23.07.2014 Views

LSM 815

LSM 815

LSM 815

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Manufacturing postponement, MP<br />

• MP mixes postponement t and speculation.<br />

• Products are produced to an intermediate form<br />

(e.g. modular components, packaged) or<br />

otherwise completed at a point downstream from<br />

manufacturing such as DC or distributor.<br />

• It provides more flexibility to the logistics system<br />

• Inventory levels of components control<br />

production, but customer orders control final<br />

assembly.<br />

• It requires advance planning in product<br />

development and choice of place and partners<br />

for final stages of production.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!