Tetra Tech, Inc
Tetra Tech, Inc
Tetra Tech, Inc
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Drainage Improvements for Woodcrest Road,<br />
Glenridge Road, Buttonwood Drive<br />
Key Biscayne, Florida<br />
Project Highlights:<br />
• Alleviating flooding<br />
conditions on three<br />
thoroughfares within the<br />
Village of Key Biscayne<br />
Project Value:<br />
$425,500<br />
Project Duration:<br />
(Project Completed)<br />
Project Staff:<br />
Alicia Verea-Feria, EI<br />
Project Engineer<br />
Reference:<br />
City of Key Biscayne<br />
88 West McIntyre Street<br />
Village of Key Biscayne<br />
FL 33149<br />
This project consisted of the installation of 2000 LF of HDPE pipe, 18 catch basins and<br />
manholes, connecting to an existing system to alleviate flooding conditions on three<br />
thoroughfares within the Village of Key Biscayne. Repaving of same and bringing all<br />
properties back to original condition with landscaping and driveway restoration.<br />
John Gilbert<br />
305.365.8945<br />
As Design Engineer, <strong>Tetra</strong> <strong>Tech</strong> coordinated all design and permitting needed for the<br />
project. <strong>Tetra</strong> <strong>Tech</strong> was also responsible for the onsite inspections, safety, and<br />
scheduling of street closings.<br />
As Owners Agent, <strong>Tetra</strong> <strong>Tech</strong> was responsible for the contract, bidding and on time<br />
performance of contractor. Pay applications and retainage controlled by us as well.<br />
Page 66