lublin, 11 May 2011<br />

Port Lotniczy <strong>Lublin</strong> S.A.<br />

ul. Hempla 6, 20-008 <strong>Lublin</strong>, PL<br />

tel. +48 81 534 74 40; fax: +48 81 534 74 41<br />

info@airport.lublin.pl<br />

www.airport.lublin.pl<br />

Mr Krzysztof Żuk<br />

Mayor of <strong>Lublin</strong> City<br />

Plac Łokietka 1<br />

20-950 <strong>Lublin</strong><br />

L. Dz. 14/V/PLL-KS/2011<br />

We would like to inform that our company is carrying out the project <strong>Lublin</strong> Regional Airport Expansion: <strong>Lublin</strong><br />

Airport Joint Stock Co. in Świdnik.<br />

other<br />

endorsement<br />

Planning permission for building the airport was granted by the Voivode of the Lubelskie Voivodeship on 18.10.2010.<br />

The airport will have a 2550 meters long runaway, a taxiway, an apron for 8 aircrafts and a terminal ready to receive<br />

1 million passengers per annum with the possibility of expansion to 3.2 million.<br />

At the moment the following expansion works are being conducted: levelling of the airport grounds, redeveloping of<br />

the utility lines network, building of the apron.<br />

The contracts for construction of the centre of the runway, the taxiway and the terminal building and outbuildings has<br />

been put out to tender. Those contracts will be signed by the end of June of the current year.<br />

The total value of the investment is PLN 350 000 000.<br />

We declare that the means for financing the investment are guaranteed by the shareholders of the Company, that is<br />

<strong>Lublin</strong> Municipality, <strong>Lublin</strong> Voivodeship, Świdnik Municipality, Świdnik District and by the contract negotiated with<br />

the Bank for the issue of bonds. The model of financing the investment as well as the whole documentation of the<br />

project and all strategic guidelines including air travel forecasts, are closely monitored by the review body Jaspers<br />

with Mr. Artur Rudnicki (a.rudnicki@eib.org) as its head. All our guidelines to date were approved by Mr. Rudnicki<br />

and the review body Jaspers.<br />

With regards to the technical side, we cooperate also with a government body, that is Polish Air Navigation Services<br />

Agency, which will use the devices installed at the airport to navigate aircraft in the airspace (the right contracts have<br />

already been signed).<br />

Our airport will be connected with the voivodeship road no. 822 and the exit will lead from rout S-17, the <strong>Lublin</strong>’s ring<br />

road. There will also be a railway connection between the airport and the Warsaw-Dorohusk line. A railway platform<br />

will be built at the airport.<br />

The planned time of finalizing the expansion works and opening of the airport is June 2012.<br />

Legal Representative<br />

<strong>Lublin</strong> Airport Joint Stock Co.<br />

Konrad Burdziński<br />