Water System Master Planning,<br />

Mapping, and Modeling<br />

Bartow, Florida<br />

Relevant Project Highlights<br />

for Crestview:<br />

• 13 Years of Water Master<br />

Planning Services to this<br />

Client<br />

• 10-year Water Master<br />

Plan<br />

• Evaluated Permitting<br />

Requirements with FDEP<br />

and Water Mgmt District<br />

• Provided Hydraulic Model<br />

Training to City Staff<br />

The City of Bartow has an extensive water system. The City's water service area<br />

encompasses the entire incorporated City limits of the City of Bartow and areas of<br />

unincorporated Polk County. The City’s system is served by two well systems with<br />

permitted capacity of 7.0 MGD. The combined system storage is 2.6 MG. The City has<br />

seen consistent growth from just over 15,025 residents in 1996 to over 16,043 in 2005.<br />

It is anticipated that the City will continue to see steady growth during the next 10 years.<br />

<strong>Tetra</strong> <strong>Tech</strong> was contracted by the City to conduct an original Master Plan in 1996, and<br />

provided updates in 2007 and 2008. The master planning effort included gathering<br />

existing data, verifying existing as-built and water atlas data, creating and updating the<br />

hydraulic model in WaterCAD, master planning, CIP development, and funding<br />

review. The master plan includes permitting requirements for improvements to the<br />

water system. <strong>Tetra</strong> <strong>Tech</strong> has served the City since 1996 for master planning services.<br />

The City did not have an existing map or hydraulic model in 1996 depicting the existing<br />

potable water system, therefore the initial phase of the master planning efforts consisted<br />

of developing a comprehensive water system map by utilizing existing as-built<br />

engineering drawings, maps, water system atlases, and record drawings. Additionally, in<br />

the initial phase of the project, <strong>Tetra</strong> <strong>Tech</strong> conducted an evaluation of the hydraulic<br />

modeling software currently commercially available and made a recommendation of the<br />

type of software for the City to purchase. The software recommendation was for the use<br />

of WaterCAD and was tailored to fit the unique needs of the City water system for<br />

today and future.<br />

The master planning phase of the project included evaluation of system water demand<br />

and growth, population projections, bulk water sales agreements, local system<br />

interconnections, future planning and zoning, treatment facility capacity and reliability<br />

including current and future permitting constraints, hydraulic analysis, hydraulic model<br />

training, and a capital improvement program. The capital improvement program<br />

consists of capital improvement identification, cost estimation, environmental permitting<br />

identification, a capital improvement alternative analysis based on economic and noneconomic<br />

criteria, and an implementation plan and schedule. Capital improvements<br />

anticipated include improvements to the water supply, treatment, storage and distribution<br />

systems. <strong>Tetra</strong> <strong>Tech</strong> has already provided one additional update in 2008 to include the<br />

analysis of adding the Clear Springs Development to the City of Bartow's service area.<br />

• WaterCAD Hydraulic<br />

Model <strong>Inc</strong>luded:<br />

- 4-24 inch (range of pipe<br />

diameters)<br />

- 198.4 miles<br />

- 1,451 pipes<br />

- 1,129 nodes<br />

- Two Wellfields<br />

• Master Plan Report<br />

Prepared<br />

Crestview Team Members<br />

Responsible for Work:<br />

Jon Fox, PE<br />

Alex Montalvo<br />

Client Reference:<br />

City of Bartow, Florida<br />

Mr. Ron Johnson<br />

863.534.0159<br />

Completion Date:<br />

June 2008<br />

Type and Size of Modeling:<br />

Water System: 198.4 miles of<br />

Water Main (4-24 inch), 1,451<br />

pipes, 1,129 nodes<br />

Page 51