05.10.2014 Views

Forensic Audit Report-WPCA Phase IV, Part B. Contract ... - Trumbull

Forensic Audit Report-WPCA Phase IV, Part B. Contract ... - Trumbull

Forensic Audit Report-WPCA Phase IV, Part B. Contract ... - Trumbull

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Forensic</strong> Consulting Services <strong>Report</strong><br />

Town of <strong>Trumbull</strong>, Connecticut<br />

Page 38<br />

13 Hedge Hog Road Stabilization,<br />

$29,500/LS 1 LS 29,500.00<br />

per lump sum<br />

14 Temporary Line Stripe, per<br />

$18,883.35/LS 1 LS 18,883.35<br />

lump sum<br />

15 8-inch PVC Trench Drain, per<br />

$20/LF 27,752 LF 555,040.00<br />

linear foot<br />

16** 10-inch PVC Sanitary Sewers<br />

$250/LF 567 LF 141,750.00<br />

(20-25 foot depth), per linear foot<br />

17** 10-inch DIP Sanitary Sewers<br />

$185/LF 50 LF 9,250.00<br />

(15-20 foot depth), per linear foot<br />

18 Remove Trees – Grey Rock Road, per $5,262/ LS<br />

5,262.00<br />

lump sum<br />

1 LS<br />

19** 8-inch PVC Sanitary Sewers<br />

$245/LF 399 LF 97,755.00<br />

(25-30 foot depth), per linear foot<br />

20** 48-inch Dia. Sanitary Manholes<br />

$6,500/EA 5 EA 32,500.00<br />

(25-30 foot depth), per unit<br />

21** Furnish & Install Double Catch Basin, $4,400 1 EA 4,400.00<br />

per Unit<br />

22 # 21 Wordins Lane Water Line $1,385.33/LS 1 EA 1,385.33<br />

$1,675,390.68<br />

In reviewing the above change orders there are a number issued and approved by the Town’s <strong>WPCA</strong><br />

simply based on the fact that there were no pay items and/or unit prices established within the<br />

original contract documents. These specific change orders are designated above with a double<br />

asterisk (**) and total $758,365 or 45.3% of the total change order increases to <strong>Contract</strong> 3.<br />

Further review appears to indicate that many of the above items may have been specifically related<br />

to the “Jog Hill Extension”, which by comparison and the fact that the “Extension” was indeed<br />

“added’ to <strong>Contract</strong> 3 by the Town as “Extra Work”, would explain why these items of work did not<br />

appear in the original documents. Unfortunately, due to the lack of a detailed takeoff of quantities<br />

and/or items of work specifically related to the “Jog Hill Extension”, confirmation of this conclusion<br />

is difficult. The fact remains however that the items were not elements of the original <strong>Contract</strong> 3<br />

documents and therefore appear to have been justified and necessary for completion of <strong>Contract</strong> 3.<br />

Other change order items appear, based on location and/or the item of work described, to be clearly<br />

elements of “Extra Work” specifically requested by the Town (the specific individual who made the<br />

request is unknown at this time) and approved by the <strong>WPCA</strong> for various unconfirmed and<br />

undocumented reasons. Reference is made to Change Order Nos. 6, 13, 14, 18 and 22.<br />

Change Order No. 6 totaling $16,355 appears to be related to drainage replacement and/or<br />

improvements requested by the Town at or in the vicinity of #21 Wareham Place. Change Order No.<br />

13 totaling $29,500 appears to be related to some form of river bank stabilization and/or<br />

improvements (i.e. trees/stump removal, channel clearing and lining, site restoration, and guard rail

Hooray! Your file is uploaded and ready to be published.

Saved successfully!