Tetra Tech, Inc
Tetra Tech, Inc
Tetra Tech, Inc
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />
Continuing Contract for Professional Services<br />
City of North Miami Beach<br />
(Complete one Section E for each key person.)<br />
12. Name 13. Role In This Contract 14. Years Experience<br />
Jennifer L. Woodall, P.E., MBA<br />
15. Firm Name And Location (City and State)<br />
<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />
Finance/Capital Planning<br />
16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />
B.S., Georgia Institute of <strong>Tech</strong>nology, 1994<br />
Professional Engineer, Florida, No. 55515<br />
M.B.A., University of Florida, 2001<br />
18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />
American Water Works Association<br />
Water Environmental Federation<br />
19. Relevant Projects<br />
a.<br />
b.<br />
c.<br />
d.<br />
e.<br />
(1) Title and Location (City and State) (2) Year Completed<br />
Continuing Engineering Services, North Miami Beach, Florida<br />
a. Total<br />
15<br />
Professional Services<br />
On-going<br />
b. With Current Firm<br />
15<br />
Construction (if applicable)<br />
(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />
Key Team Member for continuing services for a variety of design, permitting, and construction services tasks for integrating a 9 MGD membrane<br />
softening facility and a 6 MGD low pressure reverse osmosis facility with an existing 15 MGD lime softening water treatment plant for a total<br />
expanded capacity of 32.0 MGD, along with other potable water supply facilities.<br />
(1) Title and Location (City and State) (2) Year Completed<br />
Continuing Engineering Services, Hollywood, Florida<br />
Professional Services<br />
On-going<br />
Construction (if applicable)<br />
(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />
Key Team Member providing professional engineering services to the City of Hollywood for numerous years. . Professional services provided<br />
include preliminary design, preparation of final design and construction documents, permitting, bidding, and engineering services during<br />
construction, including construction inspection and administration. Projects delivered include multiple disciplines of engineering including water<br />
and wastewater engineering. Services include surveying, geotechnical engineering, design and preparation of contract documents, permitting,<br />
bidding, and construction phase services.<br />
(1) Title and Location (City and State) (2) Year Completed<br />
Continuing Engineering Services, Key Biscayne, Florida<br />
Professional Services Construction (if applicable)<br />
On-going<br />
(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />
Key Team Member for continuing services providing professional engineering services to the Village of Key Biscayne for numerous years.<br />
Professional services provided include master planning, preliminary design, preparation of final design and construction documents, permitting,<br />
bidding, and engineering services during construction, including construction inspection and administration. Projects delivered include multiple<br />
disciplines of engineering including water resources, environmental permitting, transportation and others. Some recently completed key projects<br />
include the Stormwater Master Plan Update and various drainage improvements.<br />
(1) Title and Location (City and State) (2) Year Completed<br />
Professional Services Construction (if applicable)<br />
On-going<br />
Continuing Engineering Services, Alexander Orr Water Treatment Plant and South Miami-<br />
Dade Water Supply Systems, Miami, Florida<br />
(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />
Key Team Member for the Alexander Orr, Jr. Water Treatment Plant Continuing Services. This project provides engineering services to<br />
evaluate and rehabilitate or replace process equipment. Other key projects include the lime kiln mechanical and electrical upgrades study, a<br />
process optimization study and a secondary settlement basin bypass study.<br />
(1) Title and Location (City and State) (2) Year Completed<br />
Professional Services Construction (if applicable)<br />
2007-Current<br />
Continuing Engineering Services, City of Miami Beach Normandy Isles Streetscape and<br />
Infrastructure Improvements, Miami Beach, Florida<br />
(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />
Key Team Member for this major neighborhood improvement project. This project included coordinated designs, permitting, and construction<br />
services for sidewalk replacement, street-end design, textured pavement improvements, roadway resurfacing, landscaping, irrigation, water<br />
main replacement, rear easement water service relocation, and lighting enhancements.<br />
SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />
Page 31