01.07.2014 Views

Tetra Tech, Inc

Tetra Tech, Inc

Tetra Tech, Inc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

Charles W. Drake, P.G.<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />

Hydrogeologist<br />

a. Total<br />

29<br />

b. With Current Firm<br />

22<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

Professional Geologist, Florida, No. 37; Professional Geologist, Alabama, No. 440;<br />

B.S., University of Florida, 1982<br />

Professional Geologist, North Carolina, No. 1618; AIPG, Certified Professional Geologist,<br />

No. 11179<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

Professional Affiliations: Association of Groundwater Scientists and Engineers; Florida Association of Professional Geologists President – FAPG;<br />

American Water Resources Association; American Institute of Professional Geologists Executive committee<br />

19. Relevant Projects<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, North Miami Beach, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Scope included preliminary design, final design, permitting, and construction services to expand plant capacity to treat a<br />

total of 32.0 MGD with nanofiltration and low pressure reverse osmosis technologies. The expanded facility consists of 15.0 MGD from existing<br />

lime softening facilities, 9.0 MGD for new nanofiltration facilities, 6.0 MGD from new low pressure reverse osmosis facilities, and 2.0 MGD of<br />

micron filtered raw water blend. The existing facilities were also expanded and improved<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Water and Wastewater Consultant, Naples, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for the Continuing Water and Wastewater Engineering Consulting Services for the City of Naples. Services to the City have<br />

included, Permitting, Water and wastewater system evaluations, Miscellaneous water main and wastewater collection system extensions, water<br />

and wastewater system operations, Master planning, Hydrogeological and water resources, and Financial management as it relates to the water<br />

and wastewater facilities.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Consultant, Deltona, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member providing services for the Continuing Consultant contract for the City of Deltona. Services to the city have included support<br />

to several departments including Public Works, Public Utilities, Development Services, Parks and Recreation and the Building and Fire<br />

Department.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Miscellaneous Engineering, Cape Coral, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for the Continuing Miscellaneous Professional Engineering Services to the City of Cape Coral. Projects have included lift<br />

station refurbishment design, water and wastewater treatment plant modifications, utility infrastructure improvements and other miscellaneous<br />

engineering services as needed<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, James E. Anderson 22.5 MGD Reverse Osmosis Water<br />

Treatment Plant, Port St. Lucie, Florida<br />

Professional Services<br />

2008<br />

Construction (if applicable)<br />

2008<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Performed as Hydro Discipline Leader for the ROWTP Expansion from 6.0 MGD ROWTP to 22.5 MGD including, design,<br />

permitting, and construction administration. <strong>Tetra</strong> <strong>Tech</strong> was the engineer of record for the original 6.0 MGD ROWTP and the subsequent<br />

expansion to 22.5 MGD. The project included raw water supply, pipelines, membrane treatment, pre- and post-treatment, high service pumping,<br />

four 4 MG ground storage tanks, and concentrate disposal. This project was the second RO facility that <strong>Tetra</strong> <strong>Tech</strong> provided for the City treating<br />

the brackish Floridan Aquifer with reverse osmosis.<br />

SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />

Page 20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!