24.12.2014 Views

statement of qualifications pipeline, oil and gas services - Hatch Mott ...

statement of qualifications pipeline, oil and gas services - Hatch Mott ...

statement of qualifications pipeline, oil and gas services - Hatch Mott ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Representative Horizontal Directional Drilling Projects<br />

Client Project Location Scope<br />

Carrier Pipe<br />

Diameter<br />

HDD Crossing<br />

Lengths (feet)<br />

1 Confidential Client Confidential Project Northeast US<br />

Feasibility <strong>and</strong> Design for several HDD<br />

<strong>and</strong> auger bore crossings <strong>of</strong> rivers,<br />

highways, railways, <strong>and</strong> wetl<strong>and</strong>s<br />

36-inch<br />

6,000 HDD River<br />

4,000 HDD River<br />

2 Confidential Client Confidential Project Northeast US<br />

Feasibility <strong>and</strong> Preliminary Design for<br />

three options <strong>of</strong> crossing a significant<br />

water body.<br />

24-inch 4,000 to 8,300<br />

3 Energy Transfer/Kinder Morgan Fayetteville Express Pipeline Arkansas/Mississippi<br />

Design <strong>of</strong> 9 HDD crossings under<br />

waterbodies, wetl<strong>and</strong>s, highways <strong>and</strong><br />

railroads<br />

42-inch 1600 to 5,500<br />

4 Copano Energy Port <strong>of</strong> Corpus Christi Corpus Christi, TX<br />

HDD Design <strong>and</strong> Construction<br />

Management<br />

16-inch 6,000 <strong>and</strong> 6,700<br />

5 Confidential Client Confidential Project Northeast US<br />

Feasbility <strong>and</strong> Preliminary Design -<br />

Hudson River Crossing<br />

42-inch 6,544<br />

6 Confidential Client Confidential Project Northeast US<br />

Feasbility <strong>and</strong> Preliminary Design -<br />

Interstate 84 Crossing<br />

42-inch 2,500<br />

7 Confidential Client Confidential Project Northeast US<br />

Feasbility <strong>and</strong> Preliminary Design - US<br />

Route 7 Crossing<br />

42-inch 2,700<br />

8 NYDEP New York Expansion Project New York City, NY HDD Design Review 30-inch 4,737 <strong>and</strong> 5,196<br />

9 Southern Star Transmission Main St. Louis, Missouri HDD Feasibility <strong>and</strong> Preliminary Design 24-inch 3,700 <strong>and</strong> 5,800<br />

Page 1 <strong>of</strong> 8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!