<strong>Forensic</strong> Consulting Services <strong>Report</strong><br />

Town of <strong>Trumbull</strong>, Connecticut<br />

Page 22<br />

type of “trench drain” was actually installed. Therefore, as a means of re-examining and<br />

confirming the actual quantity of drain installed, there is little supporting documentation available<br />

beyond conducting a comprehensive field investigation. Also, it is unclear as to why this particular<br />

Item of work was separated between Item No. 32 and Change Order 15. It was represented to<br />

CCR/Beta that the change order was initiated by the Towns’ <strong>WPCA</strong> merely due to the significance<br />

of the Item and the “poor perception” of having such a significant cost overrun on a project.<br />

Sewer Service “Chimney” Details<br />

The standard detail for sewer service vertical chimneys delineated on Design Sheet D-2 indicates a<br />

fully reinforced concrete vertical encasement of the 6–inch diameter sewer service lateral. The<br />

encasement being a minimum 6-inch envelope of Class “A” concrete reinforced with 2 - #4 steel<br />

bars @ 6-inch spacing and 3-inch minimum clearance to the vertical pipe. The overall height of the<br />

chimney structure, whether for an individual service or multi-unit service, being based on the<br />

required service parameters and related elevations. The service pipe, including the connecting wyebranch<br />

fittings extended vertically from the sewer main via a tee-branch fitting with a pipe material<br />

type consistent with that of the mainline. The means and methods for constructing and supporting<br />

such a structure whether being round or square is not detailed or otherwise specified.<br />

An added provision and/or possible material substitution for chimneys appear in a general note<br />

indicated on Design Sheet D-4 which states “All chimneys shall be either cast in place or precast<br />

concrete units. Variation shall be approved by the Engineer.”<br />

The methods for measurement and payment for “chimneys” appear under Specification Division 9,<br />

Section 9.1, paragraph 3, stating the completed work item shall be measured and paid for by the<br />

linear foot with the actual length being measured vertically “from the crown of the sewer to the end<br />

of the vertical pipe”. As a matter of reference “Chimneys” for <strong>Contract</strong> 3 are paid for under Bid Item<br />

No. 44 at a contractual Unit Price of $100 per vertical foot.<br />

Based on our inquiries regarding <strong>Contract</strong> 3, as well as subsequent site visits to observe the ongoing<br />

construction practices currently being employed on <strong>Contract</strong> No. 4, it appears that the actual<br />

construction elements of the “chimney” structures were modified and therefore not consistent with<br />

the design documents as originally bid.<br />

The modified means and methods for constructing “chimney” structures as allowed during <strong>Contract</strong><br />

3, and currently being employed on <strong>Contract</strong> 4, consists simply of vertically encasing the installed 6-<br />

inch diameter service chimney in a 6-inch envelope of ¾-inch crushed stone supported by a larger<br />

typically 18-inch diameter ribbed polyethylene casing pipe prior to backfilling the trench. The<br />

actual method for supporting and bedding the casing pipe at the mainline interface is uncertain. In<br />

addition, there does not appear to be any provisions and/or means of filtering out or stopping fines<br />

contained within the above surrounding soils from entering the column of stone thus potentially<br />

creating a source for post-construction settlement of the roadway.