24.12.2014 Views

statement of qualifications pipeline, oil and gas services - Hatch Mott ...

statement of qualifications pipeline, oil and gas services - Hatch Mott ...

statement of qualifications pipeline, oil and gas services - Hatch Mott ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Representative Horizontal Directional Drilling Projects<br />

Client Project Location Scope<br />

Carrier Pipe<br />

Diameter<br />

HDD Crossing<br />

Lengths (feet)<br />

20 Eastern Shore Natural Gas 2006-2008 Expansion Project<br />

Delaware &<br />

Pennsylvania<br />

Design <strong>of</strong> over 20 HDD crossings under<br />

waterbodies, wetl<strong>and</strong>s, highways <strong>and</strong><br />

railroads<br />

6-inch<br />

10-inch<br />

16-inch<br />

1,000 to 3,000<br />

21<br />

Netarts Oceanside Sanitary<br />

District<br />

Ocean Outfall Project<br />

Oceanside, Oregon<br />

Design <strong>and</strong> Construction Management for<br />

a new ocean outfall including a4,100 foot<br />

long HDD shore crossing<br />

14-inch 4,100<br />

22 Gulf South/Boardwalk Pipeline Southeast Expansion Mississippi/Alabama<br />

Design <strong>of</strong> 12 HDD crossings under<br />

waterbodies, wetl<strong>and</strong>s, highways <strong>and</strong><br />

railroads<br />

42-inch 1,500 to 3,500<br />

23 Enterprise Pipeline A/S Channel Pipeline Texas Highway #288 - Class Changeout 30-inch 1,300<br />

24 National Fuel Gas Chemung River Crossing Corning, New York River, Interstate <strong>and</strong> Railroad Crossing 24-inch 2,500<br />

25 Ocean Science Centre Deep Sea Water Intake Project<br />

St. John's,<br />

Newfoundl<strong>and</strong><br />

Ocean shore crossing 14-inch 1,600<br />

26<br />

Sanitation District No. 1 <strong>of</strong><br />

Northern Kentucky<br />

Wayman Branch Sanitary Sewer<br />

Replacement Project<br />

Covington, Kentucky<br />

Design <strong>and</strong> Construction Management <strong>of</strong><br />

a new replacement sanitary sewer.<br />

22-inch 1,100<br />

27<br />

Sanitation District No. 1 <strong>of</strong><br />

Northern Kentucky<br />

Highl<strong>and</strong> Pike Sanitary Sewer<br />

Replacement Project<br />

Covington, Kentucky<br />

Design <strong>of</strong> a new gravity sewer through a<br />

hillside experiencing slope failures<br />

22-inch 2,400<br />

28 Energy Transfer Ponder to Paris (Texas) Pipeline North Texas<br />

Design <strong>of</strong> 3 HDD crossings under<br />

waterbodies, wetl<strong>and</strong>s, highways <strong>and</strong><br />

railroads<br />

36-inch 1,100 to 3,700<br />

29 Energy Transfer Bethel to Texoma Pipeline Texas<br />

Design <strong>of</strong> 6 HDD crossings under<br />

waterbodies, wetl<strong>and</strong>s, highways <strong>and</strong><br />

railroads<br />

42-inch 1,300 to 3,600<br />

Page 3 <strong>of</strong> 8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!