Nuclear Plant Journal Outage Management ... - Digital Versions
Nuclear Plant Journal Outage Management ... - Digital Versions
Nuclear Plant Journal Outage Management ... - Digital Versions
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Enabling Suppliers...<br />
Continued from page 31<br />
5. Please describe any innovative efforts<br />
of your organization in developing new<br />
suppliers for safety related products and<br />
services in the United States.<br />
AREVA is not just a designer, it<br />
is also a supplier. In this regard, we<br />
have demonstrated innovation by our<br />
aggressive efforts to provide certainty<br />
for the U.S. EPR program. The EPR <br />
plants will be truly made in America by<br />
American workers. For example, the<br />
recently announced AREVA Newport<br />
News, LLC, a joint venture with Northrop<br />
Grumman Shipbuilding, will manufacture<br />
heavy components in the USA. We are the<br />
only designer-supplier to have announced<br />
plans to construct new manufacturing<br />
facilities in the USA.<br />
All of our efforts in one way or<br />
another are innovative and demonstrate<br />
AREVA’s commitment to the industry,<br />
to the EPR design and deployment and<br />
establishment of a robust, safety-certified<br />
supply chain. Perhaps the strongest<br />
indicator of AREVA’s innovative approach<br />
to supply chain certainty is the fact that<br />
three EPR plants are currently under<br />
construction, one each in Finland, France<br />
and China – five additional projects are<br />
in the procurement phase with plans or<br />
option agreements to build more. This<br />
speaks to the certainty provided by our<br />
large global footprint and our innovative<br />
supply chain coordination efforts.<br />
EPR is a trademark of the AREVA<br />
Group.<br />
Contact: Susan Hess, AREVA NP<br />
Inc., 3315 Old Forest Road, Lynchburg,<br />
VA 24501; telephone: (434) 832-2379,<br />
fax: (434) 382-2379, email: susan.hess@<br />
areva.com.<br />
<br />
Longer term, we see opportunities to<br />
develop new supply chains in the United<br />
States and other nations.<br />
9. How does your organization ensure<br />
that the selected suppliers are cost effective<br />
and deliver the job on schedule?<br />
GE Hitachi <strong>Nuclear</strong> Energy exercises<br />
a competitive bidding process that<br />
includes only qualified suppliers. Our<br />
experience, as a nuclear industry leader<br />
for over five decades, demonstrates that<br />
this approach is a successful strategy for<br />
satisfying our customers’ needs.<br />
Contact: Ned Glascock, GE Hitachi<br />
<strong>Nuclear</strong>; fax: (910) 819-5549, email:<br />
edward.glascock@ge.com. <br />
<br />
has a special<br />
significance to us.<br />
And it does to your facility, too. With “N”, “NPT” and “NS” Certificates covering<br />
Class 1, 2 and 3 Valves, Pressure Vessels, Pumps, Supports, and Parts, code reconciliation,<br />
designing, supplying, replacing, and maintaining certified equipment is just part of our extensive<br />
repertoire of services. So besides being the first letter in our name, “N” gives us the “in” on<br />
providing superior ASME Section III N-Certificate products and services to the nuclear industry.<br />
And that’s always been our incentive.<br />
Call us when engineered<br />
excellence is indicated.<br />
NUCLEAR LOGISTICS INC<br />
> the single source<br />
www.nuclearlogistics.com 800.448.4124<br />
<strong>Nuclear</strong> <strong>Plant</strong> <strong>Journal</strong>, May-June 2009 www.nuclearplantjournal.com 35