Forensic Audit Report-WPCA Phase IV, Part B. Contract ... - Trumbull
Forensic Audit Report-WPCA Phase IV, Part B. Contract ... - Trumbull
Forensic Audit Report-WPCA Phase IV, Part B. Contract ... - Trumbull
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Forensic</strong> Consulting Services <strong>Report</strong><br />
Town of <strong>Trumbull</strong>, Connecticut<br />
Page 38<br />
13 Hedge Hog Road Stabilization,<br />
$29,500/LS 1 LS 29,500.00<br />
per lump sum<br />
14 Temporary Line Stripe, per<br />
$18,883.35/LS 1 LS 18,883.35<br />
lump sum<br />
15 8-inch PVC Trench Drain, per<br />
$20/LF 27,752 LF 555,040.00<br />
linear foot<br />
16** 10-inch PVC Sanitary Sewers<br />
$250/LF 567 LF 141,750.00<br />
(20-25 foot depth), per linear foot<br />
17** 10-inch DIP Sanitary Sewers<br />
$185/LF 50 LF 9,250.00<br />
(15-20 foot depth), per linear foot<br />
18 Remove Trees – Grey Rock Road, per $5,262/ LS<br />
5,262.00<br />
lump sum<br />
1 LS<br />
19** 8-inch PVC Sanitary Sewers<br />
$245/LF 399 LF 97,755.00<br />
(25-30 foot depth), per linear foot<br />
20** 48-inch Dia. Sanitary Manholes<br />
$6,500/EA 5 EA 32,500.00<br />
(25-30 foot depth), per unit<br />
21** Furnish & Install Double Catch Basin, $4,400 1 EA 4,400.00<br />
per Unit<br />
22 # 21 Wordins Lane Water Line $1,385.33/LS 1 EA 1,385.33<br />
$1,675,390.68<br />
In reviewing the above change orders there are a number issued and approved by the Town’s <strong>WPCA</strong><br />
simply based on the fact that there were no pay items and/or unit prices established within the<br />
original contract documents. These specific change orders are designated above with a double<br />
asterisk (**) and total $758,365 or 45.3% of the total change order increases to <strong>Contract</strong> 3.<br />
Further review appears to indicate that many of the above items may have been specifically related<br />
to the “Jog Hill Extension”, which by comparison and the fact that the “Extension” was indeed<br />
“added’ to <strong>Contract</strong> 3 by the Town as “Extra Work”, would explain why these items of work did not<br />
appear in the original documents. Unfortunately, due to the lack of a detailed takeoff of quantities<br />
and/or items of work specifically related to the “Jog Hill Extension”, confirmation of this conclusion<br />
is difficult. The fact remains however that the items were not elements of the original <strong>Contract</strong> 3<br />
documents and therefore appear to have been justified and necessary for completion of <strong>Contract</strong> 3.<br />
Other change order items appear, based on location and/or the item of work described, to be clearly<br />
elements of “Extra Work” specifically requested by the Town (the specific individual who made the<br />
request is unknown at this time) and approved by the <strong>WPCA</strong> for various unconfirmed and<br />
undocumented reasons. Reference is made to Change Order Nos. 6, 13, 14, 18 and 22.<br />
Change Order No. 6 totaling $16,355 appears to be related to drainage replacement and/or<br />
improvements requested by the Town at or in the vicinity of #21 Wareham Place. Change Order No.<br />
13 totaling $29,500 appears to be related to some form of river bank stabilization and/or<br />
improvements (i.e. trees/stump removal, channel clearing and lining, site restoration, and guard rail