Division<br />
TABLE - A<br />
PACKAGE WISE MINIMMUM QUALIFYING REQUIREMENTS - <strong>NESCO</strong><br />
Construction of<br />
Construction of<br />
New/Up- LT Lines/AB Construction of<br />
New/Upgradation/Renovati<br />
Cabling/Higher New/Up-gradation<br />
gradation 33/11<br />
on of 11 Kv Line or Voltage Lines in of 11 Kv Sub-<br />
Kv Sub-Station<br />
higher Voltage in<br />
Km<br />
Station in Nos.<br />
in Nos.<br />
Km<br />
Balasore Electrical<br />
Division 0 38<br />
Anandapur Electrical<br />
Division<br />
0 75<br />
Joda Electrical<br />
Division 0 54<br />
Keonjhar Electrical<br />
Division 0<br />
10 Km. LT line or<br />
5 Km. HT Line<br />
10 Km. LT line or 5<br />
Km. HT Line<br />
10 Km. LT line or<br />
5 Km. HT Line<br />
48 10 Km. LT line or<br />
5 Km. HT Line<br />
5 No. 11/0.4 KV<br />
S/S<br />
5 No. 11/0.4 KV<br />
S/S<br />
5 No. 11/0.4 KV<br />
S/S<br />
5 No. 11/0.4 KV<br />
S/S<br />
“The bidder must have executed the quantum of work as mentioned in the Table A above during the<br />
last three financial years preceding to the year of tender notification and should have successful<br />
operation of minimum period of one year. Bidder must enclose copies of the relevant work orders<br />
along with client certified copies of Final Invoices and/or Performance Certificates dully signed by<br />
the competent authority of the client and/or Final Inspection certificate issued by Electrical<br />
Inspector in proof of having executed the desired quantum of works during the last three financial<br />
years.”<br />
(c) If the bidder(s) participate in multiple packages, the qualifying requirement for work<br />
experience shall be considered /evaluated independently/separately for each package.<br />
However, the qualifying requirement for Turn Over shall be added together to<br />
qualify the Turnover requirement for each package(s).<br />
No bidder shall be awarded work order for more than Two (2) Packages<br />
irrespective of nos. of packages for which he has submitted the bid.<br />
(d) The minimum average Annual Turnover of the bidder in any best three financial years<br />
out of last five financial years should not be less than 50% of the estimated value of all<br />
the items quoted by the bidder(s).<br />
(e) Bidder shall be financially sound and stable having liquid assets as stated in the<br />
enclosed format and/or access to credit facility of not less than one fifth of estimated cost<br />
of the package(s) for which he has submitted the bid.<br />
T . N : N E S C O / C A P E X / S U P P L Y & I N S T A L L A T I O N / 1 5 , D T D . 21. 0 1 . 1 3 Page 7