<strong>Forensic</strong> Consulting Services <strong>Report</strong><br />
Town of <strong>Trumbull</strong>, Connecticut<br />
Exhibit E - Bid Tabulation / Evaluation<br />
Project: <strong>Trumbull</strong>, CT - Sanitary Sewers<br />
(1) (2) (3)<br />
(4)<br />
Unit Price Comparisons<br />
<strong>Phase</strong> 4, <strong>Part</strong> B, <strong>Contract</strong> 3<br />
Guerrera Construction Company,<br />
Mark <strong>IV</strong> Construction Co.<br />
M. Rondano, Inc.<br />
Baltazar Constractors, Inc.<br />
Inc.<br />
Average Unit Average Unit<br />
Engineer: Spath Bjorklund Associates, Inc.<br />
1137 Seaview Avenue 154 Christian Street<br />
49 East Avenue<br />
83 Carmelina''s Circle<br />
Price<br />
Price<br />
593 Main Street, Monroe, CT 06468<br />
Bridgeport, CT 06607<br />
Oxford, CT 06478<br />
Norwalk, CT 06851<br />
Ludlow, MA<br />
(All Bidders) (2 - 4 Bidders)<br />
ESTIMATED UNIT UNIT UNIT UNIT UNIT UNIT<br />
ITEM NO. DESCRIPTION<br />
UNIT<br />
QUANTITY PRICE<br />
AMOUNT<br />
PRICE<br />
AMOUNT<br />
PRICE<br />
AMOUNT<br />
PRICE<br />
AMOUNT<br />
PRICE PRICE<br />
43 60-inch Sanitary Drop Manhole (10 - EA 1 $ 6,000.00 $ 6,000.00 $ 6,000.00 $ 6,000.00 $ 4,500.00 $ 4,500.00 $ 6,000.00 $ 6,000.00 $ 5,625.00 $5,500.00<br />
15 FT Depth)<br />
44 6-inch Concrete Chimneys VF 900 * $ 100.00 $ 90,000.00 $ 145.00 $ 130,500.00 $ 150.00 $ 135,000.00 $ 120.00 $ 108,000.00 $ 128.75<br />
$138.33<br />
45 Stream , River & Culvert Crossing LS 1 $ 45,000.00 $ 45,000.00 $ 24,000.00 $ 24,000.00 $ 12,000.00 $ 12,000.00 $ 400,000.00 $ 400,000.00 $ 120,250.00 $145,333.33<br />
46 Core Drilling Existing Sanitary EA 10 $ 1,200.00 $ 12,000.00 $ 1,500.00 $ 15,000.00 $ 1,000.00 $ 10,000.00 $ 1,500.00 $ 15,000.00 $ 1,300.00 $1,333.33<br />
Manholes<br />
47 Trench Excavation - ROCK<br />
CY 44,964 $ 0.01 $ 449.64 $ 34.00 $ 1,528,776.00 $ 60.00 $ 2,697,840.00 $ 60.00 $ 2,697,840.00 $ 38.50<br />
$51.33<br />
(Assumed 7-FT Plus)<br />
48 Borrow CY 6,221 $ 0.01 $ 62.21 $ 0.01 $ 62.21 $ 0.01 $ 62.21 $ 0.01 $ 62.21 $ 0.01<br />
$0.01<br />
49 Gravel Fill CY 13,277 $ 0.01 $ 132.77 $ 0.01 $ 132.77 $ 0.01 $ 132.77 $ 0.01 $ 132.77 $ 0.01<br />
$0.01<br />
50 Foundation Stone CY 23,903 $ 0.01 $ 239.03 $ 0.01 $ 239.03 $ 18.00 $ 430,254.00 $ 30.00 $ 717,090.00 $ 12.01<br />
$16.00<br />
51 Gutter-Milling of Existing Pavement SY 35,200 ** $ 0.01 $ 352.00 $ 2.25 $ 79,200.00 $ 2.50 $ 88,000.00 $ 2.00 $ 70,400.00 $ 1.69<br />
$2.25<br />
52 Temporary Bituminous Repair SY 63,586 $ 24.00 $ 1,526,064.00 $ 25.00 $ 1,589,650.00 $ 33.00 $ 2,098,338.00 $ 31.00 $ 1,971,166.00 $ 28.25<br />
$29.67<br />
53 Permanent Pavement Repair,<br />
(Includes permanent bituminous<br />
concrete overlay)<br />
54 Bituminous Curb (with Back-up<br />
grading)<br />
SY 241,333 $ 9.00 $ 2,171,997.00 $ 6.80 $ 1,641,064.40 $ 9.00 $ 2,171,997.00 $ 8.75 $ 2,111,663.75 $ 8.39<br />
$8.18<br />
LF 18,400 ** $ 6.00 $ 110,400.00 $ 4.00 $ 73,600.00 $ 3.25 $ 59,800.00 $ 7.50 $ 138,000.00 $ 5.19<br />
$4.92<br />
55 Restoration LS 1 $ 350,000.00 $ 350,000.00 $ 721,000.00 $ 721,000.00 $ 308,000.00 $ 308,000.00 $ 400,000.00 $ 400,000.00 $ 444,750.00 $476,333.33<br />
56 Project Sign EA 2 $ 1.00 $ 2.00 $ 1,500.00 $ 3,000.00 $ 1,000.00 $ 2,000.00 $ 3,250.00 $ 6,500.00 $ 1,437.75 $1,916.67<br />
57 Television Pipeline Inspection LF 71,446 $ 2.00 $ 142,892.00 $ 1.25 $ 89,307.50 $ 1.25 $ 89,307.50 $ 1.50 $ 107,169.00 $ 1.50<br />
$1.33<br />
BIDDER'S TOTAL: $ 15,385,644.85<br />
$ 17,976,680.41<br />
$ 20,091,040.48<br />
$ 20,788,474.73<br />
CALCULATION CHECK TOTAL: $ 15,385,644.85<br />
$ 17,976,680.41<br />
$ 20,091,040.48<br />
$ 20,788,474.73<br />
(1)<br />
Mark <strong>IV</strong> Construction Co.<br />
(2)<br />
Guerrera Construction Company,<br />
Inc.<br />
(3)<br />
M. Rondano, Inc.<br />
(4)<br />
Baltazar Constractors, Inc.<br />
1137 Seaview Avenue 154 Christian Street 49 East Avenue<br />
83 Carmelina''s Circle<br />
Bridgeport, CT 06607 Oxford, CT 06478 Norwalk, CT 06851 Ludlow, MA<br />
Item No.<br />
Item Desciption<br />
Amount<br />
27 15-inch CPP Storm Drainage (0 - 10<br />
FT Depth)<br />
33 Trench Dam<br />
47 Trench Excavation - ROCK<br />
(Assumed 7-FT Plus)<br />
51 Gutter-Milling of Existing Pavement<br />
Primary Items of Difference:<br />
$802,935.00<br />
$49,999.80<br />
$1,528,326.36<br />
$78,848.00<br />
$2,460,109.16<br />
$2,591,035.56 $4,705,395.63 $5,402,829.88<br />
$2,114,360.07 $2,811,794.32<br />
NOTES:<br />
*<br />
**<br />
This quantity was modified by the Town based on previous experiences of new sanitary sewer installations in existing roads. The location and placement of these extra<br />
items not indicated on the drawings, if required, will be at the discretion of the Town Road Inspector in the field.<br />
This quantity was computed by the Town and is based on recent insp[ections and the opinions of the Town Road Inspector. The location and placement of these extra<br />
items not indicated on the drawings, if required, will be at the discretion of the Town Road Inspector in the field.<br />
Page 3 of 3