v. Receipt, storage, preservation and conservation of equipment at the site.<br />

vi. Pre-assembly, if any, erection testing and commissioning of all the equipment;<br />

vii. Reliability tests and performance and guarantee tests on completion of<br />

commissioning;<br />

viii. Loading, unloading and transportation as required.<br />

ix. Erection of equipments in Sub-station including civil works.<br />

x. Erection of lines of specified voltage.<br />

xi. Testing, Commissioning of substations and lines / installations<br />

xii. Storing before erection<br />

xiii. Getting the substations & lines inspected by Electrical Inspector after completion of<br />

work.<br />

xiv. Transportation and transit insurance of all free issue materials to be supplied from<br />

Owner‟s nearest stores to site and as well as all other required materials (under the<br />

scope of supply by bidder) from supplier‟s premises to work site, construction of new<br />

electrical / civil structures, etc.<br />

xv. Dismantling of existing electrical structures and return of these dismantled items at the<br />

Owner‟s stores, safe custody of the items and return of unused Owner‟s supplied<br />

materials to the Owner‟s stores.<br />

3.0 DEFINITION OF TERMS<br />

(i) The „Contract ‟means the agreement entered into between the Owner and the<br />

(ii)<br />

(iii)<br />

(iv)<br />

(v)<br />

Contractor as per the Contract Agreement signed by the parties, including all<br />

attachments and appendices there to and all documents incorporated by reference<br />

therein.<br />

„Owner‟ shall mean <strong>NESCO</strong> and shall include its legal representatives, successors<br />

and assigns.<br />

„Contractor‟ shall mean the Bidder whose bid will be accepted by the Owner for the<br />

award of the Works and shall include such successful Bidder‟s legal representatives,<br />

successors and permitted assigns.<br />

„Sub-Contractor‟ shall mean the person named in the Contract for any part of the<br />

works or any person to whom any part of the Contract has been sublet by the<br />

contractor with the consent in writing of the Owner and will include the legal<br />

representatives, successors and permitted assigns of such person.<br />

„Engineer in Charge‟ shall mean the officer appointed in writing by the Owner to act<br />

T . N : N E S C O / C A P E X / S U P P L Y & I N S T A L L A T I O N / 1 5 , D T D . 21. 0 1 . 1 3 Page 25