Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

P<br />

F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S<br />

QUALIFICATIONS FOR THIS CONTRACT<br />

20. Example Project Key Number<br />

(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)<br />

21. Title and Location (City and State) 22. Year Complete<br />

Professional Services Construction (if applicable)<br />

Continuing Water and Wastewater Consultant, Naples, Florida<br />

Ongoing<br />

23. Project Owner’s Information<br />

a. Project Owner b. Point of Contact Name c. Point of Contact Telephone Number<br />

City of Naples Mr. Bob Middleton, Public Works Director 239.213.4714<br />

24. Brief Description of Project and Relevance to this Contract (include scope, size, and cost)<br />

General Engineering Services: <strong>Tetra</strong> <strong>Tech</strong> has been providing the City continuing water and<br />

wastewater engineering consulting services, as well as continuing financial management services for<br />

over 15 years. Services provided have included:<br />

• Permitting<br />

• Water and wastewater system evaluations<br />

• Miscellaneous water main and wastewater collection system extensions<br />

• Presentations to City Council relative to the capital improvements program<br />

• Water and wastewater system operations<br />

• Master planning<br />

• Hydrogeological and water resources<br />

• Financial management as it relates to the water and wastewater facilities<br />

Major projects, completed or ongoing, under this continuing consultant contract have included:<br />

• A 20-year, city-wide potable water system master plan<br />

• A comprehensive (capital) development rates and charges study for the water and wastewater<br />

• A specific capacity and wire to water efficiency test analysis, and work relative to the South<br />

Florida Water Management District's Request for Additional Information (RAI) for the water use<br />

permit submitted by the City and the City's wellfield operation plan<br />

• A utility audit for the City’s potable water distribution system to document system water losses<br />

• A water treatment process evaluation to demonstrate compliance with FDEP chlorine contact<br />

(CT) regulations<br />

• Preliminary design for upgrading the City’s East Naples and Solana Road potable water storage and booster pumping facilities<br />

• Preparing specifications for the installation of an ASR test well for the City’s reclaimed water system<br />

• Design, permitting, bidding and construction management for the installation of two wells within the City’s East Golden Gate Wellfield.<br />

A detailed description of a stormwater project delivered under this contract is listed below.<br />

Stormwater Master Plan Update: The City contracted <strong>Tetra</strong> <strong>Tech</strong> to integrate and update the city’s stormwater program to reflect the past 20<br />

years of various stormwater master plans and reports. The master plan update emphasis was to focus the city-wide effort in the areas of water<br />

quality improvements (flood control), water quality improvements (and retrofit pollution treatment), and overall integration of regional<br />

management practices affecting Naples Bay. Significant environmental concerns were focused on Naples Bay since it was recently adopted as<br />

a South Florida Water Management District (SFWMD) SWIM water body. In addition, the report was to adjust the five- and ten-year financial<br />

expectations including a review of their existing stormwater utility. The scope of services included performing the following:<br />

• Revised basin delineation<br />

• Asset inventory recertification<br />

• Summary of tidal influences, localized water quantity (flooding)<br />

problems, water quality problems, and coastal floodplain liabilities<br />

• Reconciliation of level of service (LOS)<br />

• Summary of water quality sampling program<br />

• Assessments of existing condition of receiving water bodies, of<br />

future regulatory issues, and of financial issues and opportunities<br />

• Final recommendations for immediate action<br />

It was identified during the master plan update that there were approximately $60 million worth of improvements and studies that need to be<br />

funded over the next ten years. In addition, it was determined that the stormwater utility rate structure and policies were not adequate to<br />

properly fund the upcoming projects identified and adjustments to the utility would be necessary.<br />

5<br />

Project Highlights<br />

Disciplines covered include:<br />

- Water and Wastewater<br />

- Hydrogeology<br />

- Civil<br />

- Survey/GIS<br />

- Finance/Capital<br />

Planning Design<br />

25. Firms from Section C Involved with this Project<br />

(1) Firm Name (2) Firm Location (City and State) (3) Role<br />

a <strong>Tetra</strong> <strong>Tech</strong>, <strong>Inc</strong>. Fort Myers, FL Prime<br />

Page 38<br />

F-1 FORM SF330 PART I