22.11.2014 Views

TENDER NOTICE NO. NESCO/ CAPEX/SUPPLY & INSTALLATION ...

TENDER NOTICE NO. NESCO/ CAPEX/SUPPLY & INSTALLATION ...

TENDER NOTICE NO. NESCO/ CAPEX/SUPPLY & INSTALLATION ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ANNEXURE – VII (A)<br />

To<br />

LETTER OF COMPLIANCE OF QUALIFYING REQUIREMENT<br />

(In case of Bidder being a Single Firm)<br />

<strong>CAPEX</strong> CELL<br />

Corporate Office , <strong>NESCO</strong>,<br />

Januganj,Balasore-756019<br />

Dear Sirs,<br />

I/We ……………. (Name of Bidder) are submitting the bid as a single firm. In support of our<br />

meeting the Qualifying requirements (QR) for bidders, stipulated in this tender specification,<br />

we furnish herewith the details/documents etc. as follows.<br />

Table – A: Previous Works Experience:<br />

Package<br />

Quoted<br />

for<br />

Description<br />

of Proposed<br />

Works<br />

Tender<br />

Qty<br />

Sl.<br />

No.<br />

FY<br />

Qty Installed & Commissioned<br />

Name<br />

of<br />

Client<br />

WO Ref<br />

Qty<br />

Installed<br />

Documents<br />

provided in<br />

proof of having<br />

executed the<br />

works during<br />

the relevant<br />

FY.<br />

Table – B: Average Annual Turnover:<br />

Package Quoted for<br />

Estimated<br />

Cost of the<br />

Package<br />

(Rs. in Lakh)<br />

Annual Turnover Data<br />

(Rs. in Lakh)<br />

Financial Year<br />

Last Three Year preceding to<br />

the year of tender<br />

Turnover<br />

(Rs. in Lakh)<br />

Total Estimated Cost of<br />

the packages quoted for<br />

Average Turnover<br />

T . N : N E S C O / C A P E X / S U P P L Y & I N S T A L L A T I O N / 1 5 , D T D . 21. 0 1 . 1 3 Page 74

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!