Representative Horizontal Directional Drilling Projects<br />
Client Project Location Scope<br />
Carrier Pipe<br />
Diameter<br />
HDD Crossing<br />
Lengths (feet)<br />
10 TransCanada Pipelines Ltd.<br />
Parkway Loop Mainline Extension -<br />
West Section<br />
Brampton, Ontario HDD Constructability Review 42-inch 1,700<br />
11 TransCanada Pipelines Ltd.<br />
Peace River Crossing -<br />
Groundbirch Mainline Project<br />
Fort St. John, BC Trenchless Constructability Review 42 or 48 inch 6,100<br />
12 Santa Rosa County Navanne Beach Water Supply<br />
Santa Rosa Sound,<br />
Florida<br />
Design & permitting for Waterway & State<br />
Highway<br />
14-inch 7,400<br />
13 Nalcor Energy L<strong>and</strong>fall Crossings<br />
Newfoundl<strong>and</strong> <strong>and</strong><br />
Labrador<br />
Feasibility Review, Risk Assessment,<br />
Design <strong>and</strong> construction management <strong>of</strong><br />
6 ocean shoreline crossings<br />
14- to 20-inch<br />
three 5,132 feet <strong>and</strong><br />
three 7,218 feet<br />
14<br />
New York Department <strong>of</strong><br />
Environmental Protection<br />
Hudson River Crossing <strong>and</strong> 18th<br />
Street Long Slip Crossing<br />
New York City, NY<br />
Design review <strong>and</strong> risk assessment for<br />
two 30-inch diameter HDD installations<br />
30-inch<br />
4,737 ft <strong>and</strong> 5,196<br />
feet<br />
15 Nalcor Energy<br />
L<strong>and</strong>fall Crossing -Pilot Bore<br />
Investigation<br />
Newfoundl<strong>and</strong> <strong>and</strong><br />
Labrador<br />
Design <strong>and</strong> Construction Management <strong>of</strong><br />
a pilot bore installation as part <strong>of</strong> a<br />
geotechnical investigation<br />
10-inch pilot bore<br />
partially reamed<br />
to 24-inch<br />
5,111<br />
16<br />
Emerald Coast Utilities<br />
Authority<br />
Pensacola Beach Water Supply<br />
Santa Rosa Sound,<br />
Florida<br />
Geometric Design, Permitting, Bidding<br />
Services <strong>and</strong> Construction Management<br />
HDD crossing under waterway<br />
30-inch casing &<br />
24-inch carrier<br />
5,300<br />
17 Missouri-American Water Co. Source <strong>of</strong> Supply Project<br />
Missouri River, St.<br />
Louis <strong>and</strong> St. Charles<br />
Counties, MO<br />
Geometric Design, Permitting, Bidding<br />
Services <strong>and</strong> Construction Management<br />
HDD crossing under waterway<br />
36-inch 4,692<br />
18 Cheniere Energy 42-inch Ceole Trail Pipeline Southwest Louisiana<br />
19 Eastern Shore Natural Gas 2003-2005 Expansion Project<br />
Delaware &<br />
Pennsylvania<br />
Geometric Design <strong>and</strong> Construction<br />
Management <strong>of</strong> 8 HDD crossings under<br />
waterbodies, wetl<strong>and</strong>s <strong>and</strong> major<br />
highways<br />
Design <strong>and</strong> Construction Management <strong>of</strong><br />
over 20 HDD crossings under<br />
waterbodies, wetl<strong>and</strong>s, highways <strong>and</strong><br />
railroads<br />
42-inch 2,000 to 4,000<br />
6-inch<br />
10-inch<br />
16-inch<br />
1,000 to 3,000<br />
Page 2 <strong>of</strong> 8