E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

James E. Christopher, P.E<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />

Project Engineer (Water)<br />

a. Total<br />

30<br />

b. With Current Firm<br />

20<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

B.S., Chemistry, Duke University, 1976<br />

M.S., Environmental Engineering and Science, Professional Engineer, Florida, No. 34204<br />

University of Central Florida, 1980<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

Professional Affiliations: American Water Works Association. Florida Pollution Control Association, Water Environment <strong>Tech</strong>nology, Florida<br />

Engineering Society, Southeast Desalting Association, American Membrane <strong>Tech</strong>nology Association, Water Reuse Association.<br />

19. Relevant Projects<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

f.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, North Miami Beach, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for continuing services for a variety of design, permitting, and construction services tasks for integrating a 9 MGD membrane<br />

softening facility and a 6 MGD low pressure reverse osmosis facility with an existing 15 MGD lime softening water treatment plant for a total<br />

expanded capacity of 32.0 MGD, along with other potable water supply facilities.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, Alexander Orr Water Treatment Plant and South Miami-<br />

Dade Water Supply Systems, Miami, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for the Alexander Orr, Jr. Water Treatment Plant Continuing Services. This project provides engineering services to<br />

evaluate and rehabilitate or replace process equipment. Other key projects include the lime kiln mechanical and electrical upgrades study, a<br />

process optimization study and a secondary settlement basin bypass study.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Water and Wastewater Consultant, Naples, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Services provided to the City have included, Permitting, Water and wastewater system evaluations, Miscellaneous water<br />

main and wastewater collection system extensions, water and wastewater system operations, Master planning, Hydrogeological and water<br />

resources, and Financial management as it relates to the water and wastewater facilities.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Consultant, Deltona, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member as part of the Continuing Consultant contract for the City of Deltona. Services have included support to several departments<br />

including Public Works, Public Utilities, Development Services, Parks and Recreation and the Building and Fire Department.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Miscellaneous Engineering, Cape Coral, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Projects included lift station refurbishment design, water and wastewater treatment plant modifications, utility infrastructure<br />

improvements and other miscellaneous engineering services as needed.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, James E. Anderson 22.5 MGD Reverse Osmosis Water<br />

Treatment Plant, Port St. Lucie, Florida<br />

Professional Services<br />

2008<br />

Construction (if applicable)<br />

2008<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member: Project included the construction of 7 Floridan aquifer supply wells, one blend well and the addition of seven 2.0 MGD<br />

reverse osmosis skids, addition of feed and blend micron filters, expansion of the chemical feed system and expansion of the degasification and<br />

odor control facilities to increase the capacity in three construction milestones from 6.0 to 22.0 MGD.<br />

SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />

Page 13