01.07.2014 Views

Tetra Tech, Inc

Tetra Tech, Inc

Tetra Tech, Inc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

g.<br />

h.<br />

i.<br />

j.<br />

various infrastructure; CEI services; and emergency management support during flooding.<br />

Continuing Contract for Professional Services<br />

City of North Miami Beach<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Miscellaneous Engineering, Cape Coral, Florida<br />

Professional Services<br />

On-going<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member for multiple water, wastewater and reclaimed water projects including plant upgrades, construction of new buildings, lift<br />

station upgrades, construction of new lift stations, construction of new water, wastewater and reclaimed water piping, security improvements,<br />

lighting improvements, booster station improvements, generator improvements and related miscellaneous tasks.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, James E. Anderson 22.5 MGD Reverse Osmosis Water<br />

Treatment Plant, Port St. Lucie, Florida<br />

Professional Services<br />

2008<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member - The project included the construction of 7 Floridan aquifer supply wells, one blend well and the addition of seven 2.0 MGD<br />

reverse osmosis skids, addition of feed and blend micron filters, expansion of the chemical feed system and expansion of the degasification and<br />

odor control facilities to increase the capacity in three construction milestones from 6.0 to 22.0 MGD.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Toho Water Authority Pump Station No. 60 and 97 improvements, Kissimmee, Florida<br />

Professional Services<br />

2010<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member - Providing professional engineering services to the Toho Water Authority. Projects have included numerous lift station<br />

upgrades and refurbishments, pipelines and other engineering services.<br />

(1) Title and Location (City and State) (2) Year Completed<br />

Continuing Engineering Services, City of Miami Beach Normandy Isles Streetscape and<br />

Infrastructure Improvements, Miami Beach, Florida<br />

Professional Services<br />

2007-Current<br />

Construction (if applicable)<br />

(3) Brief Description (Brief scope, size, cost, etc.) and Specific Role Check if project performed with current firms<br />

Key Team Member - Professional services include coordinating designs and permitting efforts, sidewalk replacement, street-end, textured<br />

pavement improvements, roadway resurfacing, landscaping, irrigation, water main replacement, rear easement water service relocation, and<br />

lighting enhancements.<br />

SOLICITATION NO. 2012-10 E-1 Page 17 SF330 Part I

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!