TENDER NOTICE NO. NESCO/ CAPEX/SUPPLY & INSTALLATION ...
TENDER NOTICE NO. NESCO/ CAPEX/SUPPLY & INSTALLATION ...
TENDER NOTICE NO. NESCO/ CAPEX/SUPPLY & INSTALLATION ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
ANNEXURE – VII (A)<br />
To<br />
LETTER OF COMPLIANCE OF QUALIFYING REQUIREMENT<br />
(In case of Bidder being a Single Firm)<br />
<strong>CAPEX</strong> CELL<br />
Corporate Office , <strong>NESCO</strong>,<br />
Januganj,Balasore-756019<br />
Dear Sirs,<br />
I/We ……………. (Name of Bidder) are submitting the bid as a single firm. In support of our<br />
meeting the Qualifying requirements (QR) for bidders, stipulated in this tender specification,<br />
we furnish herewith the details/documents etc. as follows.<br />
Table – A: Previous Works Experience:<br />
Package<br />
Quoted<br />
for<br />
Description<br />
of Proposed<br />
Works<br />
Tender<br />
Qty<br />
Sl.<br />
No.<br />
FY<br />
Qty Installed & Commissioned<br />
Name<br />
of<br />
Client<br />
WO Ref<br />
Qty<br />
Installed<br />
Documents<br />
provided in<br />
proof of having<br />
executed the<br />
works during<br />
the relevant<br />
FY.<br />
Table – B: Average Annual Turnover:<br />
Package Quoted for<br />
Estimated<br />
Cost of the<br />
Package<br />
(Rs. in Lakh)<br />
Annual Turnover Data<br />
(Rs. in Lakh)<br />
Financial Year<br />
Last Three Year preceding to<br />
the year of tender<br />
Turnover<br />
(Rs. in Lakh)<br />
Total Estimated Cost of<br />
the packages quoted for<br />
Average Turnover<br />
T . N : N E S C O / C A P E X / S U P P L Y & I N S T A L L A T I O N / 1 5 , D T D . 21. 0 1 . 1 3 Page 74