A/E Scope <strong>of</strong> Work<br />
Las Vegas ATCT/TRACON<br />
I. INTRODUCTION<br />
The <strong>Federal</strong> <strong>Aviation</strong> <strong>Administration</strong> (FAA) intends to replace the existing Airport Traffic<br />
Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) facilities at McCarran<br />
International Airport (LAS) in Las Vegas, Nevada. McCarran Airport is one <strong>of</strong> the busiest<br />
airports in the United States, with the ATCT handling more than 619,000 air traffic operations<br />
in 2007 and the TRACON handling over 700,000. The A/E shall design a Major Activity Level<br />
(MAL) ATCT, and an adjacent Base Building/TRACON on a site near the new Terminal 3<br />
building at McCarran Airport. When commissioned, these facilities will provide state-<strong>of</strong>-the-art<br />
air traffic services well into the 21 st century. To complete the design phase <strong>of</strong> this project, the<br />
FAA will need to procure the services <strong>of</strong> an architectural/engineering (A/E) firm.<br />
II. SCOPE<br />
The FAA will utilize the Western Service Area’s (WSA) existing Qualified Vendor List (QVL) <strong>of</strong><br />
A/E firms to award this <strong>work</strong>. A/E firms on the QVL that are interested in acquiring a contract<br />
for this project will be required to submit a technical proposal and a price proposal. The<br />
technical proposal shall comply with the applicable QVL requirements as well as this Scope <strong>of</strong><br />
Work (SOW). The requirements for the technical proposal are outlined in Section III.<br />
The technical proposals from each prospective vendor will be evaluated by FAA utilizing a<br />
qualitative ranking system. Since the award <strong>of</strong> this A/E contract will not be based solely on<br />
cost, the price proposal is not as important as the technical proposal. If the qualitative<br />
evaluation process results in two or more <strong>of</strong> the highest ranked firms with equal or similar<br />
rankings, then the price proposals can be used to award the final contract.<br />
After contract award, the FAA <strong>Contract</strong>ing Officer will issue a Notice-to-Proceed (NTP).<br />
Immediately upon receipt <strong>of</strong> the NTP, the A/E shall begin the engineering <strong>work</strong>. The A/E will<br />
have 480 calendar days after NTP to complete the <strong>work</strong>. The design shall be submitted to the<br />
FAA for review at the Project Planning Document (PPD), 35%, 70%, and 100% stages. After<br />
comments from the 100% review have been incorporated, the final design shall be submitted<br />
to FAA. All deliverables shall be final and complete at the end <strong>of</strong> the performance time. The<br />
FAA will require 30 days to review and issue comments at each <strong>of</strong> the review stages. The time<br />
required for review is considered part <strong>of</strong> the 480-calendar day performance time; therefore, the<br />
A/E should proceed with the design during the review periods to the extent possible. At each<br />
review phase, the FAA Project Engineer will assemble the comments and send a copy to the<br />
A/E firm via electronic mail. Shortly after receiving the comments, the A/E shall host a meeting<br />
at their <strong>of</strong>fice to discuss the comments and their disposition.<br />
All <strong>work</strong> under this contract shall be performed in accordance with this SOW, technical input<br />
from the FAA, model building codes, FAA design orders and standards, guidelines, and local<br />
authorities having jurisdiction. The A/E shall furnish sufficient skilled technical, supervisory,<br />
and administrative personnel to ensure the expeditious completion <strong>of</strong> the <strong>work</strong> specified herein<br />
within the allotted time frames.<br />