Client Project Description Summary HMM Services<br />

Eastern Gulf Crude Access Project - Preliminary Survey on 90 miles<br />

Project Management, Survey, Field<br />

<strong>of</strong> proposed 30-inch crude <strong>oil</strong> <strong>pipeline</strong> <strong>and</strong> Project Management<br />

1 Energy Transfer Company<br />

Engineering, Construction<br />

overseeing all preliminary aspects <strong>of</strong> 150 miles <strong>of</strong> proposed 30-inch<br />

Management<br />

crude <strong>oil</strong> <strong>pipeline</strong> in Louisiana.<br />

2 Iroquois Gas Transmission<br />

3 Gulf South Pipeline Co., LP 2014 Projects Estimating<br />

Project Management & Engineering - Athens/Croghan/Newtown -<br />

Various facility Capital Improvement Projects including<br />

launcher/receiver <strong>and</strong> fuel system upgrades<br />

4 Spectra Energy Salem Lateral - 2 miles <strong>of</strong> 16" <strong>pipeline</strong> in MA<br />

5 NiSource CPG Giles County Pipeline Project<br />

6 NiSource<br />

Columbia DSPs - Project scoping for multiple <strong>pipeline</strong> projects in the<br />

northeast.<br />

Project Management, Facility<br />

Engineering, Procurement,<br />

Construction Management <strong>and</strong><br />

Inspection<br />

Project Scope Estimating, Budget<br />

Estimating<br />

Engineering, Mapping/Drafting/GIS,<br />

HDD Design<br />

Project Management, Drafting/Design<br />

(Mechanical <strong>and</strong> Mapping), Survey<br />

Scheduling, Estimating, Environmental<br />

Permitting, Engineering,<br />

Drafting/Mapping/GIS, Design Support<br />

Packages<br />

7 <strong>Mott</strong> MacDonald INTGN - Altamira Compressor Station Project Process Engineering Review<br />

8<br />

Gulf South Pipeline<br />

Inspection Support for new Marcellus Shale <strong>gas</strong> gathering system in<br />

Company, LP<br />

Susquehanna County, PA<br />

Record/turnover package assistance.<br />

9<br />

Laurel Mountain Midstream,<br />

Feasibility Study/Report for HDD<br />

HDD Peer Review, Greene County, PA<br />

LLC<br />

alignment<br />

10 Next Decade, LLC<br />

Pangea - STLNG Concept Development, 27 mile long LNG Export Feasibility Study/Report, Hydraulic<br />

<strong>pipeline</strong> - Pre-feed study, San Patricio County, TX<br />

modeling <strong>and</strong> cost estimating<br />

11<br />

Laurel Mountain Midstream,<br />

Detailed Enginering design for two<br />

HDD Design - Broome County, NY<br />

LLC<br />

HDD crossings.<br />

12 Tennessee Gas Pipeline Multiple Anomaly Remediation Projects in MA, NH, RI & NY<br />

Survey/Data Processing,<br />

Environmental Survey, Permitting &<br />

Inspection Services<br />

Preliminary Engineering, Detailed<br />

13<br />

TransCanada U.S. Supply Carty Lateral Project – 24.3 miles <strong>of</strong> 20-inch <strong>pipeline</strong> <strong>and</strong> facilities in Engineering, Drafting, Survey<br />

Chain Operations<br />

Marrow County, oregon<br />

Coordination <strong>and</strong> Project Management<br />

Material Selection<br />

14 Boardwalk BFS - Pettus Interconnect Meter Station<br />

Project Management, Facility<br />

Engineering, Facility Drafting, Facility<br />

Asbuilt<br />

15 Boardwalk BFS - Flag City Catwalks Engineering, Design, Drafting<br />

16 Boardwalk Kentucky Utilities - Cane Run IC<br />

17 Energy Transfer Company<br />

Jackson Residue Header - 3.6 miles <strong>of</strong> 30" <strong>pipeline</strong> laterial with three<br />

meter stations<br />

18 Energy Transfer Company EOG H<strong>of</strong>f - Pipeline & Meter Station - LaSalle County, TX<br />

19 Energy Transfer Company<br />

20 Energy Transfer Company<br />

21 Energy Transfer Company Eagleford Misc.<br />

Dubose to Cuero - 16" high pressure <strong>gas</strong> <strong>pipeline</strong> with valves liquids<br />

h<strong>and</strong>ling & pigging facilities<br />

REM Loop - 36 miles <strong>of</strong> <strong>pipeline</strong> <strong>and</strong> facilties from Tilden Compressor<br />

Staion to ETC Kenedy Plant<br />

22 Targa Patriot Facility Expansion - 8" & 20" bi-directional launcher/receiver<br />

Project Management, Facility<br />

Engineering, Facility Drafting, Facility<br />

Asbuilt<br />

Preliminary <strong>and</strong> Asbuilt Surveying,<br />

Drafting, Project Management &<br />

Engineering<br />

Project Management, Engineering,<br />

Mapping, Drafting & Survey<br />

Project Management, Engineering,<br />

Mapping, Drafting & Survey<br />

Preliminary Survey, Design, Drafting,<br />

Project Management, Engineering<br />

Project Management, Pipeline<br />

Engineering, Facilities Engineering,<br />

Mapping & Drafting<br />

Pipeline Construction Support,<br />

Engineering & Drafting<br />

23 Targa ACL to Cemex Pipeline - 20" Launcher/receiver Engineering & Drafting<br />

24 Targa<br />

Export Pipeline - 12" 27 mile <strong>pipeline</strong> with associated facilities<br />

(launchers/receivers/MLVs)<br />

25 Energy Transfer Company Kenedy to Southcross - Meter Station<br />

26 Southern Union Gas<br />

OCI Methanol Interconnect - 200MMSCFD meter station delivery to<br />

OCI Methanol Plant in Jefferson County, TX<br />

Lupus, MS<br />

27 Southern Star<br />

Install one (1) 8" high pressure crude <strong>oil</strong> line including one (1) HDD<br />

that crosses the Missouri River, retire a set <strong>of</strong> 8" Launcher/Receiver<br />

pig traps<br />

28 Southern Star<br />

29 Boardwalk<br />

Representative Pipeline, Oil & Gas Industry Projects - US<br />

Leavensworth, KS<br />

Install two (2) 16" high pressure <strong>gas</strong> transmission <strong>pipeline</strong>s in<br />

Leavensworth, KS including two (2) HDDs crossing the Missouri River<br />

Southeast Market Expansion<br />

New construction 30 inch & 24 inch natural <strong>gas</strong> <strong>pipeline</strong>s<br />

Pipeline Construction Support,<br />

Engineering & Mapping & Facility<br />

Drafting<br />

Engineering, Design, Survey<br />

Project Management, Pipeline<br />

Engineering, Mapping & Drafting,<br />

MicroStation<br />

Project Management, Pipeline<br />

Engineering, Mapping & Drafting,<br />

MicroStation<br />

Project Management, Pipeline<br />

Engineering, Survey, Mapping &<br />

Drafting<br />

December 2012 Page 1 <strong>of</strong> 7