Tetra Tech, Inc
Tetra Tech, Inc
Tetra Tech, Inc
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
D.3 – Supplemental Material<br />
suppliers. If costs are significantly different, we can work to determine the reasoning for supplier cost variations.<br />
Reasoning for high supplier costs may include limited suppliers, or inability of supplier’s equipment to meet the<br />
design requirements, which allows one or two suppliers to increase their costs.<br />
Once we have completed the comparison between budget costs and bid costs, recommendations can be made<br />
as to how costs could be lowered. Such measures might include re-bidding, allowing “approved equal”<br />
substitutes that may be less expensive, or performing minor design revisions for portions of the project that<br />
appear significantly higher. Due to the current bidding environment, it will also be important to secure qualified<br />
bidders for the City's proposed projects. While this process is specific to design projects, the results of this<br />
process will assist this master planning effort by augmenting <strong>Tetra</strong> <strong>Tech</strong>’s cost estimating data bases.<br />
Page 80