09.11.2014 Views

Marley Sustainable Drainage Rainwater Harvesting Kits ... - BHL.co.uk

Marley Sustainable Drainage Rainwater Harvesting Kits ... - BHL.co.uk

Marley Sustainable Drainage Rainwater Harvesting Kits ... - BHL.co.uk

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RAINWATER HARVESTING KITS - INSTALLATION MANUAL<br />

Commissioning<br />

Before <strong>co</strong>mmissioning the system the tank must be partially filled<br />

with clean water to a minimum depth of 250mm from the base<br />

of the pump. (Approximately 1000 litres).<br />

With the pump sitting in the bottom housing, bleed the air from<br />

the pump body by loosening the upper hose clip and releasing<br />

the hose from the Equator fittings assembly.<br />

Re<strong>co</strong>nnect the hose and tighten the hose clip.<br />

The <strong>co</strong>ntrol housings have two ‘touch sensitive’ pads on the<br />

fascia which are operated by momentarily holding a finger on the<br />

surface until the appropriate light is illuminated or extinguished.<br />

The following procedure enables the <strong>co</strong>ntrol system to determine the<br />

‘closed valve’ and ‘normal’ operating pressures with a garden hose<br />

and fitting attached or with the header tank inlet valve fully open. The<br />

system will then monitor the pressure during use so that the pump<br />

cuts out when the pressure reaches the closed valve <strong>co</strong>ndition. The<br />

pressure setting will be retained once calibrated and should be<br />

adequate for 12mm bore hoses at lengths up to 60m. If a longer<br />

hose is subsequently fitted and it is found that the pump will not<br />

operate or operates intermittently, it might be necessary to re-calibrate.<br />

The level display for USW200 installations operates by measuring<br />

the pressure head of the water level in the tank and uses the full<br />

tank <strong>co</strong>ndition as a datum for calibration. The function of the<br />

pump is not dependent on calibration of the level display, so if<br />

required, this operation can be deferred until the tank is fully<br />

replenished with rainwater.<br />

USW100 - pump calibration<br />

a.Connect the 240V power supply to the system and leave the<br />

panel in the off state<br />

b.Press both buttons. The lower calibration LED will be lit.<br />

c.Ensure that the tap is shut and that there is no water flow.<br />

d.Press the right hand button. Both calibration LED’s will now be lit.<br />

e.Connect the hose and any fittings to the tap. Open the tap and<br />

the fitting fully so that the water flows.<br />

f.Press the right hand button one last time.<br />

g.The calibration of the pump is now <strong>co</strong>mplete. The unit will<br />

return to the off state.<br />

USW200 - pump calibration<br />

a.Connect the 240V power supply to the system and leave the<br />

panel in the off state<br />

b.Press both buttons. The top and bottom level display LED’s<br />

will light.<br />

c.Press the right hand button. The top LED will go out leaving the<br />

bottom one lit.<br />

d.Ensure that the header inlet valve is shut or isolated and that<br />

any outside tap <strong>co</strong>nnected to the system is shut.<br />

e.Press the right hand button again. The lower two LEDs will now<br />

be lit.<br />

f.Open the header inlet valve and allow water to flow into the<br />

tank. (Any outside tap <strong>co</strong>nnected to the system should remain<br />

closed during this operation).<br />

g.Press the right hand button one last time.<br />

h.The calibration of the pump in now <strong>co</strong>mplete. The unit will<br />

return to the off state.<br />

Calibration of level display<br />

a. Press both buttons. The top and bottom level display LEDs<br />

will light.<br />

b. Press the left hand button. The lower level indicator led will go<br />

out leaving the top one lit.<br />

c. Ensure that the tank is full and that the level sensing tube is in<br />

its <strong>co</strong>rrect position.<br />

d. Press the left hand button.<br />

e. The level calibration is now <strong>co</strong>mplete.<br />

f. All four level LEDs will be lit and the unit will return to the off state.<br />

If difficulty is experienced calibrating the level display, lift the pump<br />

from the well and check that there are no water and air pockets<br />

trapped in the end of the tube. If there are pockets present,<br />

dis<strong>co</strong>nnect the tube from the <strong>co</strong>ntrol housing and blow through<br />

with a hand pump or <strong>co</strong>mpressed air supply. Re<strong>co</strong>nnect the tube to<br />

the <strong>co</strong>ntrol housing port first then lower the pump into the well.<br />

Operation<br />

USW100<br />

To operate, ensure that the RCD serving the installation is<br />

activated. Depress the ‘POWER’ button of the <strong>co</strong>ntrol panel until<br />

the power light is illuminated.<br />

The pump will momentarily pressurise the system ready for use,<br />

then shut down.<br />

When using a hose attachment such as a trigger operated jet,<br />

there will be a few se<strong>co</strong>nds delay when the tap is opened and the<br />

trigger depressed.<br />

Open the tap fully and keep the trigger depressed for<br />

approximately 5 se<strong>co</strong>nds to allow the pump to activate and repressurise<br />

the system.<br />

If the water level in the tank drops below the minimum level, the<br />

‘EMPTY’ light on the <strong>co</strong>ntrol panel will be lit and the pump will<br />

shut down until the water is replenished.<br />

Normally, the unit should be turned off after use, but during the<br />

winter months, if the <strong>co</strong>ntrol panel is fitted outside it is advisable<br />

to leave it switched on<br />

USW200<br />

To charge the system ready for use, firstly open any isolation<br />

valves in the re-cycled and mains water pipes.<br />

Ensure that the RCD serving the installation is activated. Depress<br />

the ‘POWER’ button of the <strong>co</strong>ntrol panel until the power light is<br />

illuminated. Providing that there is an adequate volume of water in<br />

the storage tank, the header tank will fill with re-cycled water. The<br />

pump will then shut down until water is drawn from the system.<br />

If the storage tank is empty when the system is turned on at the<br />

<strong>co</strong>ntrol panel, the ‘EMPTY’ light will be illuminated, the mains<br />

water solenoid valve will open and the header tank will fill via the<br />

mains water inlet valve.<br />

In the event of power failure to the <strong>co</strong>ntrol panel, the solenoid<br />

valve will automatically open to allow the header tank to operate<br />

from the mains water supply.<br />

When power is restored, the panel will need to be turned on<br />

again, otherwise both re-cycled and mains water supplies to the<br />

header tank will be cut off.<br />

The <strong>co</strong>ntrol panel in<strong>co</strong>rporates a timer facility which activates the<br />

‘clean filter’ reminder light. The solenoid valve is also activated<br />

periodically to ensure that it is ‘exercised’ when the system is<br />

mainly operating from re-cycled water.<br />

15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!