01.07.2014 Views

Tetra Tech, Inc

Tetra Tech, Inc

Tetra Tech, Inc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

William A. Paison, PE, LEED AP<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Ann Arbor, Michigan<br />

Electrical Engineer<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

B.S., Electrical Engineering, University of Michigan,<br />

1994<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

a. Total<br />

18<br />

b. With Current Firm<br />

15<br />

Professional Engineer in the states of: Michigan, No. 50403; Colorado, No 41332;<br />

Kentucky, No. 26701; Arizona, No 48738<br />

Construction Documents <strong>Tech</strong>nologist, Construction Specifications Institute<br />

MHSA Certified<br />

LEED Accredited Professional<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

19. Relevant Projects<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Professional Services Construction (if applicable)<br />

On-going<br />

Continuing Engineering Services, Alexander Orr Water Treatment Plant and South Miami-<br />

Dade Water Supply Systems, Miami, Florida<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for the Alexander Orr, Jr. Water Treatment Plant Continuing Services. This project provides engineering services to<br />

evaluate and rehabilitate or replace process equipment. Other key projects include the lime kiln mechanical and electrical upgrades study, a<br />

process optimization study and a secondary settlement basin bypass study.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Toho Water Authority Pump Station No. 60 and 97 improvements, Kissimmee, Florida<br />

Professional Services Construction (if applicable)<br />

2010<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member providing professional engineering services to the Toho Water Authority. Projects have included numerous lift station<br />

upgrades and refurbishments, pipelines and other engineering services.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Kerr Lake Campsite Water and Electrical Improvements, Mecklenburg County, Virginia<br />

Professional Services Construction (if applicable)<br />

2011<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Electrical ITR Lead for the conceptual and detailed design of water and electrical service provision to 47 additional campsites within the Site C<br />

and D camping areas of North Bend Park at Kerr Lake. Procured and managed subconsultants to include utility and land survey. This was an<br />

ARRA funded project.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

St. Croix Falls Wastewater Treatment Plants, Wisconsin<br />

Professional Services Construction (if applicable)<br />

2010<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Designed the power distribution system, and control system replacement associated with the doubling of the plant capacity. Power distribution<br />

was converted from 120/208 volt, 3 phase to 480/277 volt, 3 phase. A fiber optic network was installed to provide a robust SCADA network<br />

between the three buildings on site. Coordinated power feed upgrades with City utility provider, along with temporary feeds during construction.<br />

Project was designed to meet the stringent requirements of the United States of America Corp of Engineers.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Five Base Wastewater Treatment Plants, Afghanistan<br />

Professional Services Construction (if applicable)<br />

2010<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Designed the power distribution system, and control system, for five (5) separate treatment plants. Two (2) plants were lagoon processes and<br />

the remaining three (3) were extended aeration plants. Provided redundant generator power for the plants in lieu of utility power. Project was<br />

designed to meet the stringent requirements of the United States Department of Defense.<br />

SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />

Page 29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!