

F-1 FORM SF330 PART I


Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

P<br />

F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S<br />

QUALIFICATIONS FOR THIS CONTRACT<br />

20. Example Project Key Number<br />

(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)<br />

21. Title and Location (City and State) 22. Year Complete<br />

Professional Services Construction (if applicable)<br />

Continuing Engineering Services, Alexander Orr Water Treatment Plant and<br />

South Miami-Dade Water Supply Systems, Miami, Florida<br />

On-going<br />

23. Project Owner’s Information<br />

a. Project Owner b. Point of Contact Name c. Point of Contact Telephone Number<br />

Miami-Dade Water and Sewer Department Mr. Rafael A. Terrero, PE, BCEE 786.552.8112<br />

24. Brief Description of Project and Relevance to this Contract (include scope, size, and cost)<br />

General Engineering Services: <strong>Tetra</strong> <strong>Tech</strong>, as a subconsultant, is<br />

assisting the Miami-Dade Water and Sewer Department (MDWASD)<br />

with the renewal, improvement, and process optimization of the South<br />

Dade water system, including its largest water treatment plant. The<br />

Alexander Orr, Jr. Water Treatment Plant (Orr WTP) is one of the<br />

largest water treatment plants in the southeastern United States. The<br />

Orr WTP treats Biscayne Aquifer water with lime softening, filtration,<br />

and disinfection. This project was established to identify and<br />

implement project needs to maintain efficient operation of the Orr<br />

WTP and system and the South Miami-Dade water treatment plants<br />

and systems, which provide potable water to much of Miami-Dade<br />

County.<br />

Task Authorization No.1 included preparing a facility assessment of<br />

the Orr WTP. We assisted in the preparation of the facility assessment<br />

completed in February 2010, which included the evaluation and<br />

recommendation of equipment repairs, replacements and/or improvements, associated planning-level cost estimates and a<br />

prioritization schedule of the identified facility needs for the Orr WTP. The purpose of the facility assessment was to produce a<br />

descriptive, prioritized schedule of required renewal and replacement (R&R) projects, capital projects, and operation and<br />

maintenance (O&M) projects to assist MDWASD personnel to continue to effectively operate the facility and meet permit<br />

requirements.<br />

Task Authorization No. 2 includes assisting with the development of<br />

the basis of design, construction contract documents, cost estimates,<br />

permitting, and construction phase services for the Orr WTP Lime<br />

Kiln Upgrade. Construction phase services will include bidding,<br />

construction administration, inspection, start-up and project close-out<br />

services.<br />

Task Authorization No. 9 includes assisting with the evaluation of<br />

available options to redirect the effluent flow from the Orr WTP’s<br />

Hyrotreaters® to the chlorine contact/settling basins. The analysis<br />

focuses on options that allow the Plant staff to place individual<br />

settling basin(s) and associated influent channel(s) out of service for<br />

maintenance and repairs. This study will result in a conceptual level<br />

design evaluation with associated planning level engineer’s opinion of<br />

Project Highlights<br />

• Provides renewal, improvement, and optimization for<br />

the majority of the MDWASD system<br />

• upgrading one of the largest and oldest lime softening<br />

treatment plants in the southeast United States<br />

• Project Value – $1,000.000<br />

• Disciplines covered; Water, Wastewater, Electrical<br />

Engineer (Electrical/Instrumentation), Finance/Capital<br />

Planning<br />

probable construction costs for MDWASD’s consideration and direction for subsequent detailed design efforts and<br />

corresponding construction improvements, as applicable.<br />

Task Authorization No. 11, includes assisting with a detailed Process Optimization Study for the Orr WTP. This study will focus<br />

on providing a prioritized and phased recommended process improvement plan for this facility. Process equipment efficiency<br />

and anticipated life-spans optimization will include:<br />

• Improved performance of the lime softening process to optimize/reduce the quantity of treatment chemicals utilized.<br />

• Enhanced solids separation performance that may eliminate the need for “chlorine contact/settling basins”, improve filter run<br />

times, control filtered water turbidity and reduce overall solids handling requirements.<br />

• <strong>Inc</strong>reased control of the recarbonation process to reduce or eliminate the corrosion of contact structures.<br />

• <strong>Inc</strong>reased treatment process automation to optimize plant maintenance and improve process control to support potable water<br />

quality objectives.<br />

• Replacement of selected equipment that is approaching its useful service life or represents out-of-date treatment technology<br />

systems to improve process effectiveness that delivers operation and maintenance cost savings.<br />

4<br />

Page 36<br />

F-1 FORM SF330 PART I


Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

• Reduce the number of variable-sized similar processes to thereby reduce the number and type of spare parts required in<br />

inventory, and standardize/simplify the maintenance requirements of process equipment.<br />

• Improve plant hydraulic performance and reliability.<br />

• Recommend technologies to continue to meet regulatory requirements.<br />

25. Firms from Section C Involved with this Project<br />

(1) Firm Name (2) Firm Location (City and State) (3) Role<br />

a <strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>. Miami, FL Prime<br />

Page 37<br />

F-2 FORM SF330 PART I


Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

P<br />

F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S<br />

QUALIFICATIONS FOR THIS CONTRACT<br />

20. Example Project Key Number<br />

(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)<br />

21. Title and Location (City and State) 22. Year Complete<br />

Professional Services Construction (if applicable)<br />

Continuing Water and Wastewater Consultant, Naples, Florida<br />

Ongoing<br />

23. Project Owner’s Information<br />

a. Project Owner b. Point of Contact Name c. Point of Contact Telephone Number<br />

City of Naples Mr. Bob Middleton, Public Works Director 239.213.4714<br />

24. Brief Description of Project and Relevance to this Contract (include scope, size, and cost)<br />

General Engineering Services: <strong>Tetra</strong> <strong>Tech</strong> has been providing the City continuing water and<br />

wastewater engineering consulting services, as well as continuing financial management services for<br />

over 15 years. Services provided have included:<br />

• Permitting<br />

• Water and wastewater system evaluations<br />

• Miscellaneous water main and wastewater collection system extensions<br />

• Presentations to City Council relative to the capital improvements program<br />

• Water and wastewater system operations<br />

• Master planning<br />

• Hydrogeological and water resources<br />

• Financial management as it relates to the water and wastewater facilities<br />

Major projects, completed or ongoing, under this continuing consultant contract have included:<br />

• A 20-year, city-wide potable water system master plan<br />

• A comprehensive (capital) development rates and charges study for the water and wastewater<br />

• A specific capacity and wire to water efficiency test analysis, and work relative to the South<br />

Florida Water Management District's Request for Additional Information (RAI) for the water use<br />

permit submitted by the City and the City's wellfield operation plan<br />

• A utility audit for the City’s potable water distribution system to document system water losses<br />

• A water treatment process evaluation to demonstrate compliance with FDEP chlorine contact<br />

(CT) regulations<br />

• Preliminary design for upgrading the City’s East Naples and Solana Road potable water storage and booster pumping facilities<br />

• Preparing specifications for the installation of an ASR test well for the City’s reclaimed water system<br />

• Design, permitting, bidding and construction management for the installation of two wells within the City’s East Golden Gate Wellfield.<br />

A detailed description of a stormwater project delivered under this contract is listed below.<br />

Stormwater Master Plan Update: The City contracted <strong>Tetra</strong> <strong>Tech</strong> to integrate and update the city’s stormwater program to reflect the past 20<br />

years of various stormwater master plans and reports. The master plan update emphasis was to focus the city-wide effort in the areas of water<br />

quality improvements (flood control), water quality improvements (and retrofit pollution treatment), and overall integration of regional<br />

management practices affecting Naples Bay. Significant environmental concerns were focused on Naples Bay since it was recently adopted as<br />

a South Florida Water Management District (SFWMD) SWIM water body. In addition, the report was to adjust the five- and ten-year financial<br />

expectations including a review of their existing stormwater utility. The scope of services included performing the following:<br />

• Revised basin delineation<br />

• Asset inventory recertification<br />

• Summary of tidal influences, localized water quantity (flooding)<br />

problems, water quality problems, and coastal floodplain liabilities<br />

• Reconciliation of level of service (LOS)<br />

• Summary of water quality sampling program<br />

• Assessments of existing condition of receiving water bodies, of<br />

future regulatory issues, and of financial issues and opportunities<br />

• Final recommendations for immediate action<br />

It was identified during the master plan update that there were approximately $60 million worth of improvements and studies that need to be<br />

funded over the next ten years. In addition, it was determined that the stormwater utility rate structure and policies were not adequate to<br />

properly fund the upcoming projects identified and adjustments to the utility would be necessary.<br />

5<br />

Project Highlights<br />

Disciplines covered include:<br />

- Water and Wastewater<br />

- Hydrogeology<br />

- Civil<br />

- Survey/GIS<br />

- Finance/Capital<br />

Planning Design<br />

25. Firms from Section C Involved with this Project<br />

(1) Firm Name (2) Firm Location (City and State) (3) Role<br />

a <strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>. Fort Myers, FL Prime<br />

Page 38<br />

F-1 FORM SF330 PART I


F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S<br />

QUALIFICATIONS FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

20. Example Project Key Number<br />

(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)<br />

21. Title and Location (City and State) 22. Year Complete<br />

Professional Services Construction (if applicable)<br />

Continuing Consultant, Deltona, Florida<br />

Ongoing<br />

23. Project Owner’s Information<br />

a. Project Owner b. Point of Contact Name c. Point of Contact Telephone Number<br />

City of Deltona George Travato 386.561.2100<br />

24. Brief Description of Project and Relevance to this Contract (include scope, size, and cost)<br />

Concept Elevation of the final RFP<br />

<strong>Tetra</strong> <strong>Tech</strong> has served as a Continuing Consultant for the City of Deltona since April of 2002. Our<br />

services have included support to several departments including Public Works, Public Utilities,<br />

Development Services, Parks and Recreation, and the Building and Fire Department. Our public<br />

works services included: CIP planning and budgeting; stormwater utility study and rate<br />

adjustment; stormwater retrofit projects; flood plain modeling and mapping; grant support;<br />

stormwater master plan update; mapping of various infrastructure; CEI services; and emergency<br />

management support during flooding. <strong>Tetra</strong> <strong>Tech</strong><br />

also coordinated and managed the City’s debris<br />

removal program follow the hurricanes in 2004.<br />

<strong>Tetra</strong> <strong>Tech</strong>’s support to public utilities involved:<br />

water and sewer master plans; design and permitting of water and sewer utility projects; rate<br />

studies; engineering services to relocate utilities for roadway projects; and water and waste<br />

water treatment plant improvement projects.<br />

<strong>Tetra</strong> <strong>Tech</strong>’s support to the Development services involved review of commercial industrial site<br />

plans; attending DRC meetings; conducting site inspections; preparing miscellaneous<br />

development review manuals and policies; and preparing GIS maps. <strong>Tetra</strong> <strong>Tech</strong> also supported<br />

the Building and Fire Departments with such activities as: engineering review of single lot<br />

residential site plans; miscellaneous engineering services for structural and MEP and site<br />

engineering design and permitting of fire stations.<br />

Our involvement with Parks and Recreation included: Engineering design and permitting of<br />

improvements at several parks; Grant Support; Design and permitting of several floating docks;<br />

and Support for seawall rehabilitation. As continuing consultants for the City of Deltona, we have<br />

designed and permitted numerous parks and recreation facilities.<br />

Dewey O. Boster Deltona Soccer and Football Complex (2003): Prepared the design/build<br />

documents necessary to act as the “design build professional” for a park expansion project that<br />

included three football fields and six soccer fields. <strong>Tetra</strong> <strong>Tech</strong> also participated in inspection and<br />

NPDES issues during construction.<br />

Keysville Dog Park (2005): Completed the design, permitting and construction administration<br />

for this project which provided a recreational facility for residents to bring their pets.<br />

Festival Park (2004 & 2006): Permitted the construction of the pavilion pier at this park. <strong>Tetra</strong> <strong>Tech</strong> designed a floating dock and restroom<br />

layout for this park project in accordance with a FRDAP grant. Only the pier pavilion portion of the project was constructed by the City.<br />

Lake Monroe Park (2007): Completed the design and permitting for new floating boat docks at this park under a State FRDAP grant. The<br />

project is currently under construction. <strong>Tetra</strong> <strong>Tech</strong> also completed analysis of structural repairs necessary for the existing boat ramp facility.<br />

Campbell Park (2005 & 2007): Prepared the design and permitting documents to add a tennis court, playground, hiking trail, two (2) floating<br />

docks, boardwalk, and overlook, for this park project, in accordance with a FRDAP grant. <strong>Tetra</strong> <strong>Tech</strong> will perform construction administration.<br />

Veterans Memorial Park/Evard Retrofit Retention Pond (2005 & 2007): Completed the design, permitting and construction administration<br />

for a stormwater management facility for future expansion of this park project along Evard Ave. Under a separate authorization, <strong>Tetra</strong> <strong>Tech</strong><br />

prepared the site plan layout for the Phase II expansion of the park and permitted those improvements through SJRWMD.<br />

Leford Regional Stormwater Treatment and Recreation Facility (2007): Applied for and received a $1.5M grant from the State to design<br />

and construct a demonstration/public education project to treat stormwater prior to discharge to a State Impaired Water. <strong>Tetra</strong> <strong>Tech</strong> is<br />

completing the design, and nearing the permitting phase including an educational center and parking, for this park project.<br />

Harris B. Saxon Park (2006): Prepared roadway re-alignment alternatives and retention pond modification alternatives for this park project.<br />

25. Firms from Section C Involved with this Project<br />

(1) Firm Name (2) Firm Location (City and State) (3) Role<br />

a <strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>. Orlando, FL Prime<br />

6<br />

Project Highlights<br />

Disciplines covered under this project;<br />

Water, Wastewater, Hydrogeology,<br />

Civil, Survey/GIS, Finance/Capital<br />

Planning Design.<br />

Page 39<br />

F-1 FORM SF330 PART I


Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

P<br />

F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S<br />

QUALIFICATIONS FOR THIS CONTRACT<br />

20. Example Project Key Number<br />

(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)<br />

21. Title and Location (City and State) 22. Year Complete<br />

Professional Services Construction (if applicable)<br />

Continuing Miscellaneous Engineering, Cape Coral, Florida<br />

Ongoing<br />

23. Project Owner’s Information<br />

a. Project Owner b. Point of Contact Name c. Point of Contact Telephone Number<br />

City of Cape Coral Jody Sorrels, PE 239.242.3227<br />

24. Brief Description of Project and Relevance to this Contract (include scope, size, and cost)<br />

General Engineering Services: <strong>Tetra</strong> <strong>Tech</strong> has provided continuing miscellaneous<br />

professional engineering services to the City of Cape Coral for a variety of utility<br />

related projects since 2000, and prior to that for preparation of the City’s Annual<br />

Reports as required for compliance with their Utility Bond covenants. Specific<br />

projects have included lift station refurbishment design, water and wastewater<br />

treatment plant modifications, utility infrastructure improvements and other<br />

miscellaneous engineering services as needed, and have included the following<br />

services:<br />

• Permitting related services for the City’s water and wastewater facilities<br />

(including preparation of Capacity Analysis Reports and permit renewals).<br />

• Water main, wastewater collection and force main system upgrades and<br />

replacements.<br />

• Lift Station conversions (dry pit to wet pit) and rehabilitation.<br />

• Evaluations and inspections of the existing utility systems.<br />

• Water Treatment Plant improvements (degasification upgrades, chemical storage expansion).<br />

• Water and Wastewater system evaluations (smoke testing, water audits,<br />

leak detection, meter testing).<br />

• Hydrogeological services for monitoring wells and concentrate<br />

discharge.<br />

• Irrigation system improvements (weir installation and piping for canal<br />

interconnections).<br />

• Preparation of Annual Reports and Engineering Report for Utility<br />

Bonds.<br />

• Security Improvements associated with Water Treatment and<br />

distribution systems.<br />

• Upgrades to instrumentation and controls at Water Treatment Plant and remote storage sites.<br />

• Building Improvements/additions associated with WTP, other Utility Buildings<br />

Some of the major projects completed include but are not limited to the following:<br />

Project Highlights<br />

The following disciplines covered under<br />

this project:<br />

- Water<br />

- Wastewater<br />

- Hydrogeology<br />

- Civil<br />

- Finance/Capital Planning Design<br />

• Lift Station Upgrades: <strong>Tetra</strong> <strong>Tech</strong> has provided the design, permitting, bidding and construction management for nearly 15<br />

lift station upgrades for the City. The upgrades have included conversion from dry pit to wet pit, wet well rehabilitation,<br />

pump and electrical upgrades and pipe replacement through the valve vault<br />

• Annual Report Preparation for Utility Bonds – <strong>Tetra</strong> <strong>Tech</strong> has been preparing the Annual Reports for the City’s Utility<br />

Bonds since 1994<br />

• Galvanized Pipe Replacement – <strong>Tetra</strong> <strong>Tech</strong> has performed design and permitting for the replacement of nearly 40,000 linear<br />

feet of aging 2-inch galvanized pipe with new 6-inch PVC pipe within a congested residential area in Southeast Cape Coral<br />

7<br />

25. Firms from Section C Involved with this Project<br />

(1) Firm Name (2) Firm Location (City and State) (3) Role<br />

a <strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>. Fort Myers, FL Prime<br />

Page 40<br />

F-1 FORM SF330 PART I


F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S<br />

QUALIFICATIONS FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

20. Example Project Key Number<br />

(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)<br />

21. Title and Location (City and State) 22. Year Complete<br />

Professional Services Construction (if applicable)<br />

Continuing Engineering Services, James E. Anderson 22.5 MGD Reverse<br />

Osmosis Water Treatment Plant, Port St. Lucie, Florida<br />

2008 2008<br />

23. Project Owner’s Information<br />

a. Project Owner b. Point of Contact Name c. Point of Contact Telephone Number<br />

City of Port St. Lucie, FL Mr. Brad Macek 772.873.6400<br />

24. Brief Description of Project and Relevance to this Contract (include scope, size, and cost)<br />

8<br />

P<br />

General Engineering Services: The City of Port St.<br />

Lucie, located on the Atlantic Seaboard in Saint<br />

Lucie County, Florida, is a community that has<br />

grown from approximately 10,000 residents to the<br />

current 135,000 residents in less than 20 years.<br />

During that period, the City’s Utility Systems<br />

Department was tasked with providing and<br />

maintaining a public wastewater collection and water<br />

distribution system to serve these residents.<br />

In 2000, <strong>Tetra</strong> <strong>Tech</strong> was selected by the City to<br />

design and oversee construction of a state of the art<br />

Reverse Osmosis (RO) water treatment plant. The<br />

water facility was to have an initial capacity of 6.0<br />

million gallons per day (mgd) and the ability to<br />

readily expand to a capacity of 20.0 mgd. <strong>Tetra</strong> <strong>Tech</strong><br />

provided a facility design for the initial capacity on a<br />

green-field site allowing for phased construction and<br />

start-up of the proposed facilities to meet the City’s<br />

rigorous schedule for additional capacity. In 2005, the City authorized <strong>Tetra</strong> <strong>Tech</strong> to begin design for the facility expansion to a<br />

total capacity of 22.5 mgd.<br />

The raw water supply facilities consist of ten offsite wells with<br />

remote telemetry and auxiliary power, one onsite supply well,<br />

one onsite blend well, and two raw water mains. The RO<br />

treatment facilities consist of ten RO skids that are 2.0 mgd each<br />

and divided into two separate trains for operational redundancy.<br />

Each train includes chemical pretreatment via sulfuric acid and<br />

scale inhibitor, followed by physical pretreatment via micron<br />

filters. The RO treatment skids are fed by dedicated high pressure<br />

pumps and feature interstate boost via energy recovery turbines.<br />

The post treatment processes include raw water blending,<br />

fluoridation, degasification, disinfection, and stabilization. The<br />

by-product or concentrate from the RO process is disposed of via<br />

an onsite deep injection well.<br />

Other project features include a main laboratory facility, storage<br />

and pumping facilities for the deep injection well, odor control<br />

scrubbers to remove hydrogen sulfide from the degasifier exhaust air, and auxiliary power generator facilities.<br />

This project has been fully operational since August 2008.<br />

Project Highlights<br />

• Water Treatment Plant in the State of Florida<br />

• Treatment Process <strong>Inc</strong>ludes Removal of Hydrogen<br />

Sulfide from Groundwater with Degasification<br />

• Capacity of 22.5 MGD<br />

• Construction Cost of $48M<br />

• The following disciplines are covered under this<br />

project:<br />

- Water<br />

- Wastewater<br />

- Hydrogeology<br />

- Civil<br />

- Survey/GIS<br />

- Finance/Capital Planning Design<br />

25. Firms from Section C Involved with this Project<br />

(1) Firm Name (2) Firm Location (City and State) (3) Role<br />

a <strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>. Orlando, FL Prime<br />

Page 41<br />

F-1 FORM SF330 PART I


F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S<br />

QUALIFICATIONS FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

20. Example Project Key Number<br />

(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)<br />

21. Title and Location (City and State) 22. Year Complete<br />

Professional Services Construction (if applicable)<br />

Toho Water Authority Pump Station No. 60 and 97 improvements, Kissimmee,<br />

Florida<br />

2010 (completed)<br />

23. Project Owner’s Information<br />

a. Project Owner b. Point of Contact Name c. Point of Contact Telephone Number<br />

Toho Water Authority Ms. Deb Beatty, P.E. 407.944.5023<br />

24. Brief Description of Project and Relevance to this Contract (include scope, size, and cost)<br />

General Engineering Services: In 2008, the Tohopekaliga Water Authority (TWA)<br />

retained <strong>Tetra</strong> <strong>Tech</strong> to evaluate the condition of Pump Stations Nos. 60 and 97, and to<br />

identify appropriate improvements to address projected flows and reliability issues.<br />

Subsequently, TWA authorized <strong>Tetra</strong> <strong>Tech</strong> to provide final design, permitting, bidding,<br />

and construction phase services related to the recommended improvements.<br />

In general, the improvements to Pump Station No. 60 included structural rehabilitation<br />

of the wet well, installation of three (3) new 20 HP submersible pumps, replacement of<br />

the discharge piping, installation of a biofiltration odor control system, new controls,<br />

and a standby power system. Improvements to Pump Station No. 97 included<br />

rehabilitation of two (2) existing circular wet wells, installation of three (3) new 90 HP<br />

submersible pumps, replacement of the discharge piping, a magnetic flow meter,<br />

Project Highlights<br />

• Disciplines under this project:<br />

- Wastewater<br />

- Hydrogeology<br />

- Civil<br />

- Survey/GIS<br />

- Finance/Capital Planning<br />

Design<br />

• Project Value: $889,798<br />

installation of a biofiltration odor control system, new controls, and a standby power system. Both pump stations handle<br />

significant flows and are located on fairly small sites which presented some challenges with respect to equipment layout and<br />

maintenance of service during construction. Accordingly, the contract documents included detailed bypass pumping<br />

requirements, limitations on noise emissions during construction, and stringent requirements with respect to reliability of the<br />

bypass pumping systems. The project was constructed over a 6-month period without any overflows, interruptions in service, or<br />

claims for additional compensation or contract time.<br />

9<br />

25. Firms from Section C Involved with this Project<br />

(1) Firm Name (2) Firm Location (City and State) (3) Role<br />

a <strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>. Miami, FL Prime<br />

Page 42<br />

F-1 FORM SF330 PART I


Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

P<br />

F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S<br />

QUALIFICATIONS FOR THIS CONTRACT<br />

20. Example Project Key Number<br />

(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)<br />

21. Title and Location (City and State) 22. Year Complete<br />

Professional Services Construction (if applicable)<br />

Continuing Engineering Services, City of Miami Beach Normandy Isles<br />

Streetscape and Infrastructure Improvements, Miami Beach, Florida<br />

2007-Current<br />

23. Project Owner’s Information<br />

a. Project Owner b. Point of Contact Name c. Point of Contact Telephone Number<br />

City of Miami Beach Mr. Richard Saltrick 306.673.7071<br />

24. Brief Description of Project and Relevance to this Contract (include scope, size, and cost)<br />

General Engineering Services:<br />

As Design Engineer, <strong>Tetra</strong> <strong>Tech</strong><br />

coordinated all design and permitting<br />

efforts for this major neighborhood<br />

improvement project. <strong>Tetra</strong> <strong>Tech</strong><br />

developed the Basis of Design documents<br />

by conducting extensive public meetings<br />

and conferences with the owner, the City<br />

of Miami Beach. Five hundred pages of<br />

plans were required for the complete<br />

design to convey the scope required.<br />

Twelve permits from various Miami<br />

Dade agencies were obtained; each<br />

requiring an agency specific set of plans.<br />

<strong>Tetra</strong> <strong>Tech</strong> also provided construction<br />

services under a contract with the City’s<br />

Program Manager.<br />

Project Scope included the following:<br />

• Targeted Sidewalk Replacement and<br />

In Fill – 4,100 SY of sidewalk was<br />

constructed including new, replacement, and in fill.<br />

• Street-End Improvements – Existing practically unused street ends that<br />

terminate were converted into parks and recreation areas.<br />

• Textured Pavement Improvements – Neighborhoods are differentiated<br />

from the FDOT roads by using crosswalks constructed with brick pavers<br />

and textured pavement of contrasting color.<br />

• Roadway Resurfacing – 38,000 SY of asphalt pavement was milled and<br />

resurfaced which is nearly 10 lane miles of roadway throughout the<br />

island. All of the existing painted pavement markings were replaced with<br />

markings of thermoplastic material and 100 roadside signs were removed,<br />

relocated, or replaced.<br />

Project Highlights<br />

• Landscaping – 315 of the existing trees were relocated to enhance the appearance of the right of way and 750 new trees of<br />

native species were planted as well. 90,000 SY of sod was installed.<br />

• Irrigation – 15,000 LF of irrigation pipe and 10,000 sprinkler heads were constructed to provide positive watering for the<br />

new and existing trees and the new sod.<br />

• Water Main Replacement – 30,000 LF of 6”, 8”, and 12” water main was included as well as the required fittings and<br />

valves.<br />

• Rear Easement Water Service Relocation – This included replacement services and new water meters for 480 homes<br />

throughout the island.<br />

• Lighting Enhancements – 170 new light poles and fixtures are installed in two neighborhoods. There are 150 “acorn”<br />

architectural poles and luminaires and 20 traditional light poles installed to enhance neighborhood ambience and safety.<br />

30,000 LF of underground conduit and conductor were required to complete the installation. Project Value - $10,000,000.<br />

10<br />

The following disciples are covered under<br />

this project:<br />

- Wastewater<br />

- Civil<br />

- Finance/Capital Planning Design<br />

25. Firms from Section C Involved with this Project<br />

(1) Firm Name (2) Firm Location (City and State) (3) Role<br />

a <strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>. Miami, FL Prime<br />

Page 43<br />

F-1 FORM SF330 PART I


26. Names of Key Personnel<br />

(From Section E, Block 12)<br />

Kenneth L. Caban, PE, BCEE, LEED<br />

AP<br />

G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS<br />

27. Role in this Contract<br />

(From Section E, Block 13)<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

28. Example Projects Listed in Section F (Fill in “Example Projects Key”<br />

section below before completing table. Place “X” under project key<br />

number for participation in same or similar role.)<br />

1 2 3 4 5 6 7 8 9 10<br />

Project Manager X X X X X<br />

James E. Christopher, PE, BCEE Project Engineer (Water) X X X X X X<br />

Jarrett K. Kinslow, PE Project Engineer (Water) X X X X<br />

Jill M. Hudkins, PE Project Engineer (Water) X X X X X<br />

Jon Fox, PE Project Engineer (Wastewater) X X X X X X X X X X<br />

John P. Toomey, PE Project Engineer (Wastewater) X X X X X X X<br />

Matthew A. Doan, PE Project Engineer (Wastewater) X X X X X X<br />

Charles W. Drake, PG Hydrogeologist X X X X X<br />

Miguel A. Garcia, PG Hydrogeologist X X X X<br />

W. Bruce Lafrenz, PG Hydrogeologist X X X X X<br />

William D. Musser, PE, LEED AP Project Engineer (Civil) X X X X X X<br />

Roderick K. Cashe, PE, LEED AP Project Engineer (Civil) X X X X X X<br />

James R. Warner, PE Project Engineer (Civil) X X X X X<br />

Lawrence E. Jenkins, PSM Survey / GIS X X X X<br />

Betty A. Morris Survey / GIS X X<br />

Felix W. Yao, PE<br />

Electrical Engineer<br />

(Electrical/Instrumentation)<br />

X<br />

William A. Paison, PE, LEED AP<br />

Electrical Engineer<br />

(Electrical/Instrumentation)<br />

X<br />

Andrew T. Woodcock, PE, MBA Finance/Capital Planning X X X X<br />

X<br />

X<br />

Jennifer L. Woodall, PE, MBA Finance/Capital Planning X X X X X<br />

29. Example Projects Key<br />

No. Title of Example Project (From Section F) No. Title of Example Project (From Section F)<br />

1 Continuing Engineering Services, North Miami Beach, Florida 6 Continuing Consultant, Deltona, Florida<br />

2 Continuing Engineering Services, Hollywood, Florida 7 Continuing Miscellaneous Engineering, Cape Coral, Florida<br />

3 Continuing Engineering Services, Key Biscayne, Florida 8<br />

4<br />

Continuing Engineering Services, Alexander Orr Water<br />

Treatment Plant and South Miami-Dade Water Supply Systems,<br />

Miami, Florida<br />

5 Continuing Water and Wastewater Consultant, Naples, Florida 10<br />

9<br />

Continuing Engineering Services, James E. Anderson 22.5 MGD<br />

Reverse Osmosis Water Treatment Plant, Port St. Lucie, Florida<br />

Toho Water Authority Pump Station No. 60 and 97<br />

improvements, Kissimmee, Florida<br />

Continuing Engineering Services, City of Miami Beach Normandy<br />

Isles Streetscape and Infrastructure Improvements, Miami<br />

Beach, Florida<br />

SOLICITATION NO. 2012-10 G-1 Form SF330 Part II<br />

Page 44


Page 45


Water<br />

Page 46


Norwood-Oeffler Water Treatment Plant<br />

Expansion Program to 32.0 MGD<br />

North Miami Beach, Florida<br />

The City of North Miami Beach's existing water treatment plant included approximately<br />

15.0 million gallons per day (MGD) of lime softening water treatment facilities located<br />

at the Norwood-Oeffler Water Treatment Plant (WTP). In June 2001 <strong>Tetra</strong> <strong>Tech</strong> was<br />

retained to perform preliminary design, final design, permitting, and construction<br />

services to expand plant capacity to treat a total of 32.0 MGD with nanofiltration and<br />

low pressure reverse osmosis technologies. The expanded facility consists of 15.0 MGD<br />

from existing lime softening facilities, 9.0 MGD for new nanofiltration facilities, 6.0<br />

MGD from new low pressure reverse osmosis facilities, and 2.0 MGD of micron filtered<br />

raw water blend. The existing facilities were also expanded and improved.<br />

Improvements to the WTP included:<br />

• 5-new Biscayne aquifer wells and 4-new Floridian aquifer wells<br />

• 1-deep injection well for concentrate disposal<br />

• Bulk chemical facilities<br />

• High-pressure feed pumps with variable frequency drives<br />

• Energy Recovery Devices<br />

• 9.0 MGD of nanofiltration and 6.0 MGD of LPRO membrane treatment facilities<br />

• Degasification and odor control facilities<br />

• New operations and process buildings<br />

• Associated yard piping, site work, paving, drainage and grading<br />

• Electrical and instrumentation facilities<br />

• 2-new ground storage tanks and new high service pumping facilities<br />

• Gravity sludge thickening facilities<br />

• Security System<br />

Project Highlights:<br />

• Integration of<br />

membrane treatment<br />

technology at an<br />

existing facility to<br />

provide better finished<br />

water quality and an<br />

additional 15 MGD of<br />

capacity<br />

• Project <strong>Inc</strong>luded<br />

alternative water supply<br />

funding from the<br />

SFWMD<br />

Project Value:<br />

$65,000,000<br />

Project Duration:<br />

2001-2009<br />

Project Staff:<br />

James Christopher, PE<br />

Project Manager<br />

Jon Fox, PE<br />

Assistant Project Manager<br />

Jill Hudkins, PE<br />

Assistant Project Manager<br />

Jarrett Kinslow, PE<br />

Project Engineer<br />

Reference:<br />

City of North Miami Beach<br />

17050 N.E. 19th Avenue<br />

North Miami Beach, FL<br />

33162<br />

Dr. Jeff An<br />

305.948.2967<br />

Construction administration services were also provided for this project, including<br />

bidding services and construction management. Upon completion of the project, <strong>Tetra</strong><br />

<strong>Tech</strong> prepared record drawings and certified the project complete to the Florida<br />

Department of Health and Miami-Dade DERM.<br />

Page 47


Watermain Replacement Program<br />

Hollywood, Florida<br />

Project Value:<br />

$2,800,000.00<br />

Project Completion:<br />

2011<br />

Reference:<br />

City of Hollywood<br />

1621 N. 14th Avenue<br />

Hollywood, FL 33019<br />

Francois Domond, PE<br />

954.921.3930<br />

<strong>Tetra</strong> <strong>Tech</strong> is providing design and permitting services for The City of Hollywood (City)<br />

ongoing water main replacement program. The area from Hollywood Boulevard to<br />

Johnson Street between N. 46th Avenue and N. 52nd Avenue was the first area<br />

identified. The water main improvements consist of approximately 26,000 feet of 4-inch,<br />

6-inch, 8-inch, and 12-inch PVC water main along local City streets and paved alleys<br />

sharing the right-of-way with other existing utilities such as power, telephone, cable, gas<br />

and force main. These improvements involve upgrading 2-inch, 4-inch, and 6-inch<br />

water mains one nominal size and replacing 8-inch and 12-inch water mains with the<br />

same nominal size. The existing utilities will be replaced new PVC water mains,<br />

isolation valves, fire hydrants, and water services. Water meter and boxes will remain.<br />

Page 48


Alexander Orr Water Treatment Plant<br />

Task Authorization No. 11 – Process<br />

Optimization Study<br />

Miami, Florida<br />

Project Highlights:<br />

• Provides renewal,<br />

improvement, and<br />

optimization for the<br />

majority of the<br />

MDWASD system<br />

• <strong>Inc</strong>ludes upgrading<br />

one of the largest<br />

and oldest lime<br />

softening treatment<br />

plants in the<br />

southeast United<br />

States<br />

• Develops a<br />

prioritization<br />

schedule of the<br />

identified facility<br />

needs for the Orr<br />

WTP<br />

Project Value:<br />

$200,000<br />

Project Duration:<br />

On-going<br />

<strong>Tetra</strong> <strong>Tech</strong>, as a subconsultant, is assisting the Miami-Dade Water and Sewer<br />

Department (MDWASD) with the renewal, improvement, and process optimization of<br />

the South Dade water system, including its largest water treatment plant. The Alexander<br />

Orr, Jr. Water Treatment Plant (Orr WTP) is one of the largest water treatment plants in<br />

the southeastern United States. The Orr WTP treats Biscayne Aquifer water with lime<br />

softening, filtration, and disinfection.<br />

The Alexander Orr, Jr. Water Treatment Plant (Orr WTP) uses the conventional lime<br />

softening process to soften the hard water withdrawn from the Biscayne Aquifer to<br />

produce drinking water for MDWASD customers. To soften the water, the raw water pH<br />

is increased by adding calcium oxide to precipitate calcium carbonate and reduce the<br />

hardness of the water sent to the consumer. Unfortunately, the pH of the water of the<br />

softened water is too high, so it must be reduced to a level that prevents further calcium<br />

carbonate precipitation and is acceptable to the consumer.<br />

This study will evaluate alternatives to improve the efficiency of the lime softening and<br />

stabilization processes with the intent of reducing operational costs for the facility.<br />

Process optimization alternatives that can be implemented at the plant to reduce<br />

operating costs will be identified.<br />

Specific recommendations for modifications and additions to the existing treatment<br />

processes will be developed to improve treatment plant performance, reduce operating<br />

costs and provide a consistent finished water quality meeting the treatment goals. The<br />

scope of the study includes the following:<br />

Project Staff:<br />

Ken Caban, PE<br />

Project Manager<br />

James Christopher, PE<br />

Project Engineer<br />

Stephen Glatthorn, PE<br />

Project Engineer<br />

Reference:<br />

Miami-Dade Water and<br />

Sewer Department<br />

3071 SW 38 Avenue<br />

Suite 515<br />

Miami, Fl 33146<br />

Mr. Rafael A. Terrero,<br />

PE, BCEE<br />

786.552.8112<br />

Terrero@miamidade.gov<br />

Page 49


Alexander Orr Water Treatment Plant<br />

Task Authorization No. 11 – Process<br />

Optimization Study<br />

Miami, Florida<br />

• Performance of phased bench scale testing and evaluations (lime softening, enhanced lime softening and<br />

stabilization) to determine chemical feed rates to produce optimum hardness, color and DBP precursor<br />

removals; raw water characterization and analysis.<br />

• Establishment of water quality goals, review of operational protocols; theoretical estimation of chemicals<br />

required to achieve various levels of hardness control; analysis of the effect of optimizing the lime softening<br />

and stabilization processes upon chlorine usage for disinfection and the formation of disinfection byproducts;<br />

and review of power and chemical usage/costs.<br />

• Determine if increasing the level of automation of the treatment process can improve plant performance and<br />

consistency of treatment, optimize the feeding of chemicals, and provide operators a greater degree of control of<br />

the treatment process.<br />

• Identification of cost savings that can be potentially realized by the optimization of the existing lime softening<br />

and stabilization processes. The disinfection/DBP control evaluations consist of chlorine demand/decay and<br />

trihalomethane/halo acetic acid formation potential investigations for chlorine demand and decay, as well as<br />

trihalomethane and halo acetic acid formation potential.<br />

Five alternative recommendations for optimizing the lime softening and stabilization processes are provided in order<br />

to improve treatment performance and reduce operation and maintenance costs.<br />

Page 50


Water System Master Planning,<br />

Mapping, and Modeling<br />

Bartow, Florida<br />

Relevant Project Highlights<br />

for Crestview:<br />

• 13 Years of Water Master<br />

Planning Services to this<br />

Client<br />

• 10-year Water Master<br />

Plan<br />

• Evaluated Permitting<br />

Requirements with FDEP<br />

and Water Mgmt District<br />

• Provided Hydraulic Model<br />

Training to City Staff<br />

The City of Bartow has an extensive water system. The City's water service area<br />

encompasses the entire incorporated City limits of the City of Bartow and areas of<br />

unincorporated Polk County. The City’s system is served by two well systems with<br />

permitted capacity of 7.0 MGD. The combined system storage is 2.6 MG. The City has<br />

seen consistent growth from just over 15,025 residents in 1996 to over 16,043 in 2005.<br />

It is anticipated that the City will continue to see steady growth during the next 10 years.<br />

<strong>Tetra</strong> <strong>Tech</strong> was contracted by the City to conduct an original Master Plan in 1996, and<br />

provided updates in 2007 and 2008. The master planning effort included gathering<br />

existing data, verifying existing as-built and water atlas data, creating and updating the<br />

hydraulic model in WaterCAD, master planning, CIP development, and funding<br />

review. The master plan includes permitting requirements for improvements to the<br />

water system. <strong>Tetra</strong> <strong>Tech</strong> has served the City since 1996 for master planning services.<br />

The City did not have an existing map or hydraulic model in 1996 depicting the existing<br />

potable water system, therefore the initial phase of the master planning efforts consisted<br />

of developing a comprehensive water system map by utilizing existing as-built<br />

engineering drawings, maps, water system atlases, and record drawings. Additionally, in<br />

the initial phase of the project, <strong>Tetra</strong> <strong>Tech</strong> conducted an evaluation of the hydraulic<br />

modeling software currently commercially available and made a recommendation of the<br />

type of software for the City to purchase. The software recommendation was for the use<br />

of WaterCAD and was tailored to fit the unique needs of the City water system for<br />

today and future.<br />

The master planning phase of the project included evaluation of system water demand<br />

and growth, population projections, bulk water sales agreements, local system<br />

interconnections, future planning and zoning, treatment facility capacity and reliability<br />

including current and future permitting constraints, hydraulic analysis, hydraulic model<br />

training, and a capital improvement program. The capital improvement program<br />

consists of capital improvement identification, cost estimation, environmental permitting<br />

identification, a capital improvement alternative analysis based on economic and noneconomic<br />

criteria, and an implementation plan and schedule. Capital improvements<br />

anticipated include improvements to the water supply, treatment, storage and distribution<br />

systems. <strong>Tetra</strong> <strong>Tech</strong> has already provided one additional update in 2008 to include the<br />

analysis of adding the Clear Springs Development to the City of Bartow's service area.<br />

• WaterCAD Hydraulic<br />

Model <strong>Inc</strong>luded:<br />

- 4-24 inch (range of pipe<br />

diameters)<br />

- 198.4 miles<br />

- 1,451 pipes<br />

- 1,129 nodes<br />

- Two Wellfields<br />

• Master Plan Report<br />

Prepared<br />

Crestview Team Members<br />

Responsible for Work:<br />

Jon Fox, PE<br />

Alex Montalvo<br />

Client Reference:<br />

City of Bartow, Florida<br />

Mr. Ron Johnson<br />

863.534.0159<br />

Completion Date:<br />

June 2008<br />

Type and Size of Modeling:<br />

Water System: 198.4 miles of<br />

Water Main (4-24 inch), 1,451<br />

pipes, 1,129 nodes<br />

Page 51


Wastewater<br />

Page 52


Pump Station Conversion Project<br />

Hollywood, Florida<br />

Project Highlights:<br />

• Conversion of five wet<br />

pit/dry pit pump stations<br />

to submersible type<br />

pump station<br />

Construction Value:<br />

$1,665,010<br />

Project Duration:<br />

2005-2006<br />

Project Staff:<br />

<strong>Tetra</strong> <strong>Tech</strong> provided design, permitting and construction administration services for the<br />

conversion of five wet pit / dry pit pump stations in the City of Hollywood to<br />

submersible pump stations ranging in size from 0.5 MGD to 2.5 MGD. Construction<br />

permits were obtained for the improvements to each pump station from the Broward<br />

County Department of Planning and Environmental Protection. Upgrades were<br />

completed at stations A-4 on N 64 th Avenue, N-1 on 4080 N. Hills Drive, N-5 on N. 34 th<br />

Avenue, N-7 on Green Street and W-20 on N 50 th Avenue. At each location, upgrades<br />

included new submersible pumps, electric services, control panels and level sensors.<br />

Special project considerations included limitations on noise levels within residential<br />

areas and lift station by-pass procedures to ensure continuous operation at each existing<br />

pump station. <strong>Tetra</strong> <strong>Tech</strong> performed weekly project site visits during the 15 month<br />

construction period to verify that the work was proceeding in accordance with the design<br />

documents.<br />

Jennifer Woodall, PE, MBA<br />

Project Manager<br />

Alicia Verea-Feria<br />

Project Engineer<br />

Reference:<br />

City of Hollywood<br />

1621 N. 14 th Avenue<br />

Hollywood, FL 33020<br />

Francois A. Domond, PE<br />

City of Hollywood<br />

954.921.3930<br />

Page 53


Pump Station No. 60 and 97 Improvements<br />

Kissimmee, Florida<br />

Project Value:<br />

$889,798<br />

Project Duration:<br />

2010 (Project Completed)<br />

Reference:<br />

Toho Water Authority<br />

951 Martin Luther King Jr.<br />

Blvd. Kissimmee, FL 34741<br />

Ms. Deb Beatty, P.E.<br />

407.944.5023<br />

In 2008 the Tohopekaliga Water Authority (TWA) retained <strong>Tetra</strong> <strong>Tech</strong> to evaluate the<br />

condition of Pump Station No. 60 and 97, and to identify appropriate improvements to<br />

address projected flows and reliability issues. Subsequently, TWA authorized <strong>Tetra</strong> <strong>Tech</strong><br />

to provide full design, permitting, bidding, and construction phase services related to the<br />

recommended improvements.<br />

In general, the improvements to Pump Station No. 60 included structural rehabilitation<br />

of the wet well, installation of three (3) new 20 HP submersible pumps, replacement of<br />

the discharge piping, installation of a biofiltration odor control system, new controls, and<br />

a standby power system. Improvements to Pump Station No. 97 included rehabilitation<br />

of two (2) existing circular wet wells, installation of three (3) new 90 HP submersible<br />

pumps, replacement of the discharge piping, a magnetic flow meter, installation of a<br />

biofiltration odor control system, new controls, and a standby power system. Both pump<br />

stations handle significant flows and are located on fairly small sites which presented<br />

some challenges with respect to equipment layout and maintenance of service during<br />

construction. Accordingly, the contract documents included detailed bypass pumping<br />

requirements, limitations on noise emissions during construction, and stringent<br />

requirements with respect to reliability of the bypass pumping systems. The project was<br />

constructed over a 6-month period without any overflows, interruptions in service, or<br />

claims for additional compensation or contract time.<br />

Page 54


Lift Station 104, 306 and 420 Improvements<br />

Cape Coral, Florida<br />

The City of Cape Coral, Florida capital<br />

improvements program includes the periodic<br />

upgrade of older, deteriorating lift stations. <strong>Tetra</strong><br />

<strong>Tech</strong> provided design, permitting bidding and<br />

construction management for the following:<br />

1. Lift Station No. 104. This lift station was an<br />

approximately 30-year old brick wet well/dry well<br />

station that the City wished to convert to a<br />

submersible (wet well) station. The condition of the<br />

lift station was poor, and exhibited the effects of<br />

high hydrogen sulfide (H2S) corrosion. The<br />

improvements at this station included the conversion<br />

of the existing wet well for installation of new<br />

submersible pumps, panel, installation of new<br />

HDPE piping, valving and bypass provisions,<br />

rehabilitation of the existing wet well through installation of a liner or coating system,<br />

installation of new controls and installation of guardrails to protect the above-ground<br />

improvements.<br />

2. Lift Station No. 306. This lift station is also an approximately 30-year old wet<br />

well/dry well station that the City wished to convert to a submersible (wet well) station.<br />

This station was constructed of concrete with the condition due to H2S corrosion similar<br />

to lift station No. 104. The work involved at this station included conversion of the<br />

existing wet well for installation of new submersible pumps, panel, installation of new<br />

HDPE piping, valving and bypass provisions, rehabilitation of the existing wet well<br />

through installation of a liner or coating system, installation of new controls and<br />

installation of guardrails to protect the above-ground improvements.<br />

3. Lift Station No. 420. This lift station was a packaged type wet well/dry well station,<br />

which was sized to handle a much greater flow than what it has historically seen.<br />

Currently the lift station is utilized solely to serve an adjacent school and has significant<br />

H2S damage. All other flow which previously entered this station has been rerouted to<br />

other collection systems. <strong>Tetra</strong> <strong>Tech</strong> analyzed the flows from the school during the peak<br />

periods of the school year, while considering the limited summer flow and designed a<br />

new smaller lift station to serve the current system needs of the school. This conversion<br />

also included rerouting of existing gravity lines into the new station and replacement and<br />

rerouting of an existing force main to a closer discharge point.<br />

Project Highlights:<br />

• Conversion of the<br />

existing wet well for<br />

installation of new<br />

submersible pumps<br />

• Rehabilitation of the<br />

existing wet well<br />

through installation of a<br />

liner or coating system<br />

Project Value:<br />

$49,050 (Project Fee)<br />

Project Duration:<br />

2006 (Project Completed)<br />

Project Staff:<br />

Daniel Nelson, PE<br />

Project Engineer<br />

Reference:<br />

City of Cape Coral<br />

P.O. Box 150097<br />

Cape Coral, FL 33915-0027<br />

Mr. Jody Sorrels, PE<br />

Utilities Manager<br />

239.242.3227<br />

Page 55


Westside Reclaimed Water and Wastewater<br />

Transmission Mains<br />

Kissimmee, Florida<br />

Project Highlights:<br />

• Alternative Water<br />

Supply Funding<br />

$1,557,117<br />

• Directional Drilling<br />

Water and Force Mains<br />

in parallel<br />

• Easement Acquisition<br />

Project Value:<br />

$6,200,000<br />

Project Completion:<br />

2007<br />

The Westside Wastewater and Reuse Transmission Mains project consisted of 10,240<br />

linear feet of combination 20- and 24-inch diameter ductile iron (DI) wastewater force<br />

main; 18,300 linear feet of 24-inch DI reuse water main. The wastewater force and reuse<br />

mains were constructed in parallel. Multiple segments were installed by means of<br />

directional drill in parallel for crossing of jurisdictional wetlands and water bodies.<br />

Crossings of the wetland areas via directional drill resulted in no impacts not requiring<br />

formal environmental resource permitting.<br />

<strong>Tetra</strong> <strong>Tech</strong> performed services such as applying for alternative water supply funding,<br />

route selection, surveying, easement sketch of descriptions and coordination of<br />

easements with property owners, final design document preparation including<br />

construction drawings and technical specifications, permitting and construction<br />

administration.<br />

The Westside Project was crucial to expand Tohopekaliga Water Authority’s (TWA’s)<br />

Wastewater and reuse systems to serve a proposed development, Westside Development.<br />

Therefore <strong>Tetra</strong> <strong>Tech</strong> pursued and obtained Alternative Water Supply Funding grant in<br />

the amount of $1,557,117.00 for TWA to apply towards the cost of construction. <strong>Tetra</strong><br />

<strong>Tech</strong> was able to meet all requirements for the funding deadlines as well as to expedite<br />

the project to assure that the development would have wastewater and reuse service prior<br />

to completion of construction of the Westside Development.<br />

<strong>Tetra</strong> <strong>Tech</strong> obtained permits from Osceola County for right-of-way utilization, Florida<br />

Department of Environmental Protection for construction of wastewater and reuse<br />

transmission mains, Florida Department of Transportation (FDOT) for construction<br />

under State Road 429, as well as environmental resource permitting through FDEP.<br />

Environmental resource permitting was limited to preparation of an ecological report<br />

with FDEP coordination to demonstrate diminus impacts not requiring wetland.<br />

The project was designed to incorporate horizontal directional drills to alleviate impacts<br />

to wetland areas and crossing of Davenport Creek, therefore no wetland mitigations<br />

were required. The horizontal directional drills were installed in parallel with separator<br />

as required by the FDEP.<br />

Project Staff:<br />

Jon Fox, PE<br />

Project Manager<br />

Lauren Springer, PE<br />

Project Engineer<br />

Reference:<br />

Tohopekaliga Water<br />

Authority<br />

Toho Water Authority<br />

951 Martin Luther King Jr.<br />

Blvd. 3 rd Floor Kissimmee,<br />

FL 34741<br />

Ms. Deb Beatty, PE<br />

407.944.5023<br />

Page 56


Hydrogeology<br />

Page 57


Concentrate Disposal Test/Injection Well and<br />

Monitoring Wells<br />

North Miami Beach, Florida<br />

Project Highlights:<br />

• The deep injection well<br />

and dual zone monitor<br />

well were designed and<br />

permitted by <strong>Tetra</strong> <strong>Tech</strong><br />

and were constructed to<br />

comply with the<br />

regulatory requirements<br />

of the Florida<br />

Department of<br />

Environmental<br />

Protection Underground<br />

Injection Control Rule<br />

• This project included<br />

preliminary and final<br />

design services,<br />

permitting, bidding, and<br />

negotiation for the wells<br />

Project Value:<br />

$260,000 (Project Fee)<br />

$4,700,000<br />

(Construction Cost)<br />

<strong>Tetra</strong> <strong>Tech</strong> provided hydrogeological services to the City related to the design and<br />

permitting of the Concentrate Disposal Test/Injection Well and Monitoring Wells. A<br />

new deep injection well was constructed to dispose of the concentrate from the proposed<br />

nanofiltration/reverse osmosis water treatment plant (WTP). The new deep injection<br />

well is located on the Norwood-Oeffler WTP site after an exemption was obtained for<br />

the required setbacks to the existing potable water supply wells.<br />

The Class I injection well was designed to a depth of approximately 3,400 feet below<br />

land surface with a FRP tubing inside diameter of 14.5 inches to handle the maximum<br />

initial Phase I concentrate disposal flow of 5 MGD. A dual zone monitoring well was<br />

constructed for monitoring of the shallow and deep aquifers overlying the zone of<br />

injection. The dual zone monitoring well included construction of 16-inch intermediate<br />

casing to a depth of approximately 1370 feet below land surface with 65/8-inch tubings<br />

constructed to depths of 1,670-feet below land surface for monitoring of the shallow and<br />

deep aquifers, respectively. The deep injection well and dual zone monitor well were<br />

designed and permitted by <strong>Tetra</strong> <strong>Tech</strong> and were constructed to comply with the<br />

regulatory requirements of the Florida Department of Environmental Protection<br />

Underground Injection Control Rule.<br />

This project included preliminary and final design services, permitting, bidding, and<br />

negotiation for the wells.<br />

Project Duration:<br />

February 2001 to<br />

March 2004<br />

Project Staff:<br />

Charles Drake, PG<br />

James Christopher, PE<br />

Reference:<br />

City of North Miami Beach<br />

17050 N.E. 19th Avenue<br />

North Miami Beach, FL<br />

331662<br />

Dr. Jeff An<br />

305.948.2967<br />

Page 58


Communication Tower Design & Permitting<br />

Naples, Florida<br />

Project Highlights:<br />

• Communication Tower<br />

Design & Permitting<br />

• SCADA Improvements<br />

to WTP, WWTP and<br />

well sites<br />

• Collier County<br />

permitting<br />

Project Value:<br />

$160,000 (Project Fee)<br />

In an effort to improve communication within the City of Naples utility system, <strong>Tetra</strong><br />

<strong>Tech</strong> was retained to perform the design, permitting and construction oversight for the<br />

installation of six (6) new radio towers ranging in height from 65 feet to 100+ feet.<br />

The City’s potable water system consists of two (2) wellfields, the East Golden Gates<br />

Wellfield, located approximately 20 miles from the City’s Water Treatment Plant (WTP)<br />

and the Coastal Ridge Wellfield, located adjacent to the WTP. In addition, the City<br />

owns and operates three (3) potable water storage and booster pumping facilities, located<br />

throughout the distribution system.<br />

In order to provide increased reliability and communication for SCADA control, the<br />

City saw the need for increased communication through a new Ethernet radio system. In<br />

order to properly operate the system and assure that customers do not lose service, the<br />

City continually monitors tank level, valve operation, pump operation, chemical feed<br />

levels and dosage, water quality monitoring, etc. As the system is so vast, this<br />

monitoring needs to be performed, reliably at the WTP where the operating staff is<br />

normally located.<br />

<strong>Tetra</strong> <strong>Tech</strong> facilitated a complete software generated radio path analysis which included<br />

path profiles, 360-degree coverage plots and antenna height requirements for successful<br />

communication. The analysis included radio paths between pertinent locations. The<br />

radio path analysis and technical basis of design of the project were summarized in a<br />

technical memorandum, with recommended final heights.<br />

<strong>Tetra</strong> <strong>Tech</strong> performed the tower design, communication system design, radio frequency<br />

study, including coordination with Motorola to recommend the proper equipment and to<br />

secure the available radio frequencies. In addition, we performed the structural design to<br />

assure that the freestanding towers would meet current hurricane wind load requirements<br />

for this region.<br />

<strong>Tetra</strong> <strong>Tech</strong> performed permitting through both Collier County and the City of Naples.<br />

Three (3) of the towers were permitted through Collier County and required to meet both<br />

zoning requirements and Land Development Code requirements. In addition, <strong>Tetra</strong> <strong>Tech</strong><br />

coordinated with the Federal Aviation Administration (FAA) providing notification of<br />

the towers construction per CFR Title 14 Part 77.13.<br />

Project Duration:<br />

2008 (Design)<br />

2009-2010<br />

(Construction)<br />

Reference:<br />

City of Naples<br />

380 - 13th Street North<br />

Naples, Florida 34102<br />

Mr. Bob Middleton<br />

239.213.4714<br />

Page 59


Continuing Consultant<br />

City of Deltona, Florida<br />

Project Highlights:<br />

• Our full service<br />

capabilities gave the<br />

City the convenience of<br />

having to work with one<br />

consultant for multiple<br />

departments.<br />

• On a short notice, <strong>Tetra</strong><br />

loaned the City in-house<br />

staff to assist building<br />

department.<br />

<strong>Tetra</strong> <strong>Tech</strong> has served as a Continuing Consultant for the City of Deltona since April of<br />

2002. Our services have included support to several departments including Public<br />

Works, Public Utilities, Development Services, Parks and Recreation and the Building<br />

and Fire Department.<br />

Our public works services included: CIP planning and budgeting; stormwater utility<br />

study and rate adjustment; Public Relations on controversial projects; Stormwater<br />

Retrofit Projects; Cost estimates; peer reviews of projects by others; flood plain<br />

modeling and mapping; grant support; stormwater master plan update; mapping of<br />

various infrastructure; CEI services; preliminary design reports; and emergency<br />

management support during flooding. <strong>Tetra</strong> <strong>Tech</strong> also coordinated and managed the<br />

City’s debris removal program follow the hurricanes in 2004.<br />

<strong>Tetra</strong> <strong>Tech</strong>’s support to public utilities involved: water and sewer master plans; design<br />

and permitting of water and sewer utility projects; rate studies; engineering services to<br />

relocate utilities for roadway projects; and water and waste water treatment plant<br />

improvement projects.<br />

<strong>Tetra</strong> <strong>Tech</strong>’s support to the Development services involved review of commercial<br />

industrial site plans; attending DRC meetings; conducting site inspections; preparing<br />

miscellaneous development review manuals and policies; preparing GIS maps for<br />

various functions such as flood plains and problem lots that should be given higher<br />

levels of consideration during the development review process.<br />

Our involvement with Parks and Recreation included: Engineering design and permitting<br />

of improvements at several parks; Grant Support; Design and permitting of several<br />

floating docks; Support for seawall rehabilitation.<br />

• We conducted training<br />

sessions at the City for<br />

building department and<br />

public works staff.<br />

Project Value:<br />

Varies from Project to<br />

Project<br />

Project Duration:<br />

Varies from Project to<br />

Project<br />

Project Staff:<br />

William Musser, PE, PH,<br />

PWS, LEED ® AP<br />

Client Manager<br />

Roderick Cashe, PE, CDT<br />

Project Manager<br />

Andrew Woodcock, PE,<br />

MBA<br />

Project Manager<br />

Reference:<br />

City of Deltona<br />

2345 Providence Boulevard<br />

Deltona, FL 32725<br />

Mr. Gerald Chancellor<br />

386.878.8998<br />

<strong>Tetra</strong> <strong>Tech</strong> also supported the Building and Fire Departments with such activities as:<br />

engineering review of single lot residential site plans; miscellaneous engineering<br />

services for structural and MEP and site engineering design and permitting of fire<br />

stations.<br />

Page 60


Northwest Wellfield Wetlands Monitoring<br />

Lakeland, Florida<br />

Project Highlights:<br />

• <strong>Tetra</strong> <strong>Tech</strong> constructed<br />

approximately 20<br />

surficial aquifer monitor<br />

wells and established<br />

continuous water level<br />

recorders of five (5)<br />

upper Floridan Aquifer<br />

wells located off-site<br />

• <strong>Tetra</strong> <strong>Tech</strong> is also<br />

responsible for writing<br />

an aerial photograph<br />

interpretation report<br />

which is also required<br />

as part of the WUP<br />

In 1992, <strong>Tetra</strong> <strong>Tech</strong> obtained a water use permit in the Northwest and Northeast<br />

wellfields for the City of Lakeland. The Northeast wellfield is permitted to pump 9.0<br />

MGD average and 16.0 MGD maximum from the 800-acre wellfield. The 800-acres<br />

contain both wetlands and uplands; permitting law dictates monitored use of water levels<br />

in the surficial and upper Floridan Aquifers. <strong>Tetra</strong> <strong>Tech</strong> constructed approximately 20<br />

surficial aquifer monitor wells and established continuous water level recorders of five<br />

(5) upper Floridan Aquifer wells located off-site.<br />

Permit issuance conditions for the WUP require that an ecological monitoring program<br />

be established for the wellfield property in order to detect any effects that groundwater<br />

withdrawals from the wellfield may have on the onsite wetlands. <strong>Tetra</strong> <strong>Tech</strong> staff has<br />

been responsible for the bi-annual monitoring events since 1993. This consists of<br />

individual monitoring programs for vegetation, soil subsidence, water levels, and general<br />

vegetative trends. Vegetative monitoring includes the use of meter square plots to<br />

analyze the subcanopy and groundcover, as well as observe general trends in the canopy.<br />

<strong>Tetra</strong> <strong>Tech</strong> also performs photographic monitoring at each wetland within the wellfield.<br />

In order to comply with the WUP, <strong>Tetra</strong> <strong>Tech</strong> prepared an annual report that is submitted<br />

to the Southwest Florida Water Management District (SWFWMD). This project includes<br />

investigation of any complaints related to City well pumpage and any environmental<br />

mitigation concerns. <strong>Tetra</strong> <strong>Tech</strong> is also responsible for writing an aerial photograph<br />

interpretation report which is also required as part of the WUP. This information is<br />

presented as part of a hydrologic monitoring data document that is annually submitted to<br />

the SWFWMD.<br />

Project Value:<br />

$38,000 (Project Fee)<br />

Project Duration:<br />

On-going<br />

Project Staff:<br />

William Musser, PE, PH,<br />

PWS, LEED ® AP<br />

Project Engineer<br />

Bruce Lafrenz, PG<br />

Hydrogeologist<br />

Reference:<br />

City of Lakeland<br />

Electric & Water Utilities<br />

501 East Lemon Street<br />

Lakeland, FL 33801-5050<br />

Mr. Gary Ross<br />

Assistant Director<br />

WAtr Utilities<br />

863.834.6193<br />

Page 61


Civil<br />

Page 62


Stormwater Master Plan Update<br />

Key Biscayne, Florida<br />

Project Highlights:<br />

• The first task consisted<br />

of inventorying and<br />

mapping stormwater<br />

infrastructure in the City<br />

• The analysis consisted<br />

of hydrologic and<br />

hydraulic modeling<br />

using XP SWMM<br />

• <strong>Tetra</strong> <strong>Tech</strong><br />

concentrated on<br />

repetitive loss<br />

properties<br />

Project Value:<br />

<strong>Tetra</strong> <strong>Tech</strong> is currently contracted to provide professional engineering services for the<br />

Village of Key Biscayne Stormwater Master Plan Update. This project updates the<br />

existing Stormwater Master Plan and the Floodplain Management Plan and is one of the<br />

components required by the Community Rating System (CRS) in order to maintain and<br />

obtain additional credit for the 5-year CRS Cycle Recertification.<br />

The purpose of the Stormwater Master and Floodplain Management Plan Updates are to<br />

meet regulatory requirements, identify problem areas and issues relating to repetitive<br />

loss properties, to identify and evaluate improvement alternatives, and to estimate costs<br />

associated with various improvements to the stormwater management systems.<br />

Updating the Stormwater Master and Floodplain Management plans also assists the<br />

Village of Key Biscayne in maintaining the Class 7 rating compliance with the<br />

requirements of the National Flood Insurance Program (NFIP) CRS program.<br />

Tasks conducted as part of this project include:<br />

• Data collection<br />

• Existing stormwater infrastructure inventory<br />

• Preparation if a geographic information system (GIS) to serve as a platform for the<br />

existing and future stormwater infrastructure<br />

• Preparation of a stomwater atlas based on the GIS platform<br />

• Preparation of a hydraulic/hydrologic model of the Village’s stormwater system<br />

• Identification of existing and future levels of service (LOS) based on water level<br />

rises for varying stormwater conditions<br />

• Preparation of cost estimates for various alternatives<br />

• Prioritization of future improvements<br />

• Identification of phased capital improvements<br />

• Preliminary design of recommended alternatives<br />

• Funding requirements and coordination with the stormwater rate study<br />

$ 143,342.00<br />

Project Duration:<br />

2010 - 2011<br />

Project Staff:<br />

Ken Caban, PE<br />

Project Manager<br />

Alicia M. Verea-Feria, EI<br />

Project Engineer<br />

Rod Cashe, PE<br />

Project Engineer<br />

Mike Saxton, PE, CFM<br />

Project Engineer<br />

Alex Montalvo<br />

GIS Specialist<br />

William Musser, PE, CFM,<br />

PH<br />

Quality Control<br />

Reference:<br />

Village of Key Biscayne<br />

88 W. McIntyre Street<br />

Key Biscayne, FL 33149<br />

John Gilbert<br />

305.365.8945<br />

Page 63


City of Miami Beach Normandy Isles<br />

Streetscape and Infrastructure Improvements<br />

Miami Beach, Florida<br />

Project Highlights:<br />

• Streetscape<br />

• Water & Wastewater<br />

Infrastructure Design<br />

• Stormwater Design<br />

• Permitting<br />

• Construction Services<br />

Construction Cost:<br />

$10,000,000<br />

Project Duration:<br />

2007-Current<br />

Project Staff:<br />

Roderick Cashe, PE<br />

Project Manager<br />

As Design Engineer, <strong>Tetra</strong> <strong>Tech</strong> coordinated all design and permitting efforts for this<br />

major neighborhood improvement project. <strong>Tetra</strong> <strong>Tech</strong> developed the Basis of Design<br />

documents by conducting extensive public meetings and exhaustive conferences with the<br />

owner, the City of Miami Beach. Five hundred pages of plans were required for the<br />

complete design to convey the scope required. Twelve permits from various Miami Dade<br />

agencies were obtained; each requiring an agency specific set of plans. <strong>Tetra</strong> <strong>Tech</strong> also<br />

provided construction services under a contract with the City’s Program Manager, Hazen<br />

& Sawyer.<br />

Project Scope included the following:<br />

• Targeted Sidewalk Replacement and In Fill – 4,100 SY of sidewalk was constructed<br />

including new, replacement, and in fill.<br />

• Street-End Improvements – Existing practically unused street ends that terminate<br />

were converted into parks and recreation areas.<br />

• Textured Pavement Improvements – Neighborhoods are differentiated from the<br />

FDOT roads by using crosswalks constructed with brick pavers and textured<br />

pavement of contrasting color.<br />

• Roadway Resurfacing: – 38,000 SY of asphalt pavement was milled and resurfaced<br />

which is nearly 10 lane miles of roadway throughout the island. All of the existing<br />

painted pavement markings were replaced with markings of thermoplastic material<br />

and 100 roadside signs were removed, relocated, or replaced.<br />

• Landscaping – 315 of the existing trees were relocated to enhance the appearance of<br />

the right of way and 750 new trees of native specie were planted as well. 90,000 SY<br />

of sod was installed.<br />

• Irrigation – 15,000 LF of irrigation pipe and 10,000 sprinkler heads were constructed<br />

to provide positive watering for the new and existing trees and the new sod.<br />

• Water Main Replacement – 30,000 LF of 6”, 8”, and 12” water main was included as<br />

well as the required fittings and valves.<br />

• Rear Easement Water Service Relocation – This included replacement services and<br />

new water meters for 480 homes throughout the island.<br />

• Lighting Enhancements – 170 new light poles and fixtures are installed in two<br />

neighborhoods. There are 150 “acorn” architectural poles and luminaires and 20<br />

traditional light poles installed to enhance neighborhood ambience and safety. 30,000<br />

LF of underground conduit and conductor were required to complete the installation.<br />

Alicia Verea-Feria, EI<br />

Reference:<br />

City of Miami Beach<br />

1700 Convention Ctr Dr.<br />

Miami Beach, FL 33139<br />

Mr. Richard Saltrick<br />

305.673.7071<br />

Page 64


Stormwater Master Plan Update<br />

Naples, Florida<br />

Project Highlights:<br />

• Naples Bay<br />

SWIM/TMDL Integration<br />

• Convert CAD Inventory<br />

to GIS<br />

• Funding Re-Evaluation<br />

• Floodplain/Tidal<br />

Assessment<br />

Project Value:<br />

$90,000 (Project Fee)<br />

Project Duration:<br />

The City of Naples contracted <strong>Tetra</strong> <strong>Tech</strong> to integrate and update the city’s stormwater<br />

program to reflect the past twenty years of various stormwater master plans and reports.<br />

The emphasis of the master plan update was to focus the citywide effort in the areas of<br />

water quality improvements (flood control), water quality improvements (and retrofit<br />

pollution treatment), and overall integration of regional management practices affecting<br />

Naples bay. Significant environmental concerns were focused on Naples Bay since it<br />

was recently adopted as a South Florida Water Management District (SFWMD) SWIM<br />

water body. In addition, the report was to adjust the five year and ten year financial<br />

expectations including a review of their existing stormwater utility.<br />

The scope of services included performing the following:<br />

• Revised basin delineation<br />

• Asset inventory recertification<br />

• Summary of tidal influences on tailwater flooding<br />

• Summary of localized water quantity (flooding) problems<br />

• Summary of water quality problems<br />

• Summary of coastal floodplain liabilities<br />

• Reconciliation of level of service (LOS) discrepancies/inconsistencies<br />

• Summary of water quality sampling program<br />

• Assessment of existing condition of receiving water bodies<br />

• Assessment of future regulatory issues<br />

• Assessment of financial issues and opportunities<br />

• Final recommendations for immediate action<br />

2007<br />

Project Staff:<br />

William Musser, PE, PH,<br />

PWS, LEED ® AP<br />

Project Manager<br />

Burl Reardon PE<br />

Project Engineer<br />

Andrew Woodcock, PE,<br />

MBA<br />

Reference:<br />

City of Naples<br />

380 - 13th Street North<br />

Naples, Florida 34102<br />

Mr. Bob Middleton<br />

Public Works Director<br />

239.213.4714<br />

It was identified during the master plan update that there were approximately $60<br />

million worth of improvements and studies that need to be funded over the next ten<br />

years. In addition, it was determined that the existing stormwater utility rate structure<br />

and policies were not adequate to properly fund the upcoming projects identified and<br />

adjustments to the utility would be necessary.<br />

Page 65


Drainage Improvements for Woodcrest Road,<br />

Glenridge Road, Buttonwood Drive<br />

Key Biscayne, Florida<br />

Project Highlights:<br />

• Alleviating flooding<br />

conditions on three<br />

thoroughfares within the<br />

Village of Key Biscayne<br />

Project Value:<br />

$425,500<br />

Project Duration:<br />

(Project Completed)<br />

Project Staff:<br />

Alicia Verea-Feria, EI<br />

Project Engineer<br />

Reference:<br />

City of Key Biscayne<br />

88 West McIntyre Street<br />

Village of Key Biscayne<br />

FL 33149<br />

This project consisted of the installation of 2000 LF of HDPE pipe, 18 catch basins and<br />

manholes, connecting to an existing system to alleviate flooding conditions on three<br />

thoroughfares within the Village of Key Biscayne. Repaving of same and bringing all<br />

properties back to original condition with landscaping and driveway restoration.<br />

John Gilbert<br />

305.365.8945<br />

As Design Engineer, <strong>Tetra</strong> <strong>Tech</strong> coordinated all design and permitting needed for the<br />

project. <strong>Tetra</strong> <strong>Tech</strong> was also responsible for the onsite inspections, safety, and<br />

scheduling of street closings.<br />

As Owners Agent, <strong>Tetra</strong> <strong>Tech</strong> was responsible for the contract, bidding and on time<br />

performance of contractor. Pay applications and retainage controlled by us as well.<br />

Page 66


Continuing Miscellaneous Engineering<br />

Consultant<br />

Cape Coral, Florida<br />

<strong>Tetra</strong> <strong>Tech</strong> has provided continuing miscellaneous professional engineering services to<br />

the City of Cape Coral for a variety of utility related projects since 2000, and prior to that<br />

for preparation of the City’s Annual Reports as required for compliance with their Utility<br />

Bond covenants. Specific projects have included lift station refurbishment design, water<br />

and wastewater treatment plant modifications, utility infrastructure improvements and<br />

other miscellaneous engineering services as needed, and have included the following<br />

services:<br />

• Permitting related services for the City’s water and wastewater facilities (including<br />

preparation of Capacity Analysis Reports and permit renewals).<br />

• Water main, wastewater collection and force main system upgrades and replacements.<br />

• Lift Station conversions (dry pit to wet pit) and rehabilitation.<br />

• Evaluations and inspections of the existing utility systems.<br />

• Water Treatment Plant improvements (degasification upgrades, chemical storage<br />

expansion).<br />

• Water and Wastewater system evaluations (smoke testing, water audits, leak detection,<br />

meter testing).<br />

• Hydrogeological services for monitoring wells and concentrate discharge.<br />

• Irrigation system improvements (weir installation and piping for canal interconnections).<br />

• Preparation of Annual Reports and Engineering Report for Utility Bonds.<br />

• Security Improvements associated with Water Treatment and distribution systems.<br />

• Upgrades to instrumentation and controls at Water Treatment Plant and remote storage sites.<br />

• Building Improvements/additions associated with WTP, other Utility Buildings<br />

Some of the major projects completed include but are not limited to the following:<br />

Project Highlights:<br />

• <strong>Tetra</strong> <strong>Tech</strong> has<br />

provided the design,<br />

permitting, bidding and<br />

construction<br />

management for nearly<br />

15 lift station upgrades<br />

for the City<br />

• <strong>Tetra</strong> <strong>Tech</strong> has been<br />

preparing the Annual<br />

Reports for the City’s<br />

Utility Bonds since<br />

1994<br />

Project Value:<br />

N/A<br />

Project Duration:<br />

Ongoing<br />

Project Staff:<br />

Daniel Nelson, PE<br />

Project Manager<br />

Reference:<br />

City of Cape Coral<br />

P.O. Box 150097<br />

Cape Coral, FL 33915-<br />

0027<br />

Mr. Jody Sorrels, PE<br />

Utilities Manager<br />

239.242.3227<br />

• Lift Station Upgrades: <strong>Tetra</strong> <strong>Tech</strong> has provided the design, permitting, bidding and construction management for<br />

nearly 15 lift station upgrades for the City. The upgrades have included conversion from dry pit to wet pit, wet<br />

well rehabilitation, pump and electrical upgrades and pipe replacement through the valve vault<br />

• Annual Report Preparation for Utility Bonds – <strong>Tetra</strong> <strong>Tech</strong> has been preparing the Annual Reports for the City’s<br />

Utility Bonds since 1994<br />

• Galvanized Pipe Replacement – <strong>Tetra</strong> <strong>Tech</strong> has performed design and permitting for the replacement of nearly<br />

40,000 linear feet of aging 2-inch galvanized pipe with new 6-inch PVC pipe within a congested residential area<br />

in Southeast Cape Coral<br />

Page 67


ARCHITECT - ENGINEER QUALIFICATIONS<br />

1. SOLICITATION NUMBER (If any)<br />

RFQ NO: 2012-10<br />

PART II - GENERAL QUALIFICATIONS<br />

(If a firm has branch offices, complete for each specific branch office seeking work.)<br />

2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 4. DUNS NUMBER<br />

<strong>Tetra</strong> <strong>Tech</strong> -- Miami 1966 045224250<br />

2b. STREET 5. OWNERSHIP<br />

a. TYPE<br />

150 West Flager Street, Suite 1625<br />

Corporation<br />

2c. CITY 2d. STATE 2e. ZIP CODE b. SMALL BUSINESS STATUS<br />

Miami FL 33130 N/A<br />

6a. POINT OF CONTACT NAME AND TITLE<br />

7. NAME OF FIRM (If block 2a is a branch office)<br />

Kenneth L. Caban, PE, BCEE, Regional Manager-Southeast Florida<br />

6b. TELEPHONE NUMBER 6c. E-MAIL ADDRESS<br />

786.507.3898 ken.caban@tetratech.com<br />

<strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>.<br />

8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER<br />

N/A N/A N/A<br />

9. EMPLOYEES BY DISCIPLINE<br />

10. PROFILE OF FIRM’S EXPERIENCE AND<br />

ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS<br />

a. Function<br />

Code<br />

b. Discipline<br />

c. No. of Employees a. Profile<br />

(1) FIRM (2) BRANCH<br />

Code<br />

b. Experience<br />

c. Revenue<br />

Index Number<br />

(see below)<br />

02 Administrative 1,912 1 W03 Water Supply; Treatment and Distribution 2<br />

48 Project Manager 590 1 S13 Storm Water Handling & Facilities 2<br />

52 Sanitary Engineer 70 1 P06 Planning (Site, Installation, and Project) 2<br />

58 <strong>Tech</strong>nician/Analyst 690 1 S04 Sewage Collection, Treatment and Disposal 1<br />

A05 Airports; Navaids; Airport Lighting; Aircraft Fueling 1<br />

Other Employees 9,738 E09<br />

Environmental Impact Studies, Assessments or<br />

Statements<br />

1<br />

T03 Traffic & Transportation Engineering 1<br />

P06 Planning (Site, Installation, and Project) 1<br />

11. ANNUAL AVERAGE PROFESSIONAL<br />

SERVICES REVENUES OF FIRM<br />

FOR LAST 3 YEARS<br />

(Insert revenue index number shown at right)<br />

a. Federal Work 2<br />

b. Non-Federal Work 3<br />

c. Total Work<br />

4<br />

Total 13,000 4<br />

PROFESSIONAL SERVICES REVENUE INDEX NUMBER<br />

1. Less than $100,000 6. $2 million to less than $5 million<br />

2. $100,000 to less than $250,000 7. $5 million to less than $10 million<br />

3. $250,000 to less than $500,000 8. $10 million to less than $25 million<br />

4. $500,000 to less than $1 million 9. $25 million to less than $50 million<br />

5. $1 million to less than $2 million 10. $50 million or greater<br />

12. AUTHORIZED REPRESENTATIVE<br />

The foregoing is a statement of facts.<br />

a. SIGNATURE b. DATE June 18, 2012<br />

c. NAME AND TITLE Jon Fox, PE, Vice Presedent<br />

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) PAGE 6<br />

Page 68


D.2 Part II – Statement and Licenses<br />

<strong>Tetra</strong> <strong>Tech</strong> is licensed, permitted and certified to do business in the State of Florida. The following pages<br />

include: copies of Board of Professional Engineers licenses for staff personnel, <strong>Tetra</strong> <strong>Tech</strong> certification to<br />

business in the State of Florida, and proof we are a registered vendor with the City of North Miami Beach,<br />

Florida.<br />

Page 69


D.2 Part II – Statement and Licenses<br />

Page 70


D.2 Part II – Statement and Licenses<br />

Page 71


D.2 Part II – Statement and Licenses<br />

Page 72


D.3 – Supplemental Material- Quality Assurance<br />

And Quality Control<br />

QUALITY ASSURANCE AND QUALITY CONTROL<br />

All deliverables, whether draft or final, undergo a formal review process<br />

prior to submittal to any client. Reviewers are senior staff and<br />

corporate/regional technical advisory group specialists who are kept<br />

involved in and informed about the project from conception through<br />

completion, particularly regarding project objectives, approach to<br />

completion of the scope of work, and client expectations. The plan and<br />

schedule for review during various stages of the project is established at<br />

the beginning of the project between the review team and the project<br />

manager. Typical review points include: development of the project<br />

approach, initial project peer review, 30-, 60-, 90- and 100 percent<br />

completion inter-discipline checks, and final sign-off. <strong>Tetra</strong> <strong>Tech</strong>’s Quality<br />

Assurance Plan for work performed as part of the City’s Continuing<br />

Contract outlines the systematic processes intended to ensure that the<br />

work products prepared will meet the City’s requirements and that the<br />

City is confident in the quality of the work products. <strong>Tetra</strong> <strong>Tech</strong>’s<br />

proposed Quality Assurance Plan is provided as follows.<br />

<strong>Tetra</strong> <strong>Tech</strong>’s Quality Program is based on a corporate philosophy of clearly understanding client goals and<br />

expectations and providing deliverables and services that fully meet these goals and expectations in a costeffective<br />

manner. <strong>Tetra</strong> <strong>Tech</strong>’s Quality Program consists of: Quality Assurance (QA), Quality Control (QC), and<br />

Quality Improvement (QI).<br />

Quality Assurance – Processes are practiced on projects to meet the following goals:<br />

• The deliverables that are prepared meet or exceed the client’s needs<br />

• The basis of design and the deliverables are consistent with the objectives established<br />

• Quality processes are completed/documented<br />

• Provide opportunity for the customer to provide feedback regarding our services<br />

• Ensure implementation of the quality review process through an internal quality audit process<br />

Quality Control – Involves the detailed checking of design calculations, plan content, quantities, probable costs,<br />

and plan presentation. Checklists are used to ensure that all relevant items are reviewed and that deliverables<br />

are mathematically and grammatically correct and appropriate.<br />

Quality Improvement – Is a proactive approach to QA that focuses on structured problem-solving by identifying<br />

problems early and improving work processes. <strong>Tetra</strong> <strong>Tech</strong> uses the results of QC checks as a learning tool to<br />

improve the quality of future deliverables and services for our clients.<br />

Page 73


D.3 – Supplemental Material<br />

<strong>Tetra</strong> <strong>Tech</strong>'s QA/QC/QI Process includes the following:<br />

1) The Project Manager (PM) is responsible for planning and budgeting for project reviews upon project<br />

initiation.<br />

a) The PM will develop a work plan for the project.<br />

b) During the project planning activities, the PM will identify the individuals who will perform the project<br />

review(s). The PM will consult with the affected Discipline and Group Leaders as needed.<br />

c) The PM may conduct any of the following reviews in addition to technical project review(s), as<br />

appropriate: Added Value/Constructability Review, Lead Discipline Review, New Product Review.<br />

d) All <strong>Tetra</strong> <strong>Tech</strong> deliverables are reviewed prior to being released to the client.<br />

2) <strong>Tech</strong>nical reviews will be conducted per the project review schedule and documented on the appropriate<br />

discipline(s) technical checklist(s).<br />

3) The reviewer will conduct a quality control review on the project deliverables.<br />

a) Individuals who perform technical review have experience in the subject being reviewed and will be<br />

independent of the project.<br />

b) In addition to the criteria listed on the technical checklists, the reviewer must consider the standards,<br />

codes, and regulations applied to the project. The PM will ensure that the deliverable is reviewed against<br />

the client’s expectations.<br />

c) All company standards are adhered to unless superseded by client standards.<br />

d) The reviewer(s) will perform the following checks as appropriate: check calculations, plan content,<br />

quantities, probable costs, plan presentation, and back check red-lines.<br />

e) The completed review checklist is sent to the PM along with marked-up versions of the deliverable (if<br />

generated).<br />

f) The PM or appropriate designee (i.e., a member of the related technical discipline) is responsible for<br />

reviewing subconsultant work.<br />

g) The reviewer’s signature on the Deliverable Authorization Form indicates that the reviewer confirmed<br />

that the technical review(s) was conducted, red-lined drawings were back checked, and the deliverable<br />

meets the client’s expectations.<br />

Page 74


D.3 – Supplemental Material<br />

4) Key Concept Review – Following the completion of the basis of design, a key concept review is performed by<br />

an individual appointed by the chief engineer to review whether the design basis is consistent with the project<br />

objectives.<br />

5) Construction Cost Estimating – All construction cost estimates (conceptual, preliminary, and final) must be<br />

approved by the Operations Manager or designee. This individual will review estimates for contingencies,<br />

completeness, and impacts to existing facilities.<br />

6) Added Value/Constructability Review – This review considers issues such as:<br />

• Ease of construction and operational flexibility<br />

• Contractor/equipment access and clearances<br />

• Duration of construction<br />

• Clarity for bidding<br />

• Use of alternates<br />

• Staging methods<br />

Page 75


D.3 – Supplemental Material<br />

7) Contract Document Check – A CADD check will be performed concurrent with Department Checks. The<br />

drawings will be reviewed for presentation and conformance with company and owner CADD standards. The<br />

project manual will be checked for conformance with company standards. Electronic documents with revision<br />

marks shall be submitted to the authorized reviewer. The study and design documents will be checked by the<br />

survey manager for surveying issues related to layout, right of way availability, and control.<br />

8) Documentation of all quality processes shall be summarized and maintained in the project file.<br />

<strong>Tetra</strong> <strong>Tech</strong>’s success in project implementation is due in large part to our comprehensive Quality Program. We<br />

will use this program to ensure that projects meet the City’s requirements and meet or exceed the City’s<br />

requirements for quality.<br />

MAINTENANCE OF TIME SCHEDULES AND COST CONTROLS<br />

<strong>Tetra</strong> <strong>Tech</strong> prides itself with completing projects on schedule and on budget. <strong>Tetra</strong> <strong>Tech</strong> has instilled the<br />

importance of adhering to a project schedule and budgets into every employee<br />

Approach to Schedule Control<br />

Due to <strong>Tetra</strong> <strong>Tech</strong>’s vast experience with numerous project types, <strong>Tetra</strong> <strong>Tech</strong> has learned how to successfully<br />

manage projects and is experienced in the scheduling requirements, coordination and organization required to<br />

maintain the schedule. Schedules often have overlapping tasks, which utilize various personnel and require<br />

experience in coordinating subconsultants so that multiple critical paths are preserved.<br />

Page 76


D.3 – Supplemental Material<br />

Completing a project on time requires effective project management and an organized approach. At the start of<br />

any project, the <strong>Tetra</strong> <strong>Tech</strong> project manager prepares a Project Management Plan that contains a description of<br />

the project, identifies submittals, lists various tasks, and presents a schedule and a detailed work plan for the<br />

elements of each task with project team members responsible for that task. The Project Management Plan also<br />

includes organizational charts, procedures for correspondence and communications, filing protocols, approvals,<br />

project control, <strong>Tetra</strong> <strong>Tech</strong> standards, client standards, and quality control requirements. The Plan serves as a<br />

baseline for establishing milestones and measuring the progress of the project team versus the schedule. The<br />

project plan will be prepared with the input of the City.<br />

Our ability to meet the project schedule is enhanced by our computer based project management systems. <strong>Tetra</strong><br />

<strong>Tech</strong> currently utilizes Microsoft Project Planner or Primavera for preparation of detailed project schedules. This<br />

software program tracks progress for the established schedule, delineates deliverables, logs project milestones,<br />

and visibly reflects the relationship of various tasks.<br />

In addition, <strong>Tetra</strong> <strong>Tech</strong> believes in open communication during the various phases of a master planning project.<br />

By dedicating time in the schedule to meet with the City to fully understand the requirements of the project, <strong>Tetra</strong><br />

<strong>Tech</strong> will minimize project reworking. Likewise, to facilitate future permitting, <strong>Tetra</strong> <strong>Tech</strong> has an established<br />

philosophy of arranging pre-application meetings with all applicable permitting agencies as a means to facilitate a<br />

more streamlined permitting review process. We have permitted numerous projects without receiving Requests<br />

for Additional Information (RAI) based on our commitment to working with the permitting agency and our ability to<br />

incorporate their comments into the design before it is finalized.<br />

<strong>Tetra</strong> <strong>Tech</strong>’s comprehensive approach to schedule management allows the Project Manager to oversee the<br />

project and has been successfully utilized on many projects to maintain control of the project schedule. With<br />

assurance, we can commit to meeting the City’s schedule needs for the proposed stormwater master plan, since<br />

the elements of work tasks required are similar activities that <strong>Tetra</strong> <strong>Tech</strong> has completed for other public agencies.<br />

As displayed in this LOI submittal, <strong>Tetra</strong> <strong>Tech</strong>’s focus is to serve public agencies, with a large portion of our work<br />

coming from similar projects.<br />

Approach to Project Cost Control<br />

As mentioned above, each Project Manager at <strong>Tetra</strong> <strong>Tech</strong> prepares a<br />

Project Management Plan at the start of every project. In addition to<br />

allowing the Project Manager to review the project schedule and make<br />

corrections to assure that the schedule is adhered to, the Plan also<br />

includes the overall budget, the budget for each task, and anticipated<br />

billings. The Plan closely coordinates the schedule and the budget so<br />

that as the project progresses, the project manager can easily monitor<br />

the billings versus the anticipated budget.<br />

Page 77


D.3 – Supplemental Material<br />

The plan is enhanced by our computer-based accounting system. The accounting system is tied directly to<br />

employee time sheets and billing information and is kept up to date on a weekly basis. This electronic system<br />

reduces delays in getting the Project Manager budget information.<br />

Using the Project Management Plan and the electronic accounting system, <strong>Tetra</strong> <strong>Tech</strong>’s budget management<br />

program allows the project manager to efficiently oversee the project. These tools have been successfully utilized<br />

on many design projects to maintain the project budget. We will work with the City during preparation of our<br />

scope of services so that we have a full understanding of the project from inception. This allows us to develop a<br />

clear and concise scope of services, which is thoroughly reviewed with our clients prior to execution. As such, the<br />

need for unnecessary change orders is eliminated. <strong>Tetra</strong> <strong>Tech</strong> is proud of the fact that we are able to maintain<br />

project budgets largely from defining a clear scope of services with our clients at inception. We encourage the<br />

City to contact any of our clients to confirm our ability to maintain costs, as well as project schedules.<br />

Cost Control<br />

A second major factor <strong>Tetra</strong> <strong>Tech</strong>’s excellent performance record is the ability to provide thorough and complete<br />

documents with which to estimate and control construction costs. Our personnel have many years of estimating<br />

experience and closely scrutinize cost trends in the construction industry, carefully observe local job conditions,<br />

and continuously update the database used in preparing estimates. Since <strong>Tetra</strong> <strong>Tech</strong> has completed numerous<br />

stormwater improvement projects, we have a generous database of recent bid prices for a variety of bid items.<br />

These prices help to establish a valid and reliable cost estimate, especially during master planning.<br />

Our goal is to deliver successful, completed projects that fulfill the needs of our client. One of the lessons learned<br />

in the firm’s years of experience is that good planning and good quality deliverables are the best insurance for<br />

successful completion of a project. Because we pay close attention to each detail and make sure that all aspects<br />

of the project are covered in the design or plan development, our clients are assured that when projects are<br />

released for construction, budgets will be adhered to.<br />

<strong>Tetra</strong> <strong>Tech</strong>'s cost control methods focus on the assignment of key personnel who have established effective work<br />

methods and who are fully experienced in all aspects of the project scope. Furthermore, the opinions and<br />

comments of the City's project staff are encouraged throughout the project planning, permitting, design and<br />

construction phases to ensure that all project objectives are satisfied. The key personnel for this project have<br />

managed and prepared similar master plans. In addition, all project work is subject to technical and value<br />

engineering reviews by senior staff members who are not directly involved in the project. This procedure includes<br />

a formal periodic analysis of each project supported by our computer based project management system to<br />

monitor and control project costs.<br />

Page 78


D.3 – Supplemental Material<br />

Construction Cost Estimating Control<br />

Provided below is <strong>Tetra</strong> <strong>Tech</strong>’s history and experience with construction cost estimating control. Our experience<br />

with value engineering will be valuable during the review of alternatives and in development of the capital<br />

improvement program.<br />

Construction cost estimates are submitted during preparation of the preliminary design report, preliminary design,<br />

and final design. Typically, a contingency is included during the design report and preliminary design stages, as<br />

the understanding of final requirements such as pipe size or equipment size may not have been determined at<br />

that point. Preparation of thorough and complete construction drawings and specifications are used to update<br />

conceptual construction costs identified during the planning phase. In the event that cost estimates exceed the<br />

City's budget to such a point that completion of any phase of the project is in jeopardy, we will evaluate the<br />

design through “value engineering” methods to identify changes necessary to bring the cost within budget. If<br />

value engineering determines the project design is the most cost effective means of obtaining the desired results<br />

of the City, justification will be provided to support an increase to the project budget. However, every effort is<br />

made to adhere to the project budget.<br />

Using a Value Engineering approach is required to arrive at the best possible operational system for any project.<br />

Our value engineering team leader firmly believes that the value engineering (VE) team approach that matches<br />

individual talents and capabilities to specific job requirements and tasks is the best way to analyze project<br />

efficiency and cost effectiveness.<br />

The VE team members all have construction experience directly related to the needs of the City of Pompano<br />

Beach. The VE team further consists of members that have years of general contracting and construction<br />

management experience. This experience allows the VE team the option of comparative construction cost<br />

estimating based on a wide array of technologies that have been implemented by these particular team members<br />

in conjunction with team members that have years of process experience. This results in recommendations that<br />

include the least possible construction costs without jeopardizing the needs of the citizens within the jurisdiction<br />

of the City or regulatory requirements.<br />

The VE team utilizes a breakdown of major construction categories and their respective percentage of total cost<br />

for selective processes. By carefully examining the breakdown data, we are able to reveal the relative importance<br />

of various disciplines in the design of particular facilities. These facts are carefully considered in determining the<br />

constructability of projects by construction team members noting that high cost categories offer the greatest<br />

potential for cost savings. The VE team members have substantial construction experience. We have found that<br />

this experience stimulates VE recommendations directly related to the project's "constructability."<br />

In the unlikely event that construction bids exceed the final construction budget by more than 10 percent, we will<br />

review the bid, as well as the design, to determine reasons as to why construction costs are higher than<br />

anticipated. For unit price work, contractor’s costs can be compared to those costs obtained by <strong>Tetra</strong> <strong>Tech</strong> from<br />

Page 79


D.3 – Supplemental Material<br />

suppliers. If costs are significantly different, we can work to determine the reasoning for supplier cost variations.<br />

Reasoning for high supplier costs may include limited suppliers, or inability of supplier’s equipment to meet the<br />

design requirements, which allows one or two suppliers to increase their costs.<br />

Once we have completed the comparison between budget costs and bid costs, recommendations can be made<br />

as to how costs could be lowered. Such measures might include re-bidding, allowing “approved equal”<br />

substitutes that may be less expensive, or performing minor design revisions for portions of the project that<br />

appear significantly higher. Due to the current bidding environment, it will also be important to secure qualified<br />

bidders for the City's proposed projects. While this process is specific to design projects, the results of this<br />

process will assist this master planning effort by augmenting <strong>Tetra</strong> <strong>Tech</strong>’s cost estimating data bases.<br />

Page 80


E Acknowledgements<br />

E.1 Addenda and Forms<br />

Please see the following pages for addenda and forms as listed below:<br />

• Addenda No. 1<br />

• Addenda No.2<br />

• Addenda No.3<br />

• Addenda No. 4<br />

• Addenda No. 5<br />

• Addenda No. 6<br />

• 6.1 Acknowledgement Form<br />

• 6.2 Statement of NO BID/RFQ<br />

• 6.3 Reference Questionnaires<br />

• 6.4 RFQ Signature Page for Corporation<br />

• 6.5 RFQ Signature Page for Sole Proprietor of Partnership<br />

• 6.6 Drug-Free Workplace Program<br />

• 6.7 Solicitation, Giving, and Acceptance of Gifts Policy<br />

• 6.8 Vendor Registration, Certification, and Licenses<br />

• 6.9 Non-Collusion Affidavit<br />

• 6.10 Source of Information<br />

• 7.3 Respondent Certification<br />

• 7.4 Sworn Statement on Public Entity Crimes<br />

Page 81


City of North Miami Beach, Florida<br />

Procurement Management Division<br />

948-2946<br />

slit<br />

F<br />

ADDENDUM TO RFQ DOCUMENTS<br />

SOLICITATION<br />

RFQ 201 2-10 CONTINUING CONTRACTS FOR PROFESSIONAL SERVICES<br />

Addendum No. I OPENING DATE 512512012 TODAY’S DATE 5I1 512012<br />

To All Bidders:<br />

This addendum is issued to modify the previously issued RFQ documents and/or given for informational purposes, and is<br />

hereby made a part of the REQ documents. Please attach this addendum to the documents in your possession and<br />

acknowledge receipt of this addendum by signing and including this form in the response package.<br />

RFI’S:<br />

Qi: Please let me know if civil engineering and land surveying services are anticipated for the RFQ No. 2012-10<br />

continuing Contract for Professional Services. After reading the scope of service shown in item 3.2 page 34 of the<br />

document it is not clear.<br />

Al: Yes, those services are anticipated. Please refer to the list of disciplines under form Standard Form 330.<br />

Q.2:<br />

A.2:<br />

Q.3:<br />

A.3:<br />

Will you be selecting firms who only provide a portion of the required services or are you only looking for<br />

comprehensive architectural and engineering teams (one prime firm with several specialty subconsultants) or will you<br />

select a list of both?<br />

The City is not requiring that all submittals be from comprehensive architectural and engineering teams. Firms may<br />

submit qualifications for one service only. Please refer to the list of disciplines under form Standard Form 330. Please<br />

see section 3.1 Purpose and Intent and, section 3.2 Scope of Services.<br />

Do you want subconsultants to submit reference forms as well as the prime?<br />

Prime contractors should submit Part II of their subcontractors, including references.<br />

Q.4: Do you want subconsultants to submit complete SF330 documents (Parts I and II) or just Part II?<br />

A.4: Prime contractors should submit Part II of their subcontractors.<br />

Q.5: In regards the above RFQ, please advise if the City is accepting responses from firms applying to cover only a<br />

portion of the scope of work. We specialize in structural engineering, and would like to submit a response to provide<br />

structural services.<br />

A.5: See answer A.2.<br />

17011 NE 19th Aye, North Miami Beach, FL 33162 ~ 305-948-2946 305-957-3522 ~ bids citynmb.com<br />

City of North Miami Beach<br />

Page 82


City of North Miami Beach, Florida<br />

Procurement Management Division<br />

948-2946<br />

Q.6:<br />

A.6:<br />

Q.7:<br />

A.7:<br />

Q.8:<br />

A.8:<br />

Q.9:<br />

A.9:<br />

The requirement for 5 Government Reference as a minimum, if a firm does not have but maybe 3 reference but<br />

multiple projects with these 3 reference will that be acceptable or will the respondent be deemed non responsive if<br />

they do not provide 5 references. Can 2 references come from one source?<br />

The respondent may be deemed non responsive if 5 references are not submitted. Two references cannot come from<br />

one source. Please submit 1 reference per government agency.<br />

Will there be any Geotechnical Engineering or Construction Testing services in this RFQ.<br />

Construction testing will be accepted and added to the list of disciplines. Geotechnical Engineering is part of Civil<br />

Engineering.<br />

On page 36, Section 4.0, Submittal Content, Item Dl. (Form SF 330), indicates that Evaluations will be based on<br />

Part II only.<br />

Yes, the intent of the City is to pre-qualified firms for continuing contracts using information from part II. Once the<br />

projects are allocated/identified the City use Part Ito assign tasks or projects.<br />

On page 36, Section 4.0, Submittal Content, Item D.2 (Form SF 330), also indicates that we should state whether the<br />

business is licensed or certified to do business in the State of Florida and attach copies of such licenses. Should we<br />

also include copies of our key staff PE licenses?<br />

Yes, include also copies of your key staff PE licenses.<br />

Q.10: Section 1.57 Insurance Requirements — Please clarify Professional Liability Requirements as they are not listed.<br />

A.10: Limits of liability for professional liability shall be, at a minimum, $1,000,000 per occurrence or claim and $1,000,000<br />

aggregate.<br />

Q.1 1: Will the City accept the State of Florida Minority, Women, & Service —Disabled Veteran Business Certification or is<br />

the requirement limited to only Miami-Dade County SBE/MBE certification?<br />

A.1 1: Yes, the City will accept the State of Florida Certification.<br />

REVISED FORMS<br />

Section 7.3 Respondents Certifications and Section 7.4 Sworn Statement on Public Entity Crimes has been revised.<br />

See forms attached.<br />

Reviewed by:<br />

______________________________________________________<br />

Ackn~wIedged by:<br />

Authc~riz~d pr~ntativ~ (Printed)<br />

—----- —---- Vice tI erations Manager<br />

Chief Procurement Officer<br />

Procurement Management Division<br />

rt e<br />

Sign tur~~<br />

Date<br />

r<br />

17011 NE 19” Aye, North Miami Beach, FL 33162 g 305-948-2946 ~, 305-957-3522 ~ bids@citynmb.com<br />

City of North Miami Beach<br />

Page 83


City of North Miami Beach, Florida<br />

Procurement Management Division<br />

948-2946<br />

ADDENDUM TO RFQ DOCUMENTS<br />

SOLICITATION<br />

Addendum No.<br />

RFQ 2012-10 CONTINUING CONTRACTS FOR PROFESSIONAL SERVICES<br />

61812012<br />

2 DUE DATE 2:00PM TODAY’S DATE 5I16I2012<br />

To All Bidders:<br />

This addendum is issued to modify the previously issued RFQ documents and/or given for informational purposes, and is<br />

hereby made a part of the REQ documents. Please attach this addendum to the documents in your possession and<br />

acknowledge receipt of this addendum by signing and including this form in the response package.<br />

DUE DATE EXTENSION<br />

The Due Date for this REQ has been extended. The New Due Date and time is June, 8, 2012 at 2:00pm. The address is the<br />

same: 17011 NE 19th Ave Room 315, North Miami Beach, EL 33162.<br />

REVIEW COMMITTEE MEETING<br />

The new Review Committee meeting date will be posted at www.citynmb.com shortly after the REQ due date.<br />

Reviewed by:<br />

Chief Procurement Officer<br />

Procurement Management Division<br />

Ackn~wIedged by:<br />

<strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>.<br />

Contract~r<br />

Jon Fox, PE<br />

)<br />

17011 NE 19tb Aye, North Miami Beach, FL 33162 ~ 305-948-2946 ~ 305-957-3522 ~ bids citynmb.com<br />

City of North Miami Beach<br />

Page 84


City of North Miami Beach, Florida<br />

Procurement Management Division<br />

948-2946<br />

SI,,<br />

ADDENDUM TO RFQ DOCUMENTS<br />

SOLICITATION RFQ 2012-10 CONTINUING CONTRACTS FOR PROFESSIONAL SERVICES<br />

61812012<br />

Addendum No. 3 DUE DATE 2:00PM TODAY’S DATE 5I21I2012<br />

To All Bidders:<br />

This addendum is issued to modify the previously issued RFQ documents and/or given for informational purposes, and is<br />

hereby made a part of the REQ documents. Please attach this addendum to the documents in your possession and<br />

acknowledge receipt of this addendum by signing and including this form in the response package.<br />

RFI’S:<br />

Qi:<br />

Al:<br />

Q.2:<br />

A.2:<br />

What is the duration of the contract and the contract value?<br />

There is no duration of the contract but there is a Termination clause. The expenditure under this contract will be<br />

established within the budgetary amount for each fiscal year.<br />

Can a firm bid as a Prime and also be a Sub-consultant to another bidding firm?<br />

Yes, it can.<br />

Q.3:<br />

A.3:<br />

Section 7, Article 7.1 Exhibit “A” — List of Projects, lists many projects requiring different specialties, be it civil<br />

engineering, architecture, mechanical engineering, planning, etc.. .Should we submit separate SF330, Part I<br />

each type of project or one comprehensive SF330 for all available services that the firm can provide.<br />

Please submit one comprehensive SF330 for available services that the firm can provide.<br />

for<br />

Q.4:<br />

A.4:<br />

Q.5:<br />

A.5:<br />

Q.6:<br />

A.6:<br />

Q.7:<br />

A.7:<br />

Are the contracts to be awarded on professional discipline basis — i.e. for Architecture, and Engineering Separately?<br />

The contracts will be awarded on a qualification basis for each discipline.<br />

How many contracts are expected to be awarded under this RFQ?<br />

The number of contracts to be awarded will be set by the Review Committee team.<br />

There appears to be missing information on page 45 of 69 of the subject Request for Qualifications. Specifically, for<br />

Section 6.8, VENDOR REGISTRATION, CERTIFICATION AND LICENSES. The numbered list begins with the<br />

numeral “3.” What is the intended content of numerals 1-2, which appear to have been have been omitted from the<br />

subject document?<br />

The list is complete. Omit the numerals.<br />

In regarding to the above referenced REQ; we acknowledge text in Section 1.5 Preparation of bids that states that<br />

should be used the forms you provided and no other will be accepted. My questions is: For the SF 300, will the City<br />

accept said form in its pdf format (which contains the same information), or should be strictly used the format<br />

provided by the City in the RFQ?<br />

Yes, PDF format is acceptable. Per Section 1.7, subsection D, Bids should be submitted in duplicate. Submit one<br />

original and one copy. Please include in your proposal package a CD or flash drive containing a copy of the entire<br />

original submission.<br />

17011 NE J9t5 Aye, North Miami Beach, FL 33162 ~ 305-948-2946 ~ 305-957-3522 ~ bids citynmb.com<br />

City of North Miami Beach<br />

Page 85


City of North Miami Beach, Florida<br />

Procurement Management Division<br />

948-2946<br />

Q.8: FDOT does not fill out reference forms as you have requested. FDOT provides a score sheet rating our performance<br />

on each project and that is available for us to phnt and submit. Can this form be substatuted for your form as it<br />

relates to FDOT. Also would district 4 and 6 be considered two different sources which would give us the required 5<br />

references?<br />

A.8: Yes, this form can be substituted as it relates to FDOT. District 4 and 6 can be considered two sources as long as it<br />

relates to professional services, not construction services.<br />

Q.9:<br />

A.9:<br />

Q.10:<br />

A.10:<br />

Page 36, Item Dl states that only Part II of the SF 330 will be evaluated which was also confirmed by Addendum<br />

No. 1. However, in Section 5.1 on page 37 it states that 65 of the 100 evaluation points is based on personnel<br />

and firm experience which are required in Part I of the SF 330. Would you like to see this information duplicated<br />

in the Executive Summary section for RFQ evaluation purposes?<br />

This information is part of SF330 Part II, item 9 and 10. Also, the information given under the Reference<br />

Questionnaires will be utilized. You may include relevant information under Executive Summary.<br />

Does the City have an S/MBE goal for this project?<br />

No, but the City is encouraging S/MBE to participate in this RFQ.<br />

Q.1 1: Are there specific requirements to address “Financial Stability and Past Record?<br />

A.11: Please provide information required under SF330 Part II, item 10 andli.<br />

Q.12:<br />

A.12:<br />

Part I, F of SF 330— does the City have a limit to the number of project examples allowed or is 10 the maximum?<br />

Please use 10 of the most current government project examples.<br />

Q. 13: Kindly advise if a firm may submit a response for itself alone as prime, and also be a subconsultant in another team.<br />

Are there any teaming restrictions, in general?<br />

A.13: Please see A.2<br />

Q.14:<br />

A.14:<br />

Q.15:<br />

A.15:<br />

Q.16:<br />

A.16:<br />

Q.17:<br />

A.17:<br />

Q.18:<br />

A.18:<br />

The Contract is for Professional Engineering and Architectural Services, however, the contract provided has<br />

many references to bidders and the documentation typically required by construction contractors. Is there an<br />

alternate contract specific to professional services or will the non applicable sections be stricken before signature?<br />

Every reference to a bid or request for proposal shall be and mean the same as request for qualifications. Every<br />

reference to a contractor shall be and mean the same as consultant. The following does not apply to this contract:<br />

Pollution Liability, 1.91 Asbestos Statement.<br />

With regard to the reference form, we wish to confirm that we are to provide the form to our references, ask<br />

them to complete the reference questions and sign the form, and then we are to include these original<br />

reference documents in our response — we as respondents are to obtain the references.<br />

Yes, confirmed.<br />

Is this RFQ 2012-10 contract the same as contract 2007-O4EE, or is it a different contract?<br />

No, the contract is not the same. RFQ2O12-10 contains a more comprehensive list of disciplines and projects and will<br />

replace RFQ 2007-04.<br />

We’re a Construction Manager and would like to submit in response to this RFQ. Does NMB anticipate selecting one<br />

or more Construction Managers, for a continuing services contract, to assist NMB in executing/cost estimating for<br />

constructing some of the projects listed in Exhibit A that fall under the dollar value threshold for continuing services?<br />

This will be determined by the Review Committee.<br />

The scope of services is very diverse. Can we submit multiple 330 forms to cover the different areas? If not, is the<br />

330 limited to 10 projects?<br />

See A.3 and A.12.<br />

17011 NE 19th Aye, North Miami Beach, FL 33162 ~ 305-948-2946 ~ 305-957-3522 ~ bids citynmb.com<br />

City of North Miami Beach<br />

Page 86


Vice Pr OPe\ations Manager<br />

City of North Miami Beach, Florida<br />

Reviewed by:<br />

Procurement Management Division<br />

948-2946<br />

__________________________________________________<br />

Ackn~wIedged by:<br />

Authørtzed Rêpr~entativ~ (Printed)<br />

Chief Procurement Officer<br />

Procurement Management Division<br />

Dat~<br />

17011 NE 19° Aye, North Miami Beach, FL 33162 ~ 305-948-2946 ~ 305-957-3522 ~ bids@citynmb.com<br />

City of North Miami Beach<br />

Page 87


y of North Miami Beach, Florida<br />

Procurement Management Division<br />

948-2946<br />

M1p)<br />

~<br />

ADDENDUM TO RFQ DOCUMENTS<br />

SOLICITATION RFQ 201 2-10 CONTINUING CONTRACTS FOR PROFESSIONAL SERVICES<br />

61812012<br />

Addendum No. 4 DUE DATE 2:00PM TODAY’S DATE 6I6I2012<br />

To All Bidders:<br />

This addendum is issued to modify the previously issued REQ documents and/or given for informational purposes, and is<br />

hereby made a part of the REQ documents. Please attach this addendum to the documents in your possession and<br />

acknowledge receipt of this addendum by signing and including this form in the response package.<br />

RFI’S:<br />

1: Please kindly clarify what information is sought in the field “Warranties” of Section 6.1 “Acknowledgment Form”<br />

Al: If your firm offers warranties of your services, please provide it.<br />

.2: Form 6.4 “RFQ Signature Page for Corporation” (Pg 41) requests we provide “full names and residences of<br />

stockbrokers, persons, or firms interested in the foregoing Bid, as principals...” Can you clarify which persons or irm<br />

should be provided in response to this request?<br />

A.2: The principals of the corporation, firm or organization submitting qualifications.<br />

Q.3: Page 34, Section 3.2 Scope of Services, paragraph 1 states: “The City may select multiple qualified persons or<br />

Firms for each category of specialized services as described in Form 330.” Will the City please clarify if this<br />

corresponds to the “List of Disciplines (Function Codes)” found on pg. 6 of the attached SF330? If not, will the City<br />

please advise where a comprehensive list of categories can be found?<br />

A.3: Yes, confirmed.<br />

Q.4:<br />

A.4:<br />

Q.5:<br />

A.5:<br />

Q.6:<br />

A.6:<br />

Is the SF330 Part I, Section F, also considered to be a reference since it requires a point of contact and Telephone<br />

number. It is clear that respondents cannot use NMB projects to satisfy the five (5) required in Section 6.3, however<br />

can respondents include previous experience with the City of North Miami Beach as one of the 10 projects included<br />

within Section F of the SF330 Part I?<br />

Yes, they can.<br />

It is understood that firms are limited to submitting a total of 10 projects (within Section F) per the SF330 part I. It is<br />

also understood that each team subconsultant is required to include an SF330 as well as references for the discipline<br />

of service they are anticipated to provide. As a result, a prime firm teamed with multiple subs will have the opportunity<br />

to include more than 10 projects overall. This appears to create a disadvantage to a single firm wishing to submit for<br />

multiple disciplines. Will the City consider allowing a single firm, submitting on multiple disciplines, to submit 10<br />

projects per discipline so that it would have ample opportunity to demonstrate relevant experience as would a firm<br />

responding to one discipline?<br />

Firms are allowed to submit 10 projects per discipline.<br />

Addendum 1; Q3 — Are sub-consultants required to submit City’s Reference Questionnaire form 6.3 as well as the<br />

Prime Consultant?<br />

Yes.<br />

17011 NE 19t~~ Aye, North Miami Beach, FL 33162 ~ 305-948-2946 ~ 305-957-3522 ~ bids~citynmb.com<br />

City of North Miami Beach<br />

Page 88


City of North Miami Beach, Florida<br />

Procurement Management Division<br />

948-2946<br />

Q.7:<br />

A.7:<br />

Q.8:<br />

A.8:<br />

Q.9:<br />

A.9:<br />

Q.10:<br />

A.10:<br />

Addendum 3; Q7 — Form 330 is created on a government forms software with same information as noted on the RFQ<br />

but slightly different look. Confirm that the government form software is also acceptable.<br />

The City will accept this version as long as the same information required is submitted and if the differences are<br />

cosmetic.<br />

Is it admissible to use the SF 330 form issued by the GSA or is the only form permitted the one include in the REQ<br />

package?<br />

The form included in the RFQ package is issued by GSA. If you are refer~ng to the pdf version also issued by GSA,<br />

then yes, the City will accept it.<br />

We have reviewed item 1.36 Indemnification and Hold Harmless Agreement for REQ No. 2012-10 Continuing<br />

Contract for Professional Services for North Miami Beach and find that it does not comply with Chapter 725 of the<br />

Florida Statutes. Will the City modify its indemnification language to comply with Chapter 725.08 of the Florida<br />

Statutes?<br />

This question will be answered in a subsequent addendum.<br />

Do we need to have a vendor number before submitting our qualification package?<br />

No, your vendor registration form may be submitted along with your qualification package.<br />

Q.1 1: Some departments within Miami Dade County are restricted from provide references. Please advise if past<br />

references directed to third parties could be used to satisfy this request.<br />

A.1 1: Past references directed to third parties will not be accepted.<br />

Q.12:<br />

A.12:<br />

In regards to the five references requested on form 6.3 Reference Questionnaire, should these five references<br />

include one for our subcontractor or should all five references be for the prime?<br />

<strong>Inc</strong>lude five references questionnaires for the prime and five for your subcontractor.<br />

Q.13: Are sub-section tabs allowed to be used in a firm’s submittal, beyond the listed sections on page 36.<br />

A.13: Yes.<br />

Reviewed by:<br />

ADDITIONS<br />

- National Pollutant Discharge Elimination System (NPDS) compliance study is being added to the list of projects.<br />

-. T~-&~Tec-~<br />

- \1~C~.<br />

__________________________________________________<br />

lv~c.,.<br />

Acknowledged by:<br />

ie.<br />

Authorized he resentative (Prsr?ted<br />

Chief Procurement Officer Title Ff%~ ~ ~<br />

Procurement Management Division<br />

S<br />

Date<br />

naiur<br />

17011 NE 19th Aye, North Miami Beach, FL 33162 ~ 305-948-2946 ~ 305-957-3522 ~ bids citynmb.com<br />

City of North Miami Beach<br />

Page 89


City of North Miami Beach, Florida<br />

Procurement Management Division<br />

948-2946<br />

_o~~ ~<br />

C<br />

ADDENDUM TO RFQ DOCUMENTS<br />

SOLICITATION RFQ 2012-10 CONTINUING CONTRACTS FOR PROFESSIONAL SERVICES<br />

612212012<br />

Addendum No. 5 DUE DATE 2:00PM TODAY’S DATE 6I6I2012<br />

To All Bidders:<br />

This addendum is issued to modify the previously issued REQ documents and/or given for informational purposes, and is<br />

hereby made a part of the REQ documents. Please attach this addendum to the documents in your possession and<br />

acknowledge receipt of this addendum by signing and including this form in the response package.<br />

DUE DATE EXTENSION<br />

The Due Date for this REQ has been extended. The New Due Date and time is June, 22, 2012 at 2:00pm. The address is the<br />

same: 17011 NE 19th Ave Room 315, North Miami Beach, EL 33162.<br />

Reviewed by:<br />

______________________________________________________<br />

Ac n~wIedged by:<br />

Chief Procurement Officer<br />

T t e<br />

Procurement Management Division ~ —~<br />

~iL~<br />

Authori ed Representative (Printed)<br />

b - ,<br />

Date<br />

17011 NE 19th Aye, North Miami Beach, FL 33162 ~ 305-948-2946 ~ 305-957-3522 ~ bids citynmb.com<br />

City of North Miami Beach<br />

Page 90


City of North Miami Beach, Florida<br />

Procurement Management Division<br />

948-2946<br />

.4<br />

ADDENDUM TO RFQ DOCUMENTS<br />

SOLICITATION RFQ 2012-10 CONTINUING CONTRACTS FOR PROFESSIONAL SERVICES<br />

612212012<br />

Addendum No. 6 DUE DATE 2:00PM TODAY’S DATE 6I11I2012<br />

To All Bidders:<br />

This addendum is issued to modify the previously issued REQ documents and/or given for informational purposes, and is<br />

hereby made a part of the REQ documents. Please attach this addendum to the documents in your possession and<br />

acknowledge receipt of this addendum by signing and including this form in the response package.<br />

RFI’S:<br />

Qi: I am preparing a proposal for the City of North Miami Beach (REQ 2012-10), however, I am unable to find a logo that<br />

has a good resolution for printing, is this something that you can assist me with?<br />

Al: You may use the City of North Miami Beach logo in your proposal package only. You may e-mail your request at<br />

bids~citynmb.com.<br />

Q.2:<br />

A.2:<br />

We have reviewed item 1.36 Indemnification and Hold Harmless Agreement for REQ No. 2012-10 Continuing<br />

Contract for Professional Services for North Miami Beach and find that it does not comply with Chapter 725 of the<br />

Florida Statutes. Will the City modify its indemnification language to comply with Chapter 725.08 of the Florida<br />

Statutes?<br />

Add the following language to Section 1.36 Indemnification and Hold Harmless Agreement: The forgoing<br />

indemnification is limited by Section 725.08 (2) Ela Stat. for the part of the contract which is a professional services<br />

contract as defined in Section 725.08, Ela. Stat.<br />

Q.3: Please define Discipline.<br />

A.3: See Standard Eorm 330, page 1.<br />

Q.4: Regarding conflicts between Addendum No.3; A.12 and Addendum No.4; A5.<br />

A.4: Addendum No.3; A.12 prevails. See also Addendum No.1; A.8.<br />

Reviewed by:<br />

______________________________________________________<br />

Ackn~wIedged by:<br />

<strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>.<br />

PE<br />

Authori~d R~pr~.entative (Printed<br />

— — —--------------- Vice Presi.ent/Operation Manager<br />

Chief Procurement Officer<br />

T t e<br />

Procurement Management Division • —~~-- —~<br />

Date<br />

- 19, 2012<br />

17011 NE 19tb Aye, North Miami Beach, FL 33162 V 305-948-2946 ~ 305-957-3522 ~ bids citynmb.com<br />

City of North Miami Beach<br />

Page 91


RFQ No 2012-10 Continuing Contract for Professional Services<br />

SECTION 6.0 CITY REQUIRED FORMS<br />

6.1 ACKNOWLEDGEMENT FORM<br />

NAME OF COMPANY:<br />

SIGNA.<br />

(Sign in<br />

TITLE: Vice<br />

Jon Fox, PE<br />

(Print Name)<br />

_________<br />

Mana~rMAlL ADDRESS: jon.foxt~tetratech.com<br />

ADDRESS: 201 E. Pine Street, Ste. 1000. Orlando, FL 32801<br />

TELEPHONE NO.: (407) 839-3955 FAX NO.: ___________<br />

(407) 839-3790<br />

By signing and submitting this submittal, we acknowledge having read and agreeing to all times and conditions of<br />

these specifications, including, but not limited to, agreeing to indemnify and hold the City harmless from any and all<br />

claims, suits, actions, damages, causes of action, or attorney’s fees arising from any personal injury, loss of life, or<br />

damage to person or property sustained by reason of or as a result of the products or services supplied, or<br />

negligence of contractor supplier, his employees, agents, or assigns.<br />

By signing and submitting this bid proposal, we certify that this company has current insurance coverage specified<br />

herein. The insurance policy number(s) and expiration date(s) are provided below, or copies of the insurance<br />

certificate(s) are enclosed. If awarded the contract, we will provide the City with proof of the required insurance and<br />

include the City as an additional insured on our general liability coverage.<br />

Do you give prompt payment discounts?<br />

DYes, Percentage of discount ____.___% Term__________ ~No<br />

I certify that this submittal is made without prior understanding, agreement or connection with any corporation, firm,<br />

or person submitting a proposal for the same materials, supplies, or equipment, and is in all respects fair and<br />

without collusion or fraud. I agree to abide by all conditions of this bid and certify that I am authorized to sign this bid<br />

for the bidder.<br />

INSURANCE POLICY NO(S): Copy provided on following page(s)<br />

EXPIRATION DAT<br />

(S):_____________________________________<br />

INSUR CE TI ATE(S) ENCLOSED: x YES NO<br />

__________________________________<br />

Jon Fox, PE, Vice President/Operations Manager<br />

NTIES (Sign In Ink) (Print Name)<br />

Any specific warranty provided for in the contract shall be limited to the provision of services in accordance with the industry standard (NOT<br />

the Thighest’ industry standard) for the type of services provided. For engineering services, the standard would be in conformance with the<br />

services provided by an experienced and competent professional engineering organization rendering the same or similar services. Any<br />

specific warranty provided for in the contract related to remedial work shall also be limited in terms of a dollar ceiling, and time frame not to<br />

exceed one year after compledon of remediation services.<br />

If the undersigned contractor is awarded a construction Agreement on this Proposal, the Surety who will provide the<br />

Public Construction Payment and Performance Bond will be:<br />

Safeco Ins Co of America<br />

whose address is<br />

1001 4th Ave., Ste. 1700, Seattle, WA<br />

Zip Code__98154<br />

Page 38 of 69<br />

Page 92


CERTIFICATE OF LIABILITY INSURANCE<br />

DATE(MM/DD/YYYY)<br />

12/08/2011<br />

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS<br />

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES<br />

BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED<br />

REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.<br />

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to<br />

the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the<br />

certificate holder in lieu of such endorsement(s).<br />

PRODUCER<br />

Aon Risk Insurance Services West, <strong>Inc</strong>.<br />

Los Angeles CA Office<br />

707 Wilshire Boulevard<br />

Suite 2600<br />

Los Angeles CA 90017-0460 USA<br />

CONTACT<br />

NAME:<br />

PHONE<br />

(A/C. No. Ext):<br />

E-MAIL<br />

ADDRESS:<br />

(866) 283-7122<br />

FAX (847) 953-5390<br />

(A/C. No.):<br />

INSURER(S) AFFORDING COVERAGE NAIC #<br />

Holder Identifier :<br />

INSURED<br />

<strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>.<br />

201 East Pine Street<br />

Orlando FL 32801 USA<br />

INSURER A:<br />

INSURER B:<br />

INSURER C:<br />

INSURER D:<br />

National Union Fire Ins Co of Pittsburgh<br />

Insurance Company of the State of PA<br />

Chartis Specialty Insurance Company<br />

Lexington Insurance Company<br />

19445<br />

19429<br />

26883<br />

19437<br />

INSURER E:<br />

INSURER F:<br />

COVERAGES CERTIFICATE NUMBER: 570044594400 REVISION NUMBER:<br />

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD<br />

INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS<br />

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,<br />

EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.<br />

Limits shown are as requested<br />

INSR<br />

LTR<br />

TYPE OF INSURANCE<br />

ADDL SUBR<br />

INSR WVD<br />

POLICY NUMBER<br />

POLICY EFF<br />

(MM/DD/YYYY)<br />

POLICY EXP<br />

(MM/DD/YYYY)<br />

LIMITS<br />

A<br />

GENERAL LIABILITY<br />

GL4871170<br />

10/01/2011 10/01/2012 EACH OCCURRENCE<br />

X COMMERCIAL GENERAL LIABILITY<br />

DAMAGE TO RENTED<br />

PREMISES (Ea occurrence)<br />

CLAIMS-MADE X OCCUR<br />

MED EXP (Any one person)<br />

X X,C,U Coverage<br />

PERSONAL & ADV INJURY<br />

GENERAL AGGREGATE<br />

GEN'L AGGREGATE LIMIT APPLIES PER:<br />

PRODUCTS - COMP/OP AGG<br />

POLICY X<br />

PRO-<br />

JECT<br />

X LOC<br />

A AUTOMOBILE LIABILITY<br />

CA 170 73 88<br />

10/01/2011 10/01/2012 COMBINED SINGLE LIMIT<br />

(Ea accident)<br />

X ANY AUTO<br />

BODILY INJURY ( Per person)<br />

ALL OWNED SCHEDULED<br />

BODILY INJURY (Per accident)<br />

X<br />

AUTOS<br />

AUTOS<br />

PROPERTY DAMAGE<br />

HIRED AUTOS X<br />

NON-OWNED<br />

(Per accident)<br />

AUTOS<br />

$1,000,000<br />

$1,000,000<br />

$10,000<br />

$1,000,000<br />

$2,000,000<br />

$2,000,000<br />

$1,000,000<br />

D X UMBRELLA LIAB X OCCUR<br />

TH1100027<br />

10/01/2011 EACH OCCURRENCE<br />

$5,000,000<br />

EXCESS LIAB<br />

CLAIMS-MADE<br />

AGGREGATE<br />

$5,000,000<br />

DED RETENTION<br />

B WORKERS COMPENSATION AND<br />

WC20635697<br />

10/01/2011 10/01/2012 WC STATU-<br />

X<br />

OTH-<br />

TORY LIMITS ER<br />

B EMPLOYERS' LIABILITY<br />

Y / N<br />

WC20635698<br />

10/01/2011 10/01/2012<br />

ANY PROPRIETOR / PARTNER / EXECUTIVE<br />

E.L. EACH ACCIDENT $1,000,000<br />

B OFFICER/MEMBER EXCLUDED?<br />

N N / A WC20635699<br />

10/01/2011 10/01/2012<br />

(Mandatory in NH)<br />

E.L. DISEASE-EA EMPLOYEE<br />

$1,000,000<br />

If yes, describe under<br />

DESCRIPTION OF OPERATIONS below<br />

E.L. DISEASE-POLICY LIMIT<br />

$1,000,000<br />

C Contractor Prof<br />

COPS1952583 10/01/2011 10/01/2012 Each Clain<br />

$5,000,000<br />

Prof/Poll Liab Agggregate<br />

$5,000,000<br />

DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required)<br />

Evidence of Insurance. Project Start Date: 10/01/11, Project End Date: 10/01/12. Stop Gap Coverage for the following states:<br />

OH, WA, WY.<br />

CERTIFICATE HOLDER<br />

<strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>.<br />

201 E Pine Street, Suite 1000<br />

Orlando FL 32801 USA<br />

CANCELLATION<br />

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE<br />

EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE<br />

POLICY PROVISIONS.<br />

AUTHORIZED REPRESENTATIVE<br />

7777777707070700077763616065553330770637577237455607742104663435111072773457356311330747373712657322107526637130272110075040135762745700776621711243655407506633530272310077727252025773110777777707000707007<br />

6666666606060600062606466204446200620002604226202006002006262040020062222062620622020600222626024220006200024262060000062222242600420220602220626226000206202226242062220066646062240664440666666606000606006 Certificate No : 570044594400<br />

ACORD 25 (2010/05)<br />

©1988-2010 ACORD CORPORATION. All rights reserved.<br />

The ACORD name and logo are registered marks of ACORD<br />

Page 93


RFQ No. 2012-10 Continuing Contract for Professional Services<br />

6.2 STATEMENT OF “NO” BID/RFQ<br />

N/A<br />

If your company shall not be submitting a response to this Request for Proposal (RFQ), please complete this<br />

Statement of “No” Bid Sheet and return, prior to the RFQ Due Date established within, to:<br />

The City of North Miami Beach<br />

Procurement Management Division, Room 315<br />

17011 NE 19th Avenue<br />

North Miami Beach, Florida 33162<br />

This information shall help the City of North Miami Beach in the preparation of future Bids and RFP's.<br />

Bid/RFP/RFQ Number: ____________________________ Title: ________________________<br />

Company Name: ____________________________________________________<br />

Contact: __________________________________________________________<br />

Address: __________________________________________________________<br />

E-Mail: __________________________________________________________<br />

Telephone: ____________________________ Facsimile: ____________________<br />

√<br />

Reasons for “NO” Bid:<br />

Unable to comply with product or service specifications.<br />

Unable to comply with scope of work.<br />

Unable to quote on all items in the group.<br />

Insufficient time to respond to the Invitation to Bid.<br />

Unable to hold prices firm through the term of the contract period.<br />

Our schedule would not permit us to perform.<br />

Unable to meet delivery requirements.<br />

Unable to meet bond requirements.<br />

Unable to meet insurance requirements.<br />

Other (Specify below)<br />

Comments: _____________________________________________________________<br />

Page 39 of 69<br />

Page 94


Page 95


Page 96


Page 97


Page 98


RFQ No. 2012-10 Continuing Contract for Professional Services<br />

6.3 REFERENCE QUESTIONNAIRE<br />

It is the responsibility of the contractor/vendor to provide a minimum of five (5) government agency references other than<br />

North Miami Beach using this form and providing this information with your submission. Failure to do so may result in the<br />

rejection of your submission.<br />

Giving reference for: (Bidder)<br />

<strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>.<br />

Firm giving Reference: Toho Water Authority<br />

Address: 951 Martin Luther King Jr. Blvd. 3 rd Floor, Kissimmee, FL 34741<br />

Phone: 407.944.5023<br />

Fax: 407.343.4264<br />

Email: deb.beatty@tohowater.com<br />

1. Q: What was the title of the contract or job assigned to Bidder?<br />

A: Westside Wastewater and Reuse Transmission Mains<br />

2. Q: What was the scope or work/services assigned to Bidder?<br />

A: Approximately 17,000 LF of 24” DIP and 30” HDPE Force Main and17,000 LF of 24” DIP and 30” HDPE Reuse<br />

Main<br />

3. Q: What was the dollar value of the contract?<br />

A: $4,977,047.60<br />

4. Q:Have there been any change orders, and if so how many?<br />

A: One Change Order; Final Quantities Adjustment – Additive CO in the amount of $22,207.60<br />

5. Q: Do they perform on a timely basis as required by the agreement?<br />

A: Yes; very responsive to the both the owner and contractor<br />

6. Q: Was the project manager easy to get in contact with?<br />

A: Yes; readily available to both the owner and contractor to discuss and resolve issues<br />

7. Q: Would you use them again?<br />

A: Yes<br />

8. Q: Overall, what would you rate their performance? (Scale from 1-5): 5<br />

A: 5 Excellent 4 Good 3 Fair 2 Poor 1 Unacceptable<br />

9. Q: Is there anything else we should know, that we have not asked?<br />

A: Competent and responsive<br />

The undersigned does hereby certify that the foregoing and subsequent statements are true and correct and are made<br />

independently, free from vendor interference/collusion.<br />

Name: Deborah Beatty Title Senior Project Manager<br />

Print Name: Deborah Beatty, PE Date: 05/14/12<br />

Page 40 of 69<br />

Page 99


Page 100


Page 101


RFQ No. 2012-10 Continuing Contract for Professional Services<br />

6.4 RFQ SIGNATURE PAGE FOR CORPORATION<br />

The officers of the Corporation are as follows:<br />

NAME<br />

ADDRESS<br />

President Dan L. Batrack 3475 E. Foothill Blvd., Pasadena, CA 91107<br />

Vice-President Douglas G. Smith 1900 S. Sunset, Ste. iF, Longmont, CO 80501<br />

Secretary Janis B. Salin 3475 E. Foothill Blvd., Pasadena, CA 91107<br />

Treasurer Steven M. Burdick 3475 E. Foothill Blvd., Pasadena, CA 91107<br />

Registered Agent CT Corporation System<br />

The full names and residences of stockbrokers, persons, or firms interested in the foregoing Bid, as principals, are as<br />

follows:<br />

N/A<br />

Post Office Address<br />

BIDDER:<br />

<strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>.<br />

(CORPORATE NAME)<br />

-~ crJ~ d~~Z.~ebra.mcmillin@tetratech.com<br />

PRESIDENT SIGNATURE AND E-MAIL ADDRESS<br />

Is this corporation incorporated in the State pf Florida?<br />

ATTEST:<br />

YES[]<br />

c1~?Z1~A4 iø~<br />

~/ SECRETARY<br />

NO[~J<br />

If no, give address of principal place of business: 3475 E. Foothill Blvd.<br />

Pasadena, CA 91107<br />

Page 41 of 69<br />

Page 102


RFQ No. 2012-10 Continuing Contract for Professional Services<br />

6.5 RFQ SIGNATURE PAGE FOR SOLE PROPRIETOR OR PARTNERSHIP N/A<br />

The full names and residences of persons, partners or firms interested in the foregoing Bid, as principals, are as<br />

follows:<br />

______________________________________ ___________________________<br />

______________________________________ ___________________________<br />

______________________________________ ___________________________<br />

______________________________________ ___________________________<br />

______________________________________ ___________________________<br />

BIDDER<br />

____________________________________<br />

(FIRM NAME)<br />

Witnesses:<br />

(SEAL)<br />

__________________________________________________________________<br />

SIGNATURE AND E-MAIL ADDRESS<br />

__________________________________________________________________<br />

PRINT NAME<br />

____________________________________<br />

Title (Sole Proprietor or Partner)<br />

Post Office Address:<br />

____________________________________<br />

____________________________________<br />

TELEPHONE<br />

CITY in which fictitious name is registered.<br />

___________________________________<br />

Attach a copy of proof of registration<br />

Page 42 of 69<br />

Page 103


RFQ No. 2012-10 Continuing Contract for Professional Services<br />

66 DRUG-FREE WORKPLACE PROGRAM<br />

IDENTICAL TIE BIDS - Preference shall be given to businesses with drug-free workplace programs. Whenever two<br />

or more bids which are equal with respect to price, quality, and service are received by the State or by any political<br />

subdivision for the procurement of commodities or contractual services, a bid received from a business that<br />

certifies that it has implemented a drug-free workplace program shall be given preference in the award<br />

process. Established procedures for processing tie bids will be followed if none of the tied vendors have a drug-free<br />

workplace program. In order to have a drug-free workplace program, a business shall:<br />

1. Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use<br />

of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees<br />

for violations of such prohibition.<br />

2. Inform employees about the dangers of drug abuse in the workplace, the business’s policy of maintaining drug-free<br />

workplace, any available drug counseling, rehabilitation, and employee assistance programs, and the penalties<br />

that may be imposed upon employees for drug abuse violations.<br />

3. Give each employee engaged in providing the commodities or contractual services that are under bid a copy of the<br />

statement specified in subsection (1).<br />

4. In the statement specified in subsection (1), notify the employee that, as a condition of working on the<br />

commodities or contractual services that are under bid, the employee will abide by the terms of the statement and will<br />

notify the employer of any conviction of, or plea of guilty or nob contendere to, any violation of chapter 893 or of any<br />

controlled substance law of the United States or any state, for a violation occurring in the workplace no later than five<br />

(5) days after such conviction.<br />

5. Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or rehabilitation program if<br />

such is available in the employee’s community, by any employee who is so convicted.<br />

6. Make a good faith effort to continue to maintain a drug-free workplace through implementation of this section.<br />

As the person thorized to sign the statement, I certify that this firm complies fully with the above requirements.<br />

___________________________________ Jon Fox, PE, Vice President/Operations Manager<br />

V DOR’S IGNATUR PRINTED NAME<br />

<strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>.<br />

NAME OF COMPANY<br />

Page 43 of 69<br />

Page 104


RFQ No. 2012-10 Continuing Contract for Professional Services<br />

6.7 SOLICITATION, GIVING, AND ACCEPTANCE OF GIFTS POLICY<br />

Florida Statute 112.313 prohibits the solicitation or acceptance of Gifts. - “No Public officer, employee of an<br />

agency, or candidate for nomination or election shall solicit or accept anything of value to the recipient,<br />

including a gift, loan, reward, promise of future employment, favor, or service, based upon any understanding that<br />

the vote, official action, or judgment of the public officer, employee, or candidate would be influenced thereby.”...<br />

The term ‘public officer’ includes any person elected or appointed to hold office in any agency, including any person<br />

serving on an advisory body.”<br />

The City of North Miami Beach policy prohibits all public officers, elected or appointed, all employees, and their<br />

families from accepting any gifts of any value, either directly or indirectly, from any contractor, vendor, consultant,<br />

or business with whom the City does business. Only advertising office stationery or supplies of small value are<br />

exempt from this policy - e.g. calendars, note pads, pencils.<br />

The State of Florida definition of “gifts” includes the following:<br />

Real property or its use,<br />

Tangible or intangible personal property, or its use,<br />

A preferential rate of terms on a debt, loan, goods, or services,<br />

Forgiveness of indebtedness,<br />

Transportation, lodging, or parking,<br />

Membership dues,<br />

Entrance fees, admission fees, or tickets to events, performances, or facilities,<br />

Plants, flowers or floral arrangements<br />

Services provided by persons pursuant to a professional license or certificate. Other personal services for which a<br />

fee is normally charged by the person providing the services. Any other similar service or thing having an<br />

attributable value not already provided for in this section. To this list, the City of North Miami Beach has added food,<br />

meals, beverages, and candy.<br />

Any contractor, vendor, consultant, or business found to have given a gift to a public officer or employee, or his/her<br />

family, will be sub - ct to dismissal or revocation of contract.<br />

As th- - rson auth nzed to sign the statement, I certify that this firm will comply fully with this policy.<br />

_iII_.. .<br />

Jon Fox, PE<br />

-. .E PRINTED NAME<br />

<strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>.<br />

NAME OF COMPANY<br />

Vice President/Operations Manager<br />

TITLE<br />

Failure to sign this page shall render your bid non-responsive<br />

Page 44 of 69<br />

Page 105


6.8 Vendor Registration, Certification, Minority<br />

Business Statement<br />

<strong>Tetra</strong> <strong>Tech</strong> will make a good faith effort to contract with Minority/Woman-Owned businesses.<br />

<strong>Tetra</strong> <strong>Tech</strong> is not a Minority/Women-Owned Business Enterprise. However, it should be noted that <strong>Tetra</strong> <strong>Tech</strong><br />

presently utilizes a number of minority and women-owned businesses (M/WBE) in our everyday work efforts in<br />

order to complete a wide range of projects. In an effort to continue to support State and Local M/WBE programs,<br />

<strong>Tetra</strong> <strong>Tech</strong> well make a good faith effort to utilize a M/WBE for contract services.<br />

Page 106


RFQ No. 2012-10 Continuing Contract for Professional Services<br />

6.9 NONCOLLUSION AFFIDAVIT<br />

STATE OF:<br />

COUNTY OF:<br />

Florida<br />

Miami-Dade County<br />

Jon Fox, PE , being first duly sworn, deposes and says that:<br />

(1) He/she is Vice President/Operations Manag~f <strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>. , the Bidder that has submitted the<br />

attached Bid.<br />

(2) Bidder has been fully informed regarding the preparation and contents of the attached Bid and of all pertinent<br />

circumstances regarding such Bid;<br />

(3) Such Bid is genuine and is not a collusion or sham Bid;<br />

(4) Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in<br />

interest, including this afflant has in any way colluded, conspired, connived or agreed, directly or indirectly with any<br />

other Bidder, firm or person to submit a collusive or sham Bid in connection with the contractor for which the<br />

attached Bid has been submitted or to refrain from bidding in connection with such contract, or has in any manner,<br />

directly or indirectly, sought by agreement or collusion or communication or conference with any other Bidder, firm<br />

or person to fix the price or prices, profit or cost element of the Bid price or the Bid price of any other Bidder, or to<br />

secure through advantage against the City of North Miami Beach (Local Public Agency) or any person interested<br />

in the proposed Contract; and<br />

(5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy,<br />

connivance or unlawful agreement on the part of the Bidder or any of its agents, representatives, owners,<br />

employees, o •arties interest, including this affiant.<br />

(SIGNED ~ —<br />

Title ~~jI~~dentIOpe ations Manager<br />

Subsc~bed and sworn to before me this~~ ~<br />

My commission expires:<br />

&)<br />

S1AT& Q(~<br />

OF<br />

Or~~<br />

A<br />

ErikaDBoolcer<br />

~%<br />

My<br />

Notary<br />

Commisalon<br />

Public State<br />

EE<br />

of<br />

191530<br />

Expires 0412312016 Flodda<br />

Page 46 of 69<br />

Page 107


RFQ No. 2012-10 Continuing Contract for Professional Services<br />

6.10 SOURCE OF INFORMATION<br />

How did you find out about this solicitation? Check all that applies.<br />

1. www.citynmb.com<br />

2. www.demandstar.com<br />

X<br />

3. Daily Business Review<br />

4. The Miami Herald<br />

5.Referral/word- of mouth<br />

Specify Source: _____________________<br />

6.Search Engine/Internet search<br />

7.E-mail, newsgroup, online chat<br />

Specify Source:______________________<br />

8.Banner or Link on another website<br />

9.Flyer, newsletter, direct mail<br />

Other<br />

Specify Source:______________________<br />

Specify Source:______________________<br />

Page 47 of 69<br />

Page 108


City of North Miami Beach, Florida<br />

Procurement Management Division<br />

948-2946<br />

7.3 RESPONDENTS CERTIFICATION<br />

I<br />

have carefully examined the Request for Qualification.<br />

I hereby propose to furnish the services specified in the Request for Qualification. I agree that my submittal will remain firm<br />

for a period of at least 365 days in order to allow the City adequate time to evaluate the submittals and determine a ranking<br />

of the most qualified firms.<br />

I certify that all information contained in this submittal is truthful. I further certify that I am duly authorized to provide this<br />

submittal on behalf of the firm as its act and deed and that the firm is ready, willing and able to perform if awarded the<br />

contract.<br />

I further certify, under oath, that this submittal is made without prior understanding, agreement, connection, discussion, or<br />

collusion with any other person, firm or corporation tendering a submittal for the same service; that no officer, employee or<br />

agent of the City of North Miami Beach or any other respondent is interested in said submittal; and that the undersigned<br />

executed this Respondent’s Certification with full knowledge and understanding of the matters therein contained and was<br />

duly authorized to do so.<br />

<strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>.<br />

Name of Business<br />

BY:<br />

Sworn to and subscribed before me<br />

this _____ day of ‘3U’fl-~~~ ,<br />

Jon Fox, PE, Vice President/Operations Manager<br />

Name and Title, Typed or Printed<br />

201 East Pine Street, Suite 1000<br />

Mailing Address<br />

Orlando, Florida 32801<br />

City, State, Zip Code<br />

407 ) 839-3955<br />

Telephone Number<br />

—~-— —<br />

Notary Public<br />

STATE OF<br />

rL.(2 ~e413J-~oqI~~3)~oi(,<br />

My Commission Expires<br />

at ~odda<br />

My Commissjoq1 EE 191530<br />

Expwea 0412312016<br />

17011 NE 19th Aye, North Miami Beach, FL 33162 ~ 305-948-2946 ~ 305-957-3522 ~ bids~citynmb.com<br />

City of North Miami Beach Page 109


City of North Miami Beach, Florida<br />

Procurement Management Division<br />

948-2946<br />

7.4 SWORN STATEMENT ON PUBLIC ENTITY CRIMES<br />

THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL<br />

AUTHORIZED TO ADMINISTER OATHS.<br />

1. This sworn statement is submitted to the CITY OF NORTH MIAMI BEACH, FLORIDA<br />

by: Jon Fox, PE, Vice President/Operations Manager<br />

(print individual’s name and title)<br />

for: <strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>.<br />

(print name of entity submitting sworn statement)<br />

whose business address is: 201 East Pine St. Ste 1000, Orlando, FL 32801<br />

and (if applicable) its Federal Employer Identification Number (FEIN) is: 95-4148514<br />

(If the entity has no FEIN, include the Social Security Number of the individual signing this sworn statement: ________-<br />

2. I understand that a “public entity crime” as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or<br />

federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or<br />

political subdivision of any other state or of the United States, including but not limited to, any bid or contract for goods or services<br />

to be provided to any public entity or an agency or political subdivision of any other state or of the United States and involving<br />

antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentations.<br />

3. I understand that “convicted” or “conviction” as defined in Paragraph 287.133(1)(b), Florida Statutes, means a finding of guilt or a<br />

conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trial court of record relating to<br />

charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non-jury trial, or entry of a plea of guilty<br />

or nob contendere.<br />

4. I understand that an “affiliate” as defined in Paragraph 287.133(1)(a), Florida Statutes, means:<br />

1. A predecessor or successor of a person convicted of a public entity crime; or<br />

2. An entity under the control of any natural<br />

person who is active in the management of the entity and who has been convicted of a public entity crime. The term “affiliate”<br />

includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in the<br />

management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a<br />

pooling of equipment or income among persons when not for fair market value under an arm’s length agreement, shall be a<br />

prima facie case that one person controls another person. A person who knowingly enters into a joint venture with a person<br />

who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate.<br />

5. I understand that a “person” as defined in Paragraph 287.133(1)(e), Florida Statutes, means any natural person or entity<br />

organized under the laws of any state or of the United States with the legal power to enter into a binding contract and which<br />

bids or applies to bid on contracts for the provision of goods or services let by a public entity, or which otherwise transacts or<br />

applies to transact business with a public entity. The term “person” includes those officers, directors, executives, partners.<br />

Shareholders, employees, members, and agents who are active in management of an entity.<br />

6. Based on information and belief, the statement, which I have marked below, is true in relations to the entity submitting this<br />

sworn statement. (Indicate which statement applies).<br />

XJ Neither the entity submitting this sworn statement, nor any of its officers, directors, executives, partners, shareholders,<br />

employees, members, or agents who are active in the management of the entity, nor any affiliate of the entity has been<br />

charged with ad convicted of a public entity crime subsequent to July 1, 1989.<br />

• The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders,<br />

employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been<br />

charged with and convicted of a public entity crime subsequent to July 1, 1989.<br />

• The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders,<br />

employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been<br />

charged with and convicted of a public entity crime subsequent to July 1, 1989. However, there has been a subsequent<br />

proceeding before a Hearing Officer of the State of Florida, Division of Administrative Hearings and the final Order entered<br />

by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on<br />

the convicted vendor list (attach a copy of the final order).<br />

I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC<br />

ENTITY IDENTIFIED IN PARAGRAPH 1 ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND THAT THIS FORM IS VALID<br />

THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I ALSO UNDERSTAND THAT I AM<br />

REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE<br />

THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES FOR CATEGORY TWO OF ANY<br />

CHANGE IN THE INFORMATION CONTAINED IN THIS FORM.<br />

17011 NE 19th Aye, North Miami Beach, FL 33162 V 305-948-2946 ~ 305-957-3522 ~ bids citynmb.com<br />

City of North Miami Beach Page 110


City of North Miami Beach, Florida<br />

Procurement Management Division<br />

948-2946<br />

Sworn to and subscribed before me this (1 day of<br />

,20 La..<br />

Ilk__<br />

Produced identification _____________________________<br />

Type of identification<br />

public<br />

Notary Public — State of<br />

rt~o et VA-<br />

My commission expires:


E.2 Subcontractor Plan/Good Faith Effort<br />

<strong>Tetra</strong> <strong>Tech</strong> well makes a good faith effort to contract for survey and geotechnical services.<br />

<strong>Tetra</strong> <strong>Tech</strong> is not a Minority/Women-Owned Business Enterprise. However, it should be noted that <strong>Tetra</strong><br />

<strong>Tech</strong> presently utilizes a number of minority and women-owned businesses (M/WBE) in our everyday work<br />

efforts in order to complete a wide range of projects. In an effort to continue to support State and Local<br />

M/WBE programs, <strong>Tetra</strong> <strong>Tech</strong> well make a good faith effort to utilize a M/WBE for contract services.<br />

Page 112


Exceptions to Proposal Provisions<br />

EXCEPTIONS TO PROPOSAL PROVISIONS<br />

As provided in the Request for Qualifications Section 1.34, Exceptions to Proposal, <strong>Tetra</strong> <strong>Tech</strong> respectfully<br />

requests that the following revisions be made to the General, Special and <strong>Tech</strong>nical Conditions of RFQ No.:<br />

2012-10, Continuing Contract for Professional Services.<br />

• Section 1.36 Indemnification and Hold Harmless Agreement. In accordance with Chapter 725, Florida<br />

Statutes, the Contractor hall indemnify and hold harmless the City of North Miami Beach and its officers,<br />

employees, agents and instrumentalities from any and all liability, losses or damages in an amount not less<br />

than $1,000,000 per occurrence. In addition to $1,000,000 per occurrence, the City shall be entitled to<br />

attorney’s fees and costs of defense, which the City of North Miami Beach, or its officers, employees, agents<br />

or instrumentalities may incur as a result of claims, demands, suits, causes of actions or proceedings of any<br />

kind or nature arising out of, relating to or resulting from the negligent acts, errors, or omission of<br />

performance of this project by the awarded bidder or its employees, agents, servants, partners, principals or<br />

subcontractors. Furthermore, the awarded bidder shall pay all claims and losses in an amount not less than<br />

$1,000,000 per occurrence in connection therewith and shall investigate and defend all claims, suits or<br />

actions resulting from Contractor’s negligent acts, errors, or omissions of any kind of nature in the name of<br />

the City of North Miami Beach, where applicable, including appellate proceedings, and shall pay all costs,<br />

judgments, and attorney’s fees which may issue thereon. The awarded bidder expressly understands and<br />

agrees that any insurance protection required by the resulting agreement or otherwise provided by the<br />

awarded bidder shall cover the City of North Miami Beach, its officers, employees, agents and<br />

instrumentalities and shall include claims for damages resulting from and/or caused by the negligence,<br />

recklessness or intentional wrongful misconduct of the indemnifying party and persons employed or by<br />

utilized by the indemnifying party in the performance of the contract.<br />

• Section 1.65 Guarantee. The Contractor shall be responsible for technically deficient designs, reports, or<br />

studies due to his errors and omissions, and shall promptly correct or replace all such deficient work due to<br />

his errors and omissions without cost to City upon the request of the City for five years after the date of<br />

acceptance of the project by the City, which are judged to have been in error by a court of competent<br />

jurisdiction. Contractor shall also be responsible for the cost of correcting deficient construction which was<br />

built from technically deficient designs to the extent that such work does not add value to the project upon<br />

completion. Payment in full by the City for work performed does not constitute a waiver of this guarantee.<br />

• 1.66 Manner of Performance, A. The Contractor shall provide the Services described herein with the skill<br />

and care ordinarily exercised by design professionals performing similar work in a competent and<br />

professional manner satisfactory to the City in accordance with the terms and conditions of this Agreement.<br />

The City shall be entitled to a satisfactory performance of all Services described herein and to full and prompt<br />

cooperation by the Contractor in all aspects of the Services. At the request of the City, the Contractor shall<br />

promptly remove from the project any Contractor’s employee, subcontractor, or any other person performing<br />

Services hereunder. The Contractor agrees that such removal of any of its employees does not require the<br />

Page 113


Exceptions to Proposal Provisions<br />

termination or demotion of any employee by the Contractor.<br />

• 1.81 Proprietary Rights. A. The Contractor hereby acknowledges and agrees that the City retains all rights,<br />

title and interests in and to all materials, data, documentation and copies thereof furnished by the City to the<br />

Contractor hereunder or furnished by the Contractor to the City and/or created by the Contractor for delivery<br />

to the City, even if unfinished or in process, as a result of the Services the Contractor performs in connection<br />

with this Agreement, including all copyright and other proprietary rights therein, which the Contractor as well<br />

as its employees, agents, subcontractors and suppliers may use only in connection with the performance of<br />

Services under this Agreement. The Contractor shall not, without the prior written consent of the City, use<br />

such documentation on any other project in which the Contractor or its employees, agents, subcontractors or<br />

suppliers are or may become engaged. Submission or distribution by the Contractor to meet official<br />

regulatory requirements or for other purposes in connection with the performance of Services under this<br />

Agreement shall not be construed as publication in derogation of the City's copyrights or other proprietary<br />

rights. Contractor shall not be liable for use of any documents for purposes other than the project for which<br />

they were created or for modifications to documents made by the City or other parties.<br />