Tetra Tech, Inc
Tetra Tech, Inc
Tetra Tech, Inc
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />
Continuing Contract for Professional Services<br />
City of North Miami Beach<br />
(Complete one Section E for each key person.)<br />
12. Name 13. Role In This Contract 14. Years Experience<br />
Miguel A. Garcia, PG<br />
15. Firm Name And Location (City and State)<br />
<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />
Hydrogeologist<br />
16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />
B.S., University of Florida, 1998 Professional Geologist, Florida, No. 2355<br />
a. Total<br />
14<br />
b. With Current Firm<br />
9<br />
18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />
Professional Affiliations: FAPG (Florida Association of Professional Geologists); AIPG (American Institute of Professional Geologist); AWWRA<br />
(American Water Resources Association); NGW (National Groundwater Association). Training: 40-hour OSHA Health and Safety Training, 2006;<br />
8-hour Refresher OSHA Health and Safety Training, 2012; Standard First Aid Training, 2010.<br />
19. Relevant Projects<br />
a.<br />
b.<br />
c.<br />
d.<br />
e.<br />
f.<br />
g.<br />
(1) Title and Location (City and State) (2) Year Completed<br />
Continuing Water and Wastewater Consultant, Naples, Florida<br />
Professional Services<br />
On-going<br />
Construction (if applicable)<br />
(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />
Key Team Member responsible for the design, bidding, and summary report for an Aquifer Storage and Recovery (ASR) exploratory test well for<br />
wetland recharge.<br />
(1) Title and Location (City and State) (2) Year Completed<br />
Continuing Consultant Deltona, Florida<br />
Professional Services<br />
On-going<br />
Construction (if applicable)<br />
(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />
Key Team Member responsible for the permitting, design, and installation of 10 wetland monitoring stations for the logging of water levels across<br />
the City’s water service area.<br />
(1) Title and Location (City and State) (2) Year Completed<br />
Continuing Engineering Services, James E. Anderson 22.5 MGD Reverse Osmosis Water<br />
Treatment Plant, Port St. Lucie, Florida<br />
Professional Services<br />
2008<br />
Construction (if applicable)<br />
2008<br />
(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />
Key Team Member providing continuing miscellaneous professional engineering services to the City of Port St. Lucie. Our broad ranges of<br />
services have encompassed planning, design, financing and construction administration.<br />
(1) Title and Location (City and State) (2) Year Completed<br />
Toho Water Authority Pump Station No. 60 and 97 improvements, Kissimmee, Florida<br />
Professional Services<br />
2010<br />
Construction (if applicable)<br />
(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />
Key Team Member responsible for the design, bidding, and summary report for five (5) public supply and exploratory test wells using the Lower<br />
Floridian aquifer as an alternative water source<br />
(1) Title and Location (City and State) (2) Year Completed<br />
Astatula Refueling Facility, Lake County, Florida<br />
Professional Services<br />
On-going<br />
Construction (if applicable)<br />
(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />
Staff geologist during identification and delineation of a free product plume beneath the Refueling Facility USTs, and preparation of a report<br />
summarizing the most viable and cost effective remediation strategies to clean up the free product contamination beneath the Refueling Facility.<br />
Project Manager and Principal geologist responsible for preparation of Template Site Assessment Report (TSAR) for a FDEP Facility.<br />
(1) Title and Location (City and State) (2) Year Completed<br />
City of Lake City, Florida<br />
Professional Services<br />
On-going<br />
Construction (if applicable)<br />
(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />
Principal geologist responsible for design and construction oversight of monitor wells installations, as well as oversight during site remediation<br />
activities and project reporting.<br />
(1) Title and Location (City and State) (2) Year Completed<br />
Lake County Judicial Center, Lake County, Florida<br />
Professional Services<br />
On-going<br />
Construction (if applicable)<br />
(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />
Project geologist responsible for preparation of contamination assessment and pilot test remediation reports for a petroleum contaminated site.<br />
SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />
Page 21