35.0 TRANSFER AND SUB-LETTING<br />

The Contractor shall not sublet, transfer, assign or otherwise part with the Contract or<br />

any part thereof, either directly or indirectly, without prior written permission of the<br />

Owner.<br />

36.0 FREE ISSUE OF MATERIALS<br />

36.01 Purchaser shall issue materials such as Transformer, VCB, Conductor, AB Cable &<br />

Accessories (Suspension Clamp, Dead End Clamp, Eye Hook, Piercing Connector,<br />

Neutral Connector), Transformer Distribution Boxes to the Contractor as per the works<br />

schedule agreed at the time of award of works as stated in the scope of work. However,<br />

this shall be subject to the actual progress of the work as certified by the Owner‟s<br />

Engineer.<br />

36.02 Before issue of the free issue materials the Contractor at its own cost shall arrange<br />

suitable stores adjacent to the works site and shall offer the same for inspection to the<br />

Owner‟s Engineer.<br />

36.03 The contractor shall furnish Indemnity bond for an amount equivalent to the<br />

estimated value of the free supply materials / dismantled materials returnable as<br />

certified by Engineer in charge. The Contractor shall submit Indemnity Bond in the<br />

prescribed format.<br />

36.04 Subject to compliance of above clauses, the Contractor shall be permitted to draw the<br />

materials from the designated stores of the Owner. The Contractor shall duly<br />

acknowledge the materials along with copies of the notification to the Insurer regarding<br />

such transit of material from designated stores of the Owner to the stores of the<br />

Contractor.<br />

36.05 After completion of the works all surplus materials shall be returned to the Purchaser‟s<br />

stores. For any shortage with regard to materials supplied by the Purchaser, the Purchaser<br />

shall be entitled to recover 125% of the purchase cost of such materials or present market<br />

cost, whichever is higher, from the dues of the Contractor.<br />

T . N : N E S C O / C A P E X / S U P P L Y & I N S T A L L A T I O N / 1 5 , D T D . 21. 0 1 . 1 3 Page 40