20.11.2014 Views

National reform programme 2008-2010 Malta - European Commission

National reform programme 2008-2010 Malta - European Commission

National reform programme 2008-2010 Malta - European Commission

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Within this context, an MPA Steering Committee has been set up with a view to oversee the<br />

management and enforcement issues of the sites to be chosen or already chosen and will be<br />

in operation legally by 2009. It is envisaged that the MPA strategy will be approved for<br />

consultation by the end of <strong>2008</strong>. These developments have had an impact on the status of<br />

this measure which is slightly behind schedule. Notwithstanding, Government has:<br />

• Zoning plans;<br />

• Published educational material in relation to this MPA;<br />

• Carried out public consultation seminars;<br />

• Drafted the legal designation of the MPA.<br />

Measure 5.4<br />

Strengthen the institutional capacity for the implementation of the Nature Protection Acquis<br />

The <strong>Malta</strong> Environment and Planning Authority (MEPA) has benefited from a Twinning project<br />

with Austria (in consortium with Italy) 29 . Through this measure, MEPA has carried out various<br />

information meetings, seminars, workshops and general awareness raised. Moreover,<br />

additional staff has been trained by means of 15 week traineeships in this area.<br />

Measure 5.5<br />

Construction of three sewage treatment plants, all the sewage will be treated<br />

Over the 2005-<strong>2008</strong> period the Maltese Government has initiated the construction of three<br />

sewage treatment plans; in Gozo, the northern part and southern part of <strong>Malta</strong>. The aim of<br />

these new plants is to ensure that all treated sewage conforms to the standards laid out in the<br />

Urban Wastewater Directive. The Gozo plant was the first of the three new<br />

Wastewater Sewage Treatment Plants which was inaugurated in January <strong>2008</strong>. This new<br />

sewage treatment plant at Ras il-Ħobz, limits of Ghajnsielem which will eliminate the<br />

discharge of raw sewage into the sea. The North plant was completed in September <strong>2008</strong>.<br />

The plant is expected to be fully operational in October <strong>2008</strong>, when the biological treatment<br />

process is fully established.<br />

The contract for the construction of the South plant project has been signed in August <strong>2008</strong>.<br />

This will be the largest plant of all with a capacity to treat about 80% of all sewage generated<br />

on the Maltese Islands. Furthermore, the plant will restore bathing water quality status to the<br />

lower North Easterly coast spanning between Rinella and Zonqor, which is of significant<br />

importance both for the inhabitants of the areas, as well as the tourism potential due to the<br />

Smart City Project in the area.<br />

Measure 5.6<br />

Draft a national Environnent Technologies Action Plan.<br />

A departmental draft of the Plan has been finalised and will be adopted imminently. Some of<br />

the actions put forward within the draft ETAP have already been implemented. Such actions<br />

include environment related fiscal incentives and Green Public Procurement.<br />

Measure 5.7 and 5.9<br />

Prepare and implement Green Procurement Plan (GPP)<br />

The Maltese Government has launched the Green Office Label certification scheme for<br />

government ministries, departments and agencies which run their offices according to<br />

environmental best practices. These best practices adopted in the public sector include<br />

environmental planning, waste reduction, energy conservation, water conservation, transport<br />

and green public procurement.<br />

The GPP has been submitted for Ministerial approval however this measure is behind<br />

schedule.<br />

29 Information available online from: http://www.ppcd.gov.mt/twinning [Accessed on: 29 September <strong>2008</strong>]<br />

<strong>Malta</strong> <strong>National</strong> Reform Programme <strong>2008</strong>-<strong>2010</strong> - 24 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!