01.07.2014 Views

Tetra Tech, Inc

Tetra Tech, Inc

Tetra Tech, Inc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Stormwater Master Plan Update<br />

Key Biscayne, Florida<br />

Project Highlights:<br />

• The first task consisted<br />

of inventorying and<br />

mapping stormwater<br />

infrastructure in the City<br />

• The analysis consisted<br />

of hydrologic and<br />

hydraulic modeling<br />

using XP SWMM<br />

• <strong>Tetra</strong> <strong>Tech</strong><br />

concentrated on<br />

repetitive loss<br />

properties<br />

Project Value:<br />

<strong>Tetra</strong> <strong>Tech</strong> is currently contracted to provide professional engineering services for the<br />

Village of Key Biscayne Stormwater Master Plan Update. This project updates the<br />

existing Stormwater Master Plan and the Floodplain Management Plan and is one of the<br />

components required by the Community Rating System (CRS) in order to maintain and<br />

obtain additional credit for the 5-year CRS Cycle Recertification.<br />

The purpose of the Stormwater Master and Floodplain Management Plan Updates are to<br />

meet regulatory requirements, identify problem areas and issues relating to repetitive<br />

loss properties, to identify and evaluate improvement alternatives, and to estimate costs<br />

associated with various improvements to the stormwater management systems.<br />

Updating the Stormwater Master and Floodplain Management plans also assists the<br />

Village of Key Biscayne in maintaining the Class 7 rating compliance with the<br />

requirements of the National Flood Insurance Program (NFIP) CRS program.<br />

Tasks conducted as part of this project include:<br />

• Data collection<br />

• Existing stormwater infrastructure inventory<br />

• Preparation if a geographic information system (GIS) to serve as a platform for the<br />

existing and future stormwater infrastructure<br />

• Preparation of a stomwater atlas based on the GIS platform<br />

• Preparation of a hydraulic/hydrologic model of the Village’s stormwater system<br />

• Identification of existing and future levels of service (LOS) based on water level<br />

rises for varying stormwater conditions<br />

• Preparation of cost estimates for various alternatives<br />

• Prioritization of future improvements<br />

• Identification of phased capital improvements<br />

• Preliminary design of recommended alternatives<br />

• Funding requirements and coordination with the stormwater rate study<br />

$ 143,342.00<br />

Project Duration:<br />

2010 - 2011<br />

Project Staff:<br />

Ken Caban, PE<br />

Project Manager<br />

Alicia M. Verea-Feria, EI<br />

Project Engineer<br />

Rod Cashe, PE<br />

Project Engineer<br />

Mike Saxton, PE, CFM<br />

Project Engineer<br />

Alex Montalvo<br />

GIS Specialist<br />

William Musser, PE, CFM,<br />

PH<br />

Quality Control<br />

Reference:<br />

Village of Key Biscayne<br />

88 W. McIntyre Street<br />

Key Biscayne, FL 33149<br />

John Gilbert<br />

305.365.8945<br />

Page 63

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!