The calculations for test 2 shall be the average dry back correction from tests 1 and<br />
2. After the first two tests, the dry back correction shall be the average of all<br />
previous dry back tests. <strong>For</strong> subsequent days of production, use the dry back<br />
correction available at the start of the day for all tests conducted that day even if a<br />
new dryback correction is determined during the day. An example of the dry back<br />
correction calculations for a project is given on the attached dry back summary sheet<br />
(Figure 1). The correction shall be used as given in the following schedule:<br />
Day 1 Test 1 - Use dry back from test 1.<br />
Test 2 - Use average dry back from tests 1 and 2.<br />
Test 3 - Use average dry back from tests 1 and 2.<br />
Test 4 - Use average dry back from tests 1 and 2.<br />
Day 2 Test 5 - Use average dry back from tests 1 and 2.<br />
Test 6 - Use average dry back from tests 1 and 2.<br />
Test 7 - Use average dry back from tests 1 and 2.<br />
Day 3 Test 8 - Use average dry back from tests 1 and 2.<br />
Test 9 - Use average dry back from tests 1 and 2.<br />
Test 10 - Use average dry back from tests 1 and 2.*<br />
Test 11 - Use average dry back from tests 1 and 2.*<br />
Day 4 Test 12 - Use average dry back from tests 1, 2, and 10.<br />
Test 13 - Use average dry back from tests 1, 2, and 10.<br />
FIGURE 1<br />
(Example Maximum Specific Gravity Dry Back Correction Calculations)<br />
Maximum Specific Gravity Dry Back Correction Summary Sheet<br />
(Y)<br />
G mm (X-Y) Cum. No.<br />
w/Dry Difference Difference of<br />
Back<br />
Tests<br />
Date Test (X)<br />
G mm<br />
Average<br />
Difference<br />
Corrected<br />
G mm<br />
Day 1 1 2.508 2.505 0.003 0.003 1 0.003 2.505<br />
2 2.508 2.503 0.005 0.008 2 0.004 2.504<br />
3 2.518 - - - - 0.004 2.514<br />
4 2.514 - - - - 0.004 2.510<br />
Day 2 5 2.509 - - - - 0.004 2.505<br />
6 2.503 - - - - 0.004 2.499<br />
7 2.502 - - - - 0.004 2.498<br />
Day 3 8 2.515 - - - - 0.004 2.511<br />
9 2.505 - - - - 0.004 2.501<br />
10 2.507 2.500 0.007 - 2* 0.004 2.503<br />
11 2.504 - - - - 0.004 2.500<br />
Day 4 12 2.501 - - 0.015 3 0.005 2.496<br />
13 2.498 - - - - 0.005 2.493<br />
Rev. February 5, 2007 32