statement of qualifications pipeline, oil and gas services - Hatch Mott ...
statement of qualifications pipeline, oil and gas services - Hatch Mott ...
statement of qualifications pipeline, oil and gas services - Hatch Mott ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Manasquan/Ocean County Pipeline<br />
Location<br />
Monmouth <strong>and</strong> Ocean<br />
Counties, NJ<br />
Client<br />
New Jersey American Water<br />
Services<br />
Hydraulic Analysis<br />
Design<br />
SCADA Instrumentation<br />
& Control System<br />
Plans <strong>and</strong> Specifications<br />
Cost Estimates<br />
Permit Applications<br />
Construction Administration<br />
Resident Observation<br />
Project Description<br />
In order to provide New Jersey-American<br />
Water’s (NJAW) Barrier Isl<strong>and</strong> system with<br />
a reliable supply <strong>of</strong> water <strong>and</strong> to meet<br />
future dem<strong>and</strong>s, a new <strong>pipeline</strong> was<br />
constructed interconnecting NJAW’s<br />
Barrier Isl<strong>and</strong> system with the Monmouth<br />
County system.<br />
The project involved the construction <strong>of</strong> a<br />
transmission main consisting <strong>of</strong><br />
approximately 42,500 linear feet <strong>of</strong> 20-inch<br />
<strong>and</strong> 24-inch diameter ductile iron pipe <strong>and</strong> a<br />
prefabricated underground metered<br />
interconnection. Also included in the<br />
project were two surface water crossings by<br />
means <strong>of</strong> horizontal directional drilling<br />
(HDD).<br />
The surface water crossings consist <strong>of</strong><br />
approximately 1,400 linear feet <strong>of</strong> 24-inch high density polyethylene pipe (HDPE) at the Manasquan<br />
Inlet between the Borough <strong>of</strong> Manasquan, Monmouth County <strong>and</strong> the Borough Point Pleasant<br />
Beach, Ocean County <strong>and</strong> approximately 910 linear feet <strong>of</strong> 24-inch HDPE at Wreck Pond between<br />
the Borough <strong>of</strong> Spring Lake <strong>and</strong> the Borough <strong>of</strong> Sea Girt, Monmouth County. The depths <strong>of</strong> the<br />
drill pipe below the Manasquan Inlet <strong>and</strong> Wreck Pond crossings were approximately 55 feet <strong>and</strong> 30<br />
feet, respectively.<br />
The prefabricated underground metered interconnection contains meters, flow control valves, <strong>and</strong><br />
SCADA equipment. A rechlorination system was constructed in the existing facility to maintain the<br />
chlorine residual coming out <strong>of</strong> the <strong>pipeline</strong>.<br />
HMM Role<br />
<strong>Hatch</strong> <strong>Mott</strong> MacDonald (HMM) was responsible for all aspects <strong>of</strong> the transmission main design,<br />
prepared plans <strong>and</strong> specifications, cost estimates, permit application, <strong>and</strong> construction<br />
administration. Besides the transmission main <strong>and</strong> the metered interconnection, HMM also designed<br />
five emergency interconnections with other water purveyors along the <strong>pipeline</strong> route.