26. Names of Key Personnel (From Section E, Block 12) Kenneth L. Caban, PE, BCEE, LEED AP G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 27. Role in this Contract (From Section E, Block 13) Continuing Contract for Professional Services City of North Miami Beach 28. Example Projects Listed in Section F (Fill in “Example Projects Key” section below before completing table. Place “X” under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Project Manager X X X X X James E. Christopher, PE, BCEE Project Engineer (Water) X X X X X X Jarrett K. Kinslow, PE Project Engineer (Water) X X X X Jill M. Hudkins, PE Project Engineer (Water) X X X X X Jon Fox, PE Project Engineer (Wastewater) X X X X X X X X X X John P. Toomey, PE Project Engineer (Wastewater) X X X X X X X Matthew A. Doan, PE Project Engineer (Wastewater) X X X X X X Charles W. Drake, PG Hydrogeologist X X X X X Miguel A. Garcia, PG Hydrogeologist X X X X W. Bruce Lafrenz, PG Hydrogeologist X X X X X William D. Musser, PE, LEED AP Project Engineer (Civil) X X X X X X Roderick K. Cashe, PE, LEED AP Project Engineer (Civil) X X X X X X James R. Warner, PE Project Engineer (Civil) X X X X X Lawrence E. Jenkins, PSM Survey / GIS X X X X Betty A. Morris Survey / GIS X X Felix W. Yao, PE Electrical Engineer (Electrical/Instrumentation) X William A. Paison, PE, LEED AP Electrical Engineer (Electrical/Instrumentation) X Andrew T. Woodcock, PE, MBA Finance/Capital Planning X X X X X X Jennifer L. Woodall, PE, MBA Finance/Capital Planning X X X X X 29. Example Projects Key No. Title of Example Project (From Section F) No. Title of Example Project (From Section F) 1 Continuing Engineering Services, North Miami Beach, Florida 6 Continuing Consultant, Deltona, Florida 2 Continuing Engineering Services, Hollywood, Florida 7 Continuing Miscellaneous Engineering, Cape Coral, Florida 3 Continuing Engineering Services, Key Biscayne, Florida 8 4 Continuing Engineering Services, Alexander Orr Water Treatment Plant and South Miami-Dade Water Supply Systems, Miami, Florida 5 Continuing Water and Wastewater Consultant, Naples, Florida 10 9 Continuing Engineering Services, James E. Anderson 22.5 MGD Reverse Osmosis Water Treatment Plant, Port St. Lucie, Florida Toho Water Authority Pump Station No. 60 and 97 improvements, Kissimmee, Florida Continuing Engineering Services, City of Miami Beach Normandy Isles Streetscape and Infrastructure Improvements, Miami Beach, Florida SOLICITATION NO. 2012-10 G-1 Form SF330 Part II Page 44
Page 45