Report - London Borough of Hillingdon
Report - London Borough of Hillingdon
Report - London Borough of Hillingdon
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
WINTER SERVICE OPERATIONAL PLAN<br />
CARRIAGEWAY<br />
ANNEX A TO APPENDIX 1<br />
SECONDARY GRITTING ROUTES<br />
NORTHERN AREA<br />
ROUTE 1<br />
SECTION 9N<br />
COMMENCING FROM<br />
Chamberlain Way<br />
Tolcarne Drive<br />
Norwich Road<br />
Wiltshire Lane<br />
Wentworth Drive<br />
Fore Street<br />
Salisbury Road<br />
NB.<br />
SPECIAL INSTRUCTIONS TO OPERATIVES<br />
1. Before departure check with your Supervisor on the spread rate<br />
required.<br />
2. Also check that the spinner is set correctly.<br />
3. Ensure that all roads stated above have been thoroughly completed.<br />
UDO NOTU grit UNSTATEDU roads.<br />
4. Return holder to your Supervisor after completing the route assigned<br />
to you.<br />
17