Balances (QA team check with known weight)<br />

Gyratory compactor-Ensure inside diameter of gyratory molds<br />

meets tolerances specified in Section 4.2 of AASHTO T 312.<br />

Molds found to be outside the tolerance should be discarded.<br />

Vacuum pumps, hoses, bowl or flask, manometer gauge and<br />

hookup, etc.<br />

Water baths, thermometers, ovens<br />

Fax and copy machine<br />

• Review with the QC team’s proposed sampling locations and splitting<br />

procedures.<br />

• Review procedure for determining the reheat correction factors for G mb and<br />

G mm and the dryback correction procedure.<br />

• Verify that the Hydrated Lime feed system meets the requirements of<br />

401.03.2.1.1 and 401.03.2.1.2 and that the Contractor has the required hydrated<br />

lime inventory (401.02.3.1).<br />

6.3.2 Start-up Day. A member of the District QA team should be at the QC<br />

laboratory on start-up day. This person should:<br />

• Verify that the Contractor is producing the “Tentatively Approved” mixture<br />

design.<br />

• Verify the source of supply of the asphalt binder. Materials from different<br />

sources should not be mixed without prior written approval of the Engineer<br />

(401.03.2.1.5).<br />

• Verify that the maximum amount of material being fed through a single cold<br />

feed is 45 percent (401.03.2.1.2).<br />

• Verify that the RAP scalping screen is in place and functioning (401.02.3.1).<br />

• Observe sampling and splitting procedures.<br />

• Observe testing procedures including reducing the field sample to testing size.<br />

• Check nuclear asphalt content gauge calibration using standard pan or verify<br />

that the incinerator oven has been properly calibrated.<br />

• Verify that the mixture moisture content determined for correcting the asphalt<br />

content meets the requirements of 401.03.2.1.3.<br />

Review data calculations to include:<br />

• Asphalt content (P b ).<br />

• Mix air voids (P a ).<br />

• Voids in the Mineral Aggregate (VMA).<br />

• Running average (if applicable).<br />

Compare Contractor process control data with the Job Mix <strong>For</strong>mula (JMF) data as<br />

soon as possible (voids, VMA, G mm , G mb , asphalt content and gradation).<br />