Representative Horizontal Directional Drilling Projects<br />

Client Project Location Scope<br />

Carrier Pipe<br />

Diameter<br />

HDD Crossing<br />

Lengths (feet)<br />

10 TransCanada Pipelines Ltd.<br />

Parkway Loop Mainline Extension -<br />

West Section<br />

Brampton, Ontario HDD Constructability Review 42-inch 1,700<br />

11 TransCanada Pipelines Ltd.<br />

Peace River Crossing -<br />

Groundbirch Mainline Project<br />

Fort St. John, BC Trenchless Constructability Review 42 or 48 inch 6,100<br />

12 Santa Rosa County Navanne Beach Water Supply<br />

Santa Rosa Sound,<br />

Florida<br />

Design & permitting for Waterway & State<br />

Highway<br />

14-inch 7,400<br />

13 Nalcor Energy L<strong>and</strong>fall Crossings<br />

Newfoundl<strong>and</strong> <strong>and</strong><br />

Labrador<br />

Feasibility Review, Risk Assessment,<br />

Design <strong>and</strong> construction management <strong>of</strong><br />

6 ocean shoreline crossings<br />

14- to 20-inch<br />

three 5,132 feet <strong>and</strong><br />

three 7,218 feet<br />

14<br />

New York Department <strong>of</strong><br />

Environmental Protection<br />

Hudson River Crossing <strong>and</strong> 18th<br />

Street Long Slip Crossing<br />

New York City, NY<br />

Design review <strong>and</strong> risk assessment for<br />

two 30-inch diameter HDD installations<br />

30-inch<br />

4,737 ft <strong>and</strong> 5,196<br />

feet<br />

15 Nalcor Energy<br />

L<strong>and</strong>fall Crossing -Pilot Bore<br />

Investigation<br />

Newfoundl<strong>and</strong> <strong>and</strong><br />

Labrador<br />

Design <strong>and</strong> Construction Management <strong>of</strong><br />

a pilot bore installation as part <strong>of</strong> a<br />

geotechnical investigation<br />

10-inch pilot bore<br />

partially reamed<br />

to 24-inch<br />

5,111<br />

16<br />

Emerald Coast Utilities<br />

Authority<br />

Pensacola Beach Water Supply<br />

Santa Rosa Sound,<br />

Florida<br />

Geometric Design, Permitting, Bidding<br />

Services <strong>and</strong> Construction Management<br />

HDD crossing under waterway<br />

30-inch casing &<br />

24-inch carrier<br />

5,300<br />

17 Missouri-American Water Co. Source <strong>of</strong> Supply Project<br />

Missouri River, St.<br />

Louis <strong>and</strong> St. Charles<br />

Counties, MO<br />

Geometric Design, Permitting, Bidding<br />

Services <strong>and</strong> Construction Management<br />

HDD crossing under waterway<br />

36-inch 4,692<br />

18 Cheniere Energy 42-inch Ceole Trail Pipeline Southwest Louisiana<br />

19 Eastern Shore Natural Gas 2003-2005 Expansion Project<br />

Delaware &<br />

Pennsylvania<br />

Geometric Design <strong>and</strong> Construction<br />

Management <strong>of</strong> 8 HDD crossings under<br />

waterbodies, wetl<strong>and</strong>s <strong>and</strong> major<br />

highways<br />

Design <strong>and</strong> Construction Management <strong>of</strong><br />

over 20 HDD crossings under<br />

waterbodies, wetl<strong>and</strong>s, highways <strong>and</strong><br />

railroads<br />

42-inch 2,000 to 4,000<br />

6-inch<br />

10-inch<br />

16-inch<br />

1,000 to 3,000<br />

Page 2 <strong>of</strong> 8