Marley Sustainable Drainage Rainwater Harvesting Kits ... - BHL.co.uk
Marley Sustainable Drainage Rainwater Harvesting Kits ... - BHL.co.uk
Marley Sustainable Drainage Rainwater Harvesting Kits ... - BHL.co.uk
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
RAINWATER HARVESTING KITS - INSTALLATION MANUAL<br />
Pump and pipework installation<br />
(i) Float switch assembly<br />
Assemble the float switch onto the stainless steel mounting<br />
bracket then mount and position the bracket on the pump body<br />
using the large hose clip as shown in figure 11. Do not<br />
overtighten the clip.<br />
USW200 requires the 4mm bore level sensing tube and sleeved<br />
grommet to be fitted to the bracket, as shown.<br />
Secure the float switch cable and sensing tube (where fitted) to<br />
the pump cable with cable ties every 300mm.<br />
(ii) Discharge hose assembly<br />
Apply a few turns of thread tape to the 25mm hose adaptor and<br />
fit to the outlet of the pump, then secure the discharge hose<br />
with the hose clip.<br />
Tie the pump withdrawal <strong>co</strong>rd to the eyelet on the pump body<br />
and lower the assembly into the well.<br />
Both <strong>co</strong>ntrol systems require a length of 15mm Equator push-fit<br />
pipe to run from the discharge hose fitting to the wall tap or<br />
<strong>co</strong>nnection point for the header tank.<br />
Note: the Equator pipe can be used to assist in feeding the<br />
electrical cables and tubing through the service pipe to the<br />
<strong>co</strong>ntrol housing – refer to page 12 before proceeding.<br />
10