01.07.2014 Views

Tetra Tech, Inc

Tetra Tech, Inc

Tetra Tech, Inc

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

Miguel A. Garcia, PG<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />

Hydrogeologist<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

B.S., University of Florida, 1998 Professional Geologist, Florida, No. 2355<br />

a. Total<br />

14<br />

b. With Current Firm<br />

9<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

Professional Affiliations: FAPG (Florida Association of Professional Geologists); AIPG (American Institute of Professional Geologist); AWWRA<br />

(American Water Resources Association); NGW (National Groundwater Association). Training: 40-hour OSHA Health and Safety Training, 2006;<br />

8-hour Refresher OSHA Health and Safety Training, 2012; Standard First Aid Training, 2010.<br />

19. Relevant Projects<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

f.<br />

g.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Water and Wastewater Consultant, Naples, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member responsible for the design, bidding, and summary report for an Aquifer Storage and Recovery (ASR) exploratory test well for<br />

wetland recharge.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Consultant Deltona, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member responsible for the permitting, design, and installation of 10 wetland monitoring stations for the logging of water levels across<br />

the City’s water service area.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, James E. Anderson 22.5 MGD Reverse Osmosis Water<br />

Treatment Plant, Port St. Lucie, Florida<br />

Professional Services<br />

2008<br />

Construction (if applicable)<br />

2008<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member providing continuing miscellaneous professional engineering services to the City of Port St. Lucie. Our broad ranges of<br />

services have encompassed planning, design, financing and construction administration.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Toho Water Authority Pump Station No. 60 and 97 improvements, Kissimmee, Florida<br />

Professional Services<br />

2010<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member responsible for the design, bidding, and summary report for five (5) public supply and exploratory test wells using the Lower<br />

Floridian aquifer as an alternative water source<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Astatula Refueling Facility, Lake County, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Staff geologist during identification and delineation of a free product plume beneath the Refueling Facility USTs, and preparation of a report<br />

summarizing the most viable and cost effective remediation strategies to clean up the free product contamination beneath the Refueling Facility.<br />

Project Manager and Principal geologist responsible for preparation of Template Site Assessment Report (TSAR) for a FDEP Facility.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

City of Lake City, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Principal geologist responsible for design and construction oversight of monitor wells installations, as well as oversight during site remediation<br />

activities and project reporting.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Lake County Judicial Center, Lake County, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Project geologist responsible for preparation of contamination assessment and pilot test remediation reports for a petroleum contaminated site.<br />

SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />

Page 21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!