01.07.2014 Views

Tetra Tech, Inc

Tetra Tech, Inc

Tetra Tech, Inc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

W. Bruce Lafrenz, P.G. Hydrogeologist<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />

a. Total<br />

26<br />

b. With Current Firm<br />

15<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

B.S., University of Florida, 1981<br />

Professional Geologist, Florida, No. 1228<br />

M.S., University of Florida, 1986<br />

Professional Geologist, Georgia, No. 1411<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

Professional Affiliations: American Geophysical Union, American Institute of Professional Geologists/FAPG, American Water Resources<br />

Association, Geological Society of America, NGWA-Association of Groundwater Scientists and Engineers.<br />

19. Relevant Projects<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, North Miami Beach, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Scope included preliminary design, final design, permitting, and construction services to expand plant capacity to treat a<br />

total of 32.0 MGD with nanofiltration and low pressure reverse osmosis technologies. The expanded facility consists of 15.0 MGD from existing<br />

lime softening facilities, 9.0 MGD for new nanofiltration facilities, 6.0 MGD from new low-pressure reverse osmosis facilities, and 2.0 MGD of<br />

micron filtered raw water blend. The existing facilities were also expanded and improved. Primary roles include groundwater modeling and<br />

water well design QA/QC review.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Water and Wastewater Consultant, Naples, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for the Continuing Water and Wastewater Engineering Consulting Services for the City of Naples. Services to the City have<br />

included, permitting, water and wastewater system evaluations, Miscellaneous water main and wastewater collection system extensions, water<br />

and wastewater system operations, master planning, hydrogeological and water resources investigations, and financial management as it<br />

relates to the water and wastewater facilities. Primary roles include aquifer testing design and analysis, groundwater modeling, water use<br />

permitting, well design, and QA/QC review.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Consultant, Deltona, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member providing services for the Continuing Consultant contract for the City of Deltona. Services to the city have included support<br />

to several departments including Public Works, Public Utilities, Development Services, Parks and Recreation and the Building and Fire<br />

Department. Primary roles include aquifer testing and analysis, groundwater modeling, water use permitting, water well design, water resource<br />

exploration, and QA/QC review.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, James E. Anderson 22.5 MGD Reverse Osmosis Water<br />

Treatment Plant, Port St. Lucie, Florida<br />

Professional Services<br />

2008<br />

Construction (if applicable)<br />

2008<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member providing services for the ROWTP Expansion from 6.0 MGD ROWTP to 22.5 MGD including, design, permitting, and<br />

construction administration. <strong>Tetra</strong> <strong>Tech</strong> was the engineer of record for the original 6.0 MGD ROWTP and the subsequent expansion to 22.5<br />

MGD. The project included raw water supply, pipelines, membrane treatment, pre- and post-treatment, high service pumping, four 4 MG ground<br />

storage tanks, and concentrate disposal. Primary roles included groundwater modeling, water use permitting, and QA/QC review of well<br />

construction and testing data.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Toho Water Authority Pump Station No. 60 and 97 improvements, Kissimmee, Florida<br />

Professional Services Construction (if applicable)<br />

On-going<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member responsible for groundwater modeling, aquifer test analyses, and water use permitting. Participated in design, bidding, and<br />

summary report for five (5) public supply and exploratory test wells using the Lower Floridian aquifer as an alternative water source. Significant<br />

responsibility for QA/QC review of hydrogeological design, analysis, and reporting.<br />

SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />

Page 22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!