01.07.2014 Views

Tetra Tech, Inc

Tetra Tech, Inc

Tetra Tech, Inc

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Drainage Improvements for Woodcrest Road,<br />

Glenridge Road, Buttonwood Drive<br />

Key Biscayne, Florida<br />

Project Highlights:<br />

• Alleviating flooding<br />

conditions on three<br />

thoroughfares within the<br />

Village of Key Biscayne<br />

Project Value:<br />

$425,500<br />

Project Duration:<br />

(Project Completed)<br />

Project Staff:<br />

Alicia Verea-Feria, EI<br />

Project Engineer<br />

Reference:<br />

City of Key Biscayne<br />

88 West McIntyre Street<br />

Village of Key Biscayne<br />

FL 33149<br />

This project consisted of the installation of 2000 LF of HDPE pipe, 18 catch basins and<br />

manholes, connecting to an existing system to alleviate flooding conditions on three<br />

thoroughfares within the Village of Key Biscayne. Repaving of same and bringing all<br />

properties back to original condition with landscaping and driveway restoration.<br />

John Gilbert<br />

305.365.8945<br />

As Design Engineer, <strong>Tetra</strong> <strong>Tech</strong> coordinated all design and permitting needed for the<br />

project. <strong>Tetra</strong> <strong>Tech</strong> was also responsible for the onsite inspections, safety, and<br />

scheduling of street closings.<br />

As Owners Agent, <strong>Tetra</strong> <strong>Tech</strong> was responsible for the contract, bidding and on time<br />

performance of contractor. Pay applications and retainage controlled by us as well.<br />

Page 66

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!