Tetra Tech, Inc
Tetra Tech, Inc
Tetra Tech, Inc
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
SOLICITATION NO. 2012-10 E-1<br />
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />
Continuing Contract for Professional Services<br />
City of North Miami Beach<br />
(Complete one Section E for each key person.)<br />
12. Name 13. Role In This Contract 14. Years Experience<br />
John P. Toomey, P.E.<br />
15. Firm Name And Location (City and State)<br />
<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />
Project Engineer (Wastewater)<br />
16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />
BSE, University of Central Florida, Environmental<br />
Engineering, Magna cum Laude<br />
Professional Engineer, Florida, No. 40264<br />
AET, Vermont <strong>Tech</strong>nical College, High Honors<br />
18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />
Professional Affiliations: American Society of Civil Engineers, Metro Orlando Economic Development Commission of Mid-Florida.<br />
19. Relevant Projects<br />
a.<br />
b.<br />
c.<br />
d.<br />
e.<br />
f.<br />
g.<br />
(1) Title and Location (City and State) (2) Year Completed<br />
Continuing Engineering Services, North Miami Beach, Florida<br />
a. Total<br />
31<br />
Professional Services<br />
On-going<br />
b. With Current Firm<br />
11<br />
Construction (if applicable)<br />
(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />
Key Team Member for continuing services for a variety of design, permitting, and construction services tasks for integrating a 9 MGD membrane<br />
softening facility and a 6 MGD low pressure reverse osmosis facility with an existing 15 MGD lime softening water treatment plant for a total<br />
expanded capacity of 32.0 MGD, along with other potable water supply facilities.<br />
(1) Title and Location (City and State) (2) Year Completed<br />
Continuing Engineering Services, Hollywood, Florida<br />
Professional Services<br />
On-going<br />
Construction<br />
(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />
Key Team Member: Engineering services including preliminary design, preparation of final design and construction documents, permitting, and<br />
bidding during construction, including inspection and administration. Deliverables include multiple disciplines: water and wastewater<br />
engineering, surveying, geotechnical, design and preparation of contract documents, permitting, bidding, and construction phase services.<br />
(1) Title and Location (City and State) (2) Year Completed<br />
Continuing Water and Wastewater Consultant, Naples, Florida<br />
Professional Services<br />
On-going<br />
Construction (if applicable)<br />
(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />
Water/Wastewater engineering consulting, as well as continuing financial management services n provided to the City since the 1990s. Projects<br />
include upgrades to the Solana Road Booster Station, SCADA Plant Network emergency upgrades, SCADA and security upgrades, and potable<br />
water system communication improvements.<br />
(1) Title and Location (City and State) (2) Year Completed<br />
Continuing Consultant, Deltona, Florida<br />
Professional Services<br />
On-going<br />
Construction (if applicable)<br />
(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />
Key Team Member: Services included support to several departments including Public Works, Public Utilities, Development Services, Parks and<br />
Recreation and the Building and Fire Department.<br />
(1) Title and Location (City and State) (2) Year Completed<br />
Continuing Miscellaneous Engineering, Cape Coral, Florida<br />
Professional Services<br />
On-going<br />
Construction (if applicable)<br />
(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />
Key Team Member: Projects included lift station refurbishment design, water and wastewater treatment plant modifications, utility infrastructure<br />
improvements, and miscellaneous engineering services.<br />
(1) Title and Location (City and State) (2) Year Completed<br />
Continuing Engineering Services, James E. Anderson 22.5 MGD Reverse Osmosis Water<br />
Treatment Plant, Port St. Lucie, Florida<br />
Professional Services<br />
2008<br />
Construction (if applicable)<br />
2008<br />
(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />
Key Team Member: Construction of 7 aquifer supply wells, one blend well, and 7 additional 2.0-MGD RO skids, feed and blend micron filters,<br />
expansion of the chemical feed system and of the degasification/odor control facilities to increase capacity from 6.0 to 22.0 MGD.<br />
(1) Title and Location (City and State) (2) Year Completed<br />
Toho Water Authority Pump Station No. 60 and 97 improvements, Kissimmee, Florida<br />
Professional Services<br />
2010<br />
Construction (if applicable)<br />
(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />
Providing continuing misc. professional engineering services. Projects included lift station upgrades and refurbishments and pipelines.<br />
Page 18