01.07.2014 Views

Tetra Tech, Inc

Tetra Tech, Inc

Tetra Tech, Inc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

Felix W. Yao, P.E.<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />

Electrical Engineer (Electrical Instrumentation<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

B.S., Electrical Engineering, Kettering University, 2003 Professional Engineer, Florida, No. 6963<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

a. Total<br />

7<br />

b. With Current Firm<br />

5<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

f.<br />

19. Relevant Projects<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, Alexander Orr Water Treatment Plant and South Miami-<br />

Dade Water Supply Systems, Miami, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for the Alexander Orr, Jr. Water Treatment Plant Continuing Services. This project provides engineering services to<br />

evaluate and rehabilitate or replace process equipment. Other key projects include the lime kiln mechanical and electrical upgrades study, a<br />

process optimization study and a secondary settlement basin bypass study.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Toho Water Authority Pump Station No. 60 and 97 improvements, Kissimmee, Florida<br />

Professional Services<br />

2010<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member providing professional engineering services to the Toho Water Authority. Projects have included numerous lift station<br />

upgrades and refurbishments, pipelines and other engineering services.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Eustis Wastewater Treatment Plant, Lake County, Florida<br />

Professional Services<br />

2010<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Project Engineer for the design of the power distribution system and interior and exterior lighting. Also replaced the existing control system<br />

which was based on a combination of CompactLogix PLCs and MicroLogix PLCs.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

South Florida Water Management District G-370 & G-372 Pump Stations, Clewiston, Florida<br />

Professional Services<br />

2010<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Electrical Engineer. Designed the control system upgrades to be capable of manually operating the pump station if all the local and remote<br />

automation failed to avoid catastrophic flooding in the area.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

OUC Eastern Water Treatment Facility Orlando, Florida<br />

Professional Services<br />

2010<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Designed the 4160V parallel emergency standby generators, neutral grounding resistors, 4160V power distribution system, and control system,<br />

for the expansion of the plant from 50MGD to 62.5MGD. Coordinated power feed with utility provider.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Poinciana Wastewater Treatment Plant #2, Toho Water Authority, Kissimmee, Florida<br />

Professional Services<br />

2007<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Project Engineer for electrical and instrumentation for the upgrade and expansion of the Poinciana WRF #2. The WRF treatment capacity will<br />

be increased from 3.0 to 6.0 MGD. Project also includes abandoning the SBR process in favor of the Modified Ludzing Ettinger (MLE) process,<br />

new filtration facilities, modifications to the influent screens, a new grit removal system, odor control for the screening and grit removal<br />

operations, a new chlorine contact basin with transfer pumps, new effluent storage and pumping, new residuals handling, and associated<br />

electrical and instrumentation.<br />

SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />

Page 28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!