01.07.2014 Views

Tetra Tech, Inc

Tetra Tech, Inc

Tetra Tech, Inc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S<br />

QUALIFICATIONS FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

20. Example Project Key Number<br />

(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)<br />

21. Title and Location (City and State) 22. Year Complete<br />

Professional Services Construction (if applicable)<br />

Toho Water Authority Pump Station No. 60 and 97 improvements, Kissimmee,<br />

Florida<br />

2010 (completed)<br />

23. Project Owner’s Information<br />

a. Project Owner b. Point of Contact Name c. Point of Contact Telephone Number<br />

Toho Water Authority Ms. Deb Beatty, P.E. 407.944.5023<br />

24. Brief Description of Project and Relevance to this Contract (include scope, size, and cost)<br />

General Engineering Services: In 2008, the Tohopekaliga Water Authority (TWA)<br />

retained <strong>Tetra</strong> <strong>Tech</strong> to evaluate the condition of Pump Stations Nos. 60 and 97, and to<br />

identify appropriate improvements to address projected flows and reliability issues.<br />

Subsequently, TWA authorized <strong>Tetra</strong> <strong>Tech</strong> to provide final design, permitting, bidding,<br />

and construction phase services related to the recommended improvements.<br />

In general, the improvements to Pump Station No. 60 included structural rehabilitation<br />

of the wet well, installation of three (3) new 20 HP submersible pumps, replacement of<br />

the discharge piping, installation of a biofiltration odor control system, new controls,<br />

and a standby power system. Improvements to Pump Station No. 97 included<br />

rehabilitation of two (2) existing circular wet wells, installation of three (3) new 90 HP<br />

submersible pumps, replacement of the discharge piping, a magnetic flow meter,<br />

Project Highlights<br />

• Disciplines under this project:<br />

- Wastewater<br />

- Hydrogeology<br />

- Civil<br />

- Survey/GIS<br />

- Finance/Capital Planning<br />

Design<br />

• Project Value: $889,798<br />

installation of a biofiltration odor control system, new controls, and a standby power system. Both pump stations handle<br />

significant flows and are located on fairly small sites which presented some challenges with respect to equipment layout and<br />

maintenance of service during construction. Accordingly, the contract documents included detailed bypass pumping<br />

requirements, limitations on noise emissions during construction, and stringent requirements with respect to reliability of the<br />

bypass pumping systems. The project was constructed over a 6-month period without any overflows, interruptions in service, or<br />

claims for additional compensation or contract time.<br />

9<br />

25. Firms from Section C Involved with this Project<br />

(1) Firm Name (2) Firm Location (City and State) (3) Role<br />

a <strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>. Miami, FL Prime<br />

Page 42<br />

F-1 FORM SF330 PART I

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!