22.11.2014 Views

TENDER NOTICE NO. NESCO/ CAPEX/SUPPLY & INSTALLATION ...

TENDER NOTICE NO. NESCO/ CAPEX/SUPPLY & INSTALLATION ...

TENDER NOTICE NO. NESCO/ CAPEX/SUPPLY & INSTALLATION ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.14 “Project / Unit” shall mean supply of Materials as per enclosed technical specification.<br />

3.0 CONTRACT DOCUMENTS & PRIORITY:<br />

3.01 Contract Documents: The Specification, terms and conditions of the contract shall consist solely of these<br />

Tender conditions and offer sheet.<br />

3.02 Priority: Should there be any discrepancy between any terms hereto and any term of the offer sheet, the<br />

terms of this tender document shall prevail.<br />

4.0 SCOPE OF WORK:<br />

4.01 The “Scope of Work” shall be on the basis of Bidder‟s responsibility, completely covering the<br />

obligations, responsibility and workmanship, provided in this Bid Enquiry whether implicit or explicit.<br />

4.02 The Purchaser reserves the right to vary the quantity i.e increase or decrease, at the time of placing order or<br />

during project execution.<br />

4.03 All relevant drawings, data and instruction manuals and other necessary inputs shall be under the scope of<br />

contract.<br />

5.0 GENERAL REQUIREMENTS:<br />

5.01 The seller shall supply, deliver best quality Goods/Materials/Equipments & conduct the testing at their<br />

works of highest standards.<br />

6.0 The seller shall be responsible & shall comply with the provisions of all statutory acts i.e Electricity Act<br />

2003, Indian Electricity Rules 1956, Income Tax Act-1961 etc.<br />

T . N : N E S C O / C A P E X / S U P P L Y & I N S T A L L A T I O N / 1 5 , D T D . 21. 0 1 . 1 3 Page 44

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!