<strong>Forensic</strong> Consulting Services <strong>Report</strong><br />

Town of <strong>Trumbull</strong>, Connecticut<br />

Exhibit B - Payments to Spath-Bjorklund Associates, Inc.<br />

Invoice No.<br />

Invoice Date<br />

Invoice<br />

Amount<br />

Services Performed<br />

<strong>Trumbull</strong><br />

Check No.<br />

<strong>Trumbull</strong><br />

Check Date Amount Paid<br />

Invoice #1 of 12: Sewer design & survey per contract: <strong>Trumbull</strong> Sewer Project,<br />

9315 7/18/2003 79,613.25 <strong>Phase</strong> 4 Section B Jog Hill Road, No & So Nichols 19003 8/28/2003 79,613.25<br />

961,424.50 961,424.50<br />

FY 2005<br />

10787 6/10/2005 5,556.14<br />

Design and draft landscape plan; prepare alternate site design in location of<br />

demolished cart barn; investigate the need for a department of Environmental<br />

Protection Septic System; obtain a waiver from the DEP to eliminate the grit chamber<br />

and holding tank 31571 6/23/2005 5,556.14<br />

10788 6/10/2005 7,050.00<br />

Site design and preparation of plans and specifications for the site work associated<br />

with the new Cart Barn through the distribution of the Addendum One in the bid<br />

documents 31571 6/23/2005 7,050.00<br />

10384 12/10/2004 6,146.25<br />

Hydraulic computations, plan and profile preparation and field inspection; All work<br />

was with regards to obtaining/or avoiding DEP Diversion Permit; Meet with staff and<br />

DEP personnel 31323 6/9/2005 6,146.25<br />

10703 5/13/2005 820.00 Stake driveway radius points and locate new cart barn 31183 6/2/2005 820.00<br />

10525 2/18/2005 568.60 Various meetings between 11/10/04 and 2/17/05 29813 3/24/2005 568.60<br />

Stake parking lot; emailing of files to Robinson Arch; site visit; meetings and phone<br />

10305 11/17/2004 1,403.75 correspondence; mileage 27794 12/9/2004 1,403.75<br />

10154 9/10/2004 3,526.80<br />

Prepare parking lot layout; revise parking lot layout re: waterline and different<br />

drainage layouts; stake out parking lot; meetings and correspondence; re-flag wetland<br />

limits 26276 9/23/2004 3,526.80<br />

25,071.54 25,071.54<br />

FY 2006<br />

11521 5/11/2006 1,850.00 Prepare consultants report and mapping on soil suitability 37848 6/1/2006 1,850.00<br />

Investigate possible alternate Pump Station locations in Inverness, Deepdene and Post<br />

11522 5/11/2006 2,860.00 Gate Lane Areas 37848 6/1/2006 2,860.00<br />

11402 3/17/2006 22,922.50 Prepare Jog Hill easement maps; Fees paid to the Town of <strong>Trumbull</strong> for map copies 37155 4/20/2006 22,922.50<br />

11397 3/10/2006 2,838.25 Extra design and survey work not originally in contract 37155 4/20/2006 2,838.25<br />

10875 7/22/2005 8,655.50<br />

Prepare plans, reports and hydraulic computations to support TOT application to DEP<br />

for flood certification; attend meetings at DEP; prints, copies, deliveries and mileage 33797 10/13/2005 1,853.75<br />

10850 7/8/2005 7,532.25 Easement maps - Canoe Brook Lake; Easement maps - 1/2 acre zone 32720 8/18/2005 7,532.25