Report - London Borough of Hillingdon
Report - London Borough of Hillingdon
Report - London Borough of Hillingdon
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
WINTER SERVICE OPERATIONAL PLAN<br />
APPENDIX 3<br />
All messages will commence with a Condition Indicator - or perhaps two Condition Indicators<br />
if required - and this will be followed by amplifying information on timing, (e.g. AFTER 2100)<br />
and, if appropriate, height (e.g. ABOVE 300 FT).<br />
26BDecision Making Procedure<br />
Condition<br />
Indicator/s<br />
Nil<br />
Alpha<br />
Precipitation, etc<br />
No rain, No hoar<br />
frost, No fog<br />
No rain, No hoar<br />
frost, No fog<br />
Predicted Road Condition<br />
Wet/Wet<br />
Pre-salted in last 24<br />
Dry<br />
Patches<br />
hrs - no rain since.<br />
May fall below freezing.<br />
Route coverage<br />
6 6 6 0<br />
Expected to fall below freezing – See Note (E).<br />
1 (note A) 6 (note A) 6 (note A) Black spots only<br />
Alpha Locally Bravo<br />
Bravo<br />
Expected hoar frost<br />
Expected fog 1 1 (note B) 4 (note B) Priorities<br />
Bravo Locally<br />
Charlie<br />
Charlie<br />
Delta<br />
Expected rain<br />
before freezing<br />
Expected rain<br />
during freezing<br />
3 (note C) 3 (note C) 3 (note C) Priorities & Secondaries<br />
2 (note D)<br />
2 or 5<br />
(note D)<br />
2 or 5 (note D) Priorities & Secondaries<br />
Snow Snow 1 1 1 Priorities & Secondaries<br />
The decision to undertake precautionary treatments should if appropriate be adjusted to take<br />
account <strong>of</strong> residual surface moisture. All decisions require continuous monitoring & review.<br />
27BACTION<br />
1 Salt before frost/Snow. 4 Inspection required.<br />
2 Salt before frost, as<br />
required during rain &<br />
again after rain stops.<br />
5 Inspection required with crews ‘standing by’ in depot for instructions.<br />
3 Salt after rain stops. 6 No action likely, monitor weather<br />
54