27.07.2014 Views

Report - London Borough of Hillingdon

Report - London Borough of Hillingdon

Report - London Borough of Hillingdon

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WINTER SERVICE OPERATIONAL PLAN<br />

CARRIAGEWAY<br />

ANNEX A TO APPENDIX 1<br />

SECONDARY GRITTING ROUTES<br />

NORTHERN AREA<br />

ROUTE 1<br />

SECTION 9N<br />

COMMENCING FROM<br />

Chamberlain Way<br />

Tolcarne Drive<br />

Norwich Road<br />

Wiltshire Lane<br />

Wentworth Drive<br />

Fore Street<br />

Salisbury Road<br />

NB.<br />

SPECIAL INSTRUCTIONS TO OPERATIVES<br />

1. Before departure check with your Supervisor on the spread rate<br />

required.<br />

2. Also check that the spinner is set correctly.<br />

3. Ensure that all roads stated above have been thoroughly completed.<br />

UDO NOTU grit UNSTATEDU roads.<br />

4. Return holder to your Supervisor after completing the route assigned<br />

to you.<br />

17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!