01.07.2014 Views

Tetra Tech, Inc

Tetra Tech, Inc

Tetra Tech, Inc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(Complete one Section E for each key person.)<br />

12. Name 13. Role In This Contract 14. Years Experience<br />

Lawrence E. Jenkins, PSM<br />

15. Firm Name And Location (City and State)<br />

<strong>Tetra</strong> <strong>Tech</strong>, Orlando, FL<br />

Survey/GIS<br />

16. Education (Degree and Specialization) 17. Current Professional Registration (State and Discipline)<br />

Valencia Community College, Orlando<br />

Mid-Florida <strong>Tech</strong>nical Institute, Orlando B.S., University<br />

of Florida, 1998<br />

Professional Surveyor and Mapper, Florida, No. 5364<br />

Professional Surveyor and Mapper, Alabama, No. 29414-S<br />

a. Total<br />

28<br />

b. With Current Firm<br />

19<br />

18. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)<br />

Professional Affiliations: FAPG (Florida Association of Professional Geologists); AIPG (American Institute of Professional Geologist); AWWRA<br />

(American Water Resources Association); NGW (National Groundwater Association). Training: 40-hour OSHA Health and Safety Training, 2006;<br />

8-hour Refresher OSHA Health and Safety Training, 2012; Standard First Aid Training, 2010.<br />

19. Relevant Projects<br />

a.<br />

b.<br />

c.<br />

d.<br />

e.<br />

f.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Water and Wastewater Consultant, Naples, Florida<br />

Professional Services Construction (if applicable)<br />

On-going<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member responsible for performing multiple surveying tasks for City of Naples Utility projects, including surveying at the East Naples<br />

and Solana Road Booster Stations and the City’s Golden Gate wellfield, amongst other tasks.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Consultant, Deltona, Florida<br />

Professional Services Construction (if applicable)<br />

On-going<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member as part of the Continuing Consultant contract for the City of Deltona. Services have included support to several departments<br />

including Public Works, Public Utilities, Development Services, Parks and Recreation and the Building and Fire Department.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, James E. Anderson 22.5 MGD Reverse Osmosis Water<br />

Treatment Plant, Port St. Lucie, Florida<br />

Professional Services<br />

2008<br />

Construction (if applicable)<br />

2008<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member providing continuing miscellaneous professional engineering services to the City of Port St. Lucie. Our broad ranges of<br />

services have encompassed planning, design, financing and construction administration.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Toho Water Authority Pump Station No. 60 and 97 improvements, Kissimmee, Florida<br />

Professional Services Construction (if applicable)<br />

2010<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member providing continuing miscellaneous professional engineering services to the Toho Water Authority. Projects have included<br />

numerous lift station upgrades and refurbishments, pipelines and other engineering services.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Professional Engineering Services, City of Minneola, Florida<br />

Professional Services Construction (if applicable)<br />

On-going<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Survey Project Manager providing continuing miscellaneous professional engineering services to the City of Minneola. Our broad range of<br />

services has included planning, engineering, permitting and construction administration for numerous projects.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Professional Engineering Services, City of Clermont, Florida:<br />

Professional Services Construction (if applicable)<br />

On-going<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Survey Project Manager providing continuing miscellaneous professional engineering services to the City of Clermont. Our broad scope of<br />

services has included design, permitting and construction administration.<br />

SOLICITATION NO. 2012-10 E-1 FORM SF330 Part I<br />

Page 26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!