22.11.2014 Views

TENDER NOTICE NO. NESCO/ CAPEX/SUPPLY & INSTALLATION ...

TENDER NOTICE NO. NESCO/ CAPEX/SUPPLY & INSTALLATION ...

TENDER NOTICE NO. NESCO/ CAPEX/SUPPLY & INSTALLATION ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Division<br />

TABLE - A<br />

PACKAGE WISE MINIMMUM QUALIFYING REQUIREMENTS - <strong>NESCO</strong><br />

Construction of<br />

Construction of<br />

New/Up- LT Lines/AB Construction of<br />

New/Upgradation/Renovati<br />

Cabling/Higher New/Up-gradation<br />

gradation 33/11<br />

on of 11 Kv Line or Voltage Lines in of 11 Kv Sub-<br />

Kv Sub-Station<br />

higher Voltage in<br />

Km<br />

Station in Nos.<br />

in Nos.<br />

Km<br />

Balasore Electrical<br />

Division 0 38<br />

Anandapur Electrical<br />

Division<br />

0 75<br />

Joda Electrical<br />

Division 0 54<br />

Keonjhar Electrical<br />

Division 0<br />

10 Km. LT line or<br />

5 Km. HT Line<br />

10 Km. LT line or 5<br />

Km. HT Line<br />

10 Km. LT line or<br />

5 Km. HT Line<br />

48 10 Km. LT line or<br />

5 Km. HT Line<br />

5 No. 11/0.4 KV<br />

S/S<br />

5 No. 11/0.4 KV<br />

S/S<br />

5 No. 11/0.4 KV<br />

S/S<br />

5 No. 11/0.4 KV<br />

S/S<br />

“The bidder must have executed the quantum of work as mentioned in the Table A above during the<br />

last three financial years preceding to the year of tender notification and should have successful<br />

operation of minimum period of one year. Bidder must enclose copies of the relevant work orders<br />

along with client certified copies of Final Invoices and/or Performance Certificates dully signed by<br />

the competent authority of the client and/or Final Inspection certificate issued by Electrical<br />

Inspector in proof of having executed the desired quantum of works during the last three financial<br />

years.”<br />

(c) If the bidder(s) participate in multiple packages, the qualifying requirement for work<br />

experience shall be considered /evaluated independently/separately for each package.<br />

However, the qualifying requirement for Turn Over shall be added together to<br />

qualify the Turnover requirement for each package(s).<br />

No bidder shall be awarded work order for more than Two (2) Packages<br />

irrespective of nos. of packages for which he has submitted the bid.<br />

(d) The minimum average Annual Turnover of the bidder in any best three financial years<br />

out of last five financial years should not be less than 50% of the estimated value of all<br />

the items quoted by the bidder(s).<br />

(e) Bidder shall be financially sound and stable having liquid assets as stated in the<br />

enclosed format and/or access to credit facility of not less than one fifth of estimated cost<br />

of the package(s) for which he has submitted the bid.<br />

T . N : N E S C O / C A P E X / S U P P L Y & I N S T A L L A T I O N / 1 5 , D T D . 21. 0 1 . 1 3 Page 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!